[COM] North Terrace Streetscape Upgrade

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#136 Post by Ben » Wed Dec 03, 2008 10:48 am

From The Messenger:
North Terrace streetscape slow down
03Dec 08

IT HAS BEEN a North Tce eyesore for the past two-and-a-half years and is running 28 months behind schedule.

But the City Council insists the latest stage of the North Tce streetscape upgrade will be finished by Christmas.

Upgrading the 200m stretch between Pulteney St and Frome Rd has taken 29 months - averaging a snail’s-paced 1.7m a week.

The $7m upgrade, managed by Town Hall but jointly funded by the State Government, includes new paving, landscaping and a water feature near the Frome Rd corner.

The continuing works have reduced the prominent location to a cluttered mess, with barriers, large piles of dirt and pedestrian detours.

Lord Mayor Michael Harbison said the slow progress had been “frustrating”. However, he said workers had to down tools for almost 12 months while the facade of UniSA’s Brookman building was restored last year.

Funding for the upgrade only became available to the university after the North Tce roadworks had started.

“Faced with a choice between seeing the Brookman building restored or not, I think it was the right thing to do, it will be a better result for the long term,” Mr Harbison said.

He said there also had been other delays, but these had not increased the cost of the project.

“The big tree around which the water feature was designed actually shattered, fell in half, before work started, so we had to do a bit of a redesign as well.”

The upgrade is the second phase of a four-stage project redeveloping Adelaide’s premier cultural boulevard.

Comparative construction times

5 days: A full-size replica of Vienna’s Schonbrunn Palace at AAMI Stadium for the Andre Rieu concert last month
4 months: Temporary grandstands at Victoria Park for Clipsal 500
8 months: 1.6km extension to tram line from Victoria Sq to North Tce
1 year, 6 months: $1.1 billion desalination plant at Port Stanvac (State Government estimate)
2 years, 5 months: Redevelop 200m stretch of North Tce streetscape from Pulteney St to Frome Rd. Stage two was supposed to start in September 2005 and take about 11 months to complete but was delayed by funding delays. The next stage will cover the stretch in front of Government House between Kintore Ave and King William St.

User avatar
Shuz
Banned
Banned
Posts: 2538
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#137 Post by Shuz » Wed Dec 03, 2008 11:05 am

Anyone want to place bets how long the next stage will take? :P

User avatar
Düsseldorfer
High Rise Poster!
Posts: 288
Joined: Sat Sep 15, 2007 3:52 am

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#138 Post by Düsseldorfer » Wed Dec 03, 2008 11:22 am

Shuz wrote:Anyone want to place bets how long the next stage will take? :P
oh gawd it really took that long, and i was getting frustrated thinking it had been like that for just this year, wow, and the tram was built in much less time

the next stage will hopefully only take 6 months, but if the same thing happens again, probably looking at 2 years :roll:

User avatar
AtD
VIP Member
VIP Member
Posts: 4579
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#139 Post by AtD » Wed Dec 03, 2008 11:27 am

Free pie for recent photos! :D

User avatar
Shuz
Banned
Banned
Posts: 2538
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#140 Post by Shuz » Wed Dec 03, 2008 11:30 am

Well, I'm probably most likely going to go on a photo walk around town tomorrow so I'll try and get some taken. But I don't want any pie thanks - a Cadbury Chocolate Classic should hit the spot though :D

User avatar
monotonehell
VIP Member
VIP Member
Posts: 5466
Joined: Fri Feb 01, 2008 12:10 am
Location: Adelaide, East End.
Contact:

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#141 Post by monotonehell » Wed Dec 03, 2008 7:01 pm

AtD wrote:Free pie for recent photos! :D
I'm still waiting on your promise of pie from last time.

Fool me once... ;)
Exit on the right in the direction of travel.

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#142 Post by jk1237 » Wed Dec 03, 2008 7:10 pm

Council reckons it will be finished by christmas, yeah right :roll:
It doesn't look anywhere near finished, and they've only really started the final paving at the Frome Rd end only, no where else that Ive noticed. It will be a couple of months minimum

Maybe the ACC mean next christmas

User avatar
monotonehell
VIP Member
VIP Member
Posts: 5466
Joined: Fri Feb 01, 2008 12:10 am
Location: Adelaide, East End.
Contact:

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#143 Post by monotonehell » Wed Dec 03, 2008 7:18 pm

jk1237 wrote:Council reckons it will be finished by christmas, yeah right :roll:
It doesn't look anywhere near finished, and they've only really started the final paving at the Frome Rd end only, no where else that Ive noticed. It will be a couple of months minimum

Maybe the ACC mean next christmas
They do mean next Christmas

You mean the one after next. ;P
Exit on the right in the direction of travel.

crawf
Donating Member
Donating Member
Posts: 5521
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#144 Post by crawf » Wed Dec 03, 2008 7:21 pm

29 months?!, that is an absolute disgrace

User avatar
Tyler_Durden
High Rise Poster!
Posts: 333
Joined: Wed Aug 24, 2005 6:11 pm

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#145 Post by Tyler_Durden » Fri Dec 05, 2008 12:20 pm

I don't care how long it takes. I only care what the result looks like.

I think they did a great job with stage 1 so I have similar hopes here.

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#146 Post by jk1237 » Tue Dec 23, 2008 5:52 pm

I have just witnessed the most amazing thing. THIS IS FINISHED. Looks like it just needs some touching up on the signs and seats, but the paving is finished and that horrible fence is gone, and its all opened up. Looks great. I might go back in and take some snaps. :P :P :P

User avatar
Howie
VIP Member
VIP Member
Posts: 4874
Joined: Mon Mar 21, 2005 3:55 pm
Location: Adelaide
Contact:

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#147 Post by Howie » Tue Dec 23, 2008 6:15 pm

Yeah it looks pretty good I reckon, the water feature will be pretty nice. Although they need some shading there, can't imagine many people wanting to eat their lunches in the searing heat.

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#148 Post by jk1237 » Tue Dec 23, 2008 9:46 pm

here are 3 pics just before it got dark
Image

Image

Image

crawf
Donating Member
Donating Member
Posts: 5521
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#149 Post by crawf » Tue Dec 23, 2008 10:02 pm

Thanks mate

User avatar
Shuz
Banned
Banned
Posts: 2538
Joined: Sat Jun 02, 2007 1:48 pm
Location: Glandore

[COM] Re: #U/C: North Terrace | Streetscape Upgrade Stage 2

#150 Post by Shuz » Tue Dec 23, 2008 10:14 pm

Oooh, ahhhh.

Post Reply

Who is online

Users browsing this forum: Majestic-12 [Bot] and 1 guest