[COM] 413 KWS Vue on King William | 89m | 28Lvl | Residential
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
Joy works for the architect firm involved with this project. Any elaboration, although greatly appreciated, would probably break confidentiality agreements.
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
I would have thought that by confirming that Goodman are out when they haven't made any formal announcement (that I am aware of) was breaching confidentiality...
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
From today, lots of excavation on site:
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
Glad to see our developments aren't being affected too badly by all of this rain.
I drive past the Anzac Hwy / South Rd intersection and am amazed that it is not flooded!
I drive past the Anzac Hwy / South Rd intersection and am amazed that it is not flooded!
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
next Stage is being applied for now. Also looks like preparation for crane base is happeneing now.
DA/37/2008/2 9/07/2008
Application Assessed on Merit
Construction of a commercial (retail/office) building comprising 15 building levels plus roof plant room, four levels of basement car parking and ancillary landscaping - STAGE 2 - BASEMENT RING BEAMS & GROUND FLOOR SLAB
Development Site, 413-427 King William Street, ADELAIDE SA 5000
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
Thanks for the heads up Ben.
If there's going to be four levels of basement parking, you'd expect the excavation to be a lot deeper.
Keep us posted with that crane mate!
If there's going to be four levels of basement parking, you'd expect the excavation to be a lot deeper.
Keep us posted with that crane mate!
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
They have moved the fence out to KWS and put bollards up. Also digging up the paving on King William this morning. Excavation is getting deep now. I'm interested in this crane that is coming from over seas and how big it will be.
Joy do you know what model ect it will be? or dates of installation?
Joy do you know what model ect it will be? or dates of installation?
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
Hows this one going Ben? I noticed that the crawler crane is now in the excavated site, so assume piling is happening on the southern side now.
Also, how about the other two sites near you, sorry to be a pain mate!
Also, how about the other two sites near you, sorry to be a pain mate!
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
No prob at all. Love all the action around here. I'll take some pics at lunch. Heaps of action on both this and Wave/Edge.Pikey wrote:Hows this one going Ben? I noticed that the crawler crane is now in the excavated site, so assume piling is happening on the southern side now.
Also, how about the other two sites near you, sorry to be a pain mate!
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
How deep are they going?
Good photos btw!
Good photos btw!
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
The basement will be 4 levels so will be a huge hole once finished.
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
Just another question... what's with the wierd looking concrete on the walls of the excavation... were they there before or are they put in before the excavation starts?
[COM] Re: #U/C: 413-427 King William St - 15 lvl 60m -Hills Inds
I don't know much about it either but thats the piling what they put around the edge of the site to stop it callapsing on them and forms the edge of the building, the same can be seen at 400 KWS.Norman wrote:Just another question... what's with the wierd looking concrete on the walls of the excavation... were they there before or are they put in before the excavation starts?
Who is online
Users browsing this forum: No registered users and 5 guests