News & Discussion: Adelaide Metro Trains

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
ozisnowman
High Rise Poster!
Posts: 354
Joined: Wed Jun 06, 2007 12:34 pm

Re: Electrification and Resleepering of TransAdelaide Network

#496 Post by ozisnowman » Fri Jun 06, 2008 12:18 pm

If they built a high speed line to Mount Barker via belair i doubt i would take 1 hour to get their by train
Also when petrol hits $3 a litre and above in the next couple of years i would hope that you arent living
at mount barker crawf...

Its good that they will standardise the lines... i didnt read that comment in any of the editorials
but i didnt have time to read the full report.

User avatar
rhino
Super Size Scraper Poster!
Posts: 3093
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

Re: Electrification and Resleepering of TransAdelaide Network

#497 Post by rhino » Fri Jun 06, 2008 1:45 pm

ozisnowman wrote:If they built a high speed line to Mount Barker via belair i doubt i would take 1 hour to get their by train
It's the bit from Adelaide to Belair that is the time-waster. It's a very out-of-the-way route to Mount Barker, but because trains can't negotiate steep hills, it's what yer stuck with. Give it up! Even when fuel prices get sky high, the bus (by then running on green gas) is going to do the trip quicker than any train. Not enough capacity? Get more busses. Any govt that wastes a few hundred million dollars on a commuter train to Mount Barker should not be governing.

And if I recall correctly, it used to take over an hour just to get to Bridgewater.
cheers,
Rhino

User avatar
Cruise
Banned
Banned
Posts: 2201
Joined: Tue Feb 27, 2007 9:19 pm
Location: Bay 115, Football Park

Re: Electrification and Resleepering of TransAdelaide Network

#498 Post by Cruise » Fri Jun 06, 2008 6:49 pm

I am sick to fucking deaf of hearing about a mount barker rail line!!! :roll:

User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

Re: Electrification and Resleepering of TransAdelaide Network

#499 Post by Wayno » Fri Jun 06, 2008 7:03 pm

What's the name of that town in the hills, Mt Something? starts with a B i think? :lol:
Opportunity is missed by most people because it is dressed in overalls and looks like work.

User avatar
Shuz
Banned
Banned
Posts: 2538
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

Re: Electrification and Resleepering of TransAdelaide Network

#500 Post by Shuz » Fri Jun 06, 2008 7:27 pm

Yeah, B-something. Theres a barking dog up there.

PhilH
Gold-Member ;)
Posts: 54
Joined: Tue Apr 17, 2007 7:00 pm

Re: Electrification and Resleepering of TransAdelaide Network

#501 Post by PhilH » Fri Jun 06, 2008 7:51 pm

Cruise wrote:I am sick to fucking deaf of hearing about a mount barker rail line!!! :roll:
Was that a deliberate pun, Cruise?
8)

User avatar
Cruise
Banned
Banned
Posts: 2201
Joined: Tue Feb 27, 2007 9:19 pm
Location: Bay 115, Football Park

Re: Electrification and Resleepering of TransAdelaide Network

#502 Post by Cruise » Fri Jun 06, 2008 7:55 pm

PhilH wrote:
Cruise wrote:I am sick to fucking deaf of hearing about a mount barker rail line!!! :roll:
Was that a deliberate pun, Cruise?
8)
You know, i never noticed that :lol:

User avatar
shiftaling
High Rise Poster!
Posts: 218
Joined: Sun Mar 02, 2008 12:49 am
Location: Modbury

Re: Electrification and Resleepering of TransAdelaide Network

#503 Post by shiftaling » Fri Jun 06, 2008 11:26 pm

Is there some kind of Federal review of the rail line through the hills? I thought that's why they are not doing the Belair line yet. I think a rail line that goes further than Belair would be good: Stirling, Aldgate, Bridgewater etc.

I like the way that you can hop on a train to regional centres like Newcastle or Wollongong from Sydney Central Station. Don't really know much about all the practicalities of transport engineering but it would be good to extend the network further IM extremely HO. Barossa too

User avatar
Shuz
Banned
Banned
Posts: 2538
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

Re: Electrification and Resleepering of TransAdelaide Network

#504 Post by Shuz » Fri Jun 06, 2008 11:37 pm

shiftaling wrote:Is there some kind of Federal review of the rail line through the hills? I thought that's why they are not doing the Belair line yet. I think a rail line that goes further than Belair would be good: Stirling, Aldgate, Bridgewater etc.

I like the way that you can hop on a train to regional centres like Newcastle or Wollongong from Sydney Central Station. Don't really know much about all the practicalities of transport engineering but it would be good to extend the network further IM extremely HO. Barossa too
I too would love to see SA acquire its own regional network - Barossa, Victor Harbor and Murray Bridge being the key locations. However, our population base is a bit too small just yet to support such a system. If Mount Barker had 50,000 and Murray Bridge had 30,000 people, I'd consider it feasible.
Barossa would need about 30-40k across the three towns to support it, and the Victor/Goolwa region would need about 50k at least.

User avatar
shiftaling
High Rise Poster!
Posts: 218
Joined: Sun Mar 02, 2008 12:49 am
Location: Modbury

Re: Electrification and Resleepering of TransAdelaide Network

#505 Post by shiftaling » Fri Jun 06, 2008 11:43 pm

Shuz wrote: I too would love to see SA acquire its own regional network - Barossa, Victor Harbor and Murray Bridge being the key locations. However, our population base is a bit too small just yet to support such a system. If Mount Barker had 50,000 and Murray Bridge had 30,000 people, I'd consider it feasible.
Barossa would need about 30-40k across the three towns to support it, and the Victor/Goolwa region would need about 50k at least.
Fair comment - SA ain't exactly a field of dreams I guess. But build it and they might possibly consider coming...

User avatar
Cruise
Banned
Banned
Posts: 2201
Joined: Tue Feb 27, 2007 9:19 pm
Location: Bay 115, Football Park

Re: Electrification and Resleepering of TransAdelaide Network

#506 Post by Cruise » Fri Jun 06, 2008 11:50 pm

Shuz wrote:
shiftaling wrote:Is there some kind of Federal review of the rail line through the hills? I thought that's why they are not doing the Belair line yet. I think a rail line that goes further than Belair would be good: Stirling, Aldgate, Bridgewater etc.

I like the way that you can hop on a train to regional centres like Newcastle or Wollongong from Sydney Central Station. Don't really know much about all the practicalities of transport engineering but it would be good to extend the network further IM extremely HO. Barossa too
I too would love to see SA acquire its own regional network - Barossa, Victor Harbor and Murray Bridge being the key locations. However, our population base is a bit too small just yet to support such a system. If Mount Barker had 50,000 and Murray Bridge had 30,000 people, I'd consider it feasible.
Barossa would need about 30-40k across the three towns to support it, and the Victor/Goolwa region would need about 50k at least.
Barossa? But that's north of the Little Para River so it must be demolished due to your dumb answers to SA problems :roll:

cleverick
High Rise Poster!
Posts: 108
Joined: Wed May 07, 2008 3:19 pm
Location: North Adelaide
Contact:

Re: Adelaide rail system fact sheet

#507 Post by cleverick » Sun Jun 08, 2008 7:34 pm

Which reminds me of this perfectly accurate cartoon of Valdman's on June 6th this year:
it depicts Mr. Foley proudly announcing to the press that after this year's budget, we will have a rail system as good as the one we had in 1958.

It's rare that I understand these cartoons, and frankly I preferred Atchison, but I laughed at this one.

urban
Legendary Member!
Posts: 610
Joined: Thu Apr 12, 2007 10:59 am
Location: City of Unley

Re: Electrification and Resleepering of TransAdelaide Network

#508 Post by urban » Tue Jun 10, 2008 11:23 am

shiftaling wrote:Is there some kind of Federal review of the rail line through the hills? I thought that's why they are not doing the Belair line yet. I think a rail line that goes further than Belair would be good: Stirling, Aldgate, Bridgewater etc.

I like the way that you can hop on a train to regional centres like Newcastle or Wollongong from Sydney Central Station. Don't really know much about all the practicalities of transport engineering but it would be good to extend the network further IM extremely HO. Barossa too
I think the federal review is looking at the feasibility of rerouting the interstate freight route to avoid the hills by coming round the north and joining onto the existing heavy rail route through the northern suburbs. The theory being that despite having to travel further it would take the same time because the trains would avoid the steep winding sections which currently dramatically slow the travel speeds.

User avatar
Ho Really
Super Size Scraper Poster!
Posts: 2721
Joined: Sun Aug 27, 2006 3:29 pm
Location: In your head

Re: Electrification and Resleepering of TransAdelaide Network

#509 Post by Ho Really » Tue Jun 10, 2008 10:38 pm

urban wrote:
shiftaling wrote:Is there some kind of Federal review of the rail line through the hills? I thought that's why they are not doing the Belair line yet. I think a rail line that goes further than Belair would be good: Stirling, Aldgate, Bridgewater etc.

I like the way that you can hop on a train to regional centres like Newcastle or Wollongong from Sydney Central Station. Don't really know much about all the practicalities of transport engineering but it would be good to extend the network further IM extremely HO. Barossa too
I think the federal review is looking at the feasibility of rerouting the interstate freight route to avoid the hills by coming round the north and joining onto the existing heavy rail route through the northern suburbs. The theory being that despite having to travel further it would take the same time because the trains would avoid the steep winding sections which currently dramatically slow the travel speeds.
That should also be safer.

Cheers
Confucius say: Dumb man climb tree to get cherry, wise man spread limbs.

User avatar
rhino
Super Size Scraper Poster!
Posts: 3093
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

Re: Electrification and Resleepering of TransAdelaide Network

#510 Post by rhino » Wed Jun 11, 2008 7:29 am

The down side is that Adelaide will no-longer be on a through-route. The Adelaide Freight Terminal would be a dead-end siding, meaning that through-freights (eg Melbourne-Perth) will either not carry any Adelaide loading, or will take longer because they have to back-track to get to Adelaide. Time is money, especially in transport, with today's "just-in-time" mentallity, and I would hate to see freight moving back to road because rail just takes too long. Alternatively, the freight terminal could be moved out to Mallala. Don't know if that's a good thing or not.
cheers,
Rhino

Post Reply

Who is online

Users browsing this forum: No registered users and 0 guests