News & Discussion: Water Infrastructure

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Post Reply
Message
Author
User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

Re: Smaller Infrastructure Projects

#91 Post by Wayno » Thu Dec 04, 2008 7:06 am

rogue wrote:
Bike lane trial for city street

ADELAIDE City Council will spend $500,000 on a 500m-long bike lane that will eliminate half the car-parking spaces on the northern side of Sturt St.
Good one! whilst not the busiest street, i hope this trial leads to more bike lanes elsewhere in the city...
Opportunity is missed by most people because it is dressed in overalls and looks like work.

UrbanSG
VIP Member
VIP Member
Posts: 1848
Joined: Fri Aug 19, 2005 8:55 am

Re: Smaller Infrastructure Projects

#92 Post by UrbanSG » Thu Dec 04, 2008 9:43 am

A lot of the businesses along Sturt Street and nearby streets rely on free parking along Sturt Street. There are already problems with a lack of parking in the area. The CMI car showroom development was going to ease parking problems as a lot of workers park on the street and move their cars every 2 hours. CMI has not officially commenced construction yet. There was public consultation about this a while ago and a lot of residents, businesses along Sturt Street were opposed so what was the point of that consultation?

Sturt Street of all streets is a stupid place for this lane seeing as it has no significant link west unlike street further north in the CBD or along South Terrace.

We are not Copenhagen. Adelaide is no where near dense enough to support this type of development. We are far too car orientated. You need to change densities etc before schemes like this will work not the other way around. $500,000 is a hell of a lot of money too which should be focused on upgrades in other parts of CBD.

This bike lane is being rushed imo because of the wastewater pipeline that is going to be constructed next year along Sturt Street. I know few businesses along Sturt Street who may relocate as a result of this. The loss of 30 odd car parks is going to be very problematic for this street believe me.

User avatar
SRW
Donating Member
Donating Member
Posts: 3650
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

Re: Smaller Infrastructure Projects

#93 Post by SRW » Thu Dec 04, 2008 1:00 pm

UrbanSG wrote:A lot of the businesses along Sturt Street and nearby streets rely on free parking along Sturt Street. There are already problems with a lack of parking in the area. The CMI car showroom development was going to ease parking problems as a lot of workers park on the street and move their cars every 2 hours. CMI has not officially commenced construction yet. There was public consultation about this a while ago and a lot of residents, businesses along Sturt Street were opposed so what was the point of that consultation?

Sturt Street of all streets is a stupid place for this lane seeing as it has no significant link west unlike street further north in the CBD or along South Terrace.

We are not Copenhagen. Adelaide is no where near dense enough to support this type of development. We are far too car orientated. You need to change densities etc before schemes like this will work not the other way around. $500,000 is a hell of a lot of money too which should be focused on upgrades in other parts of CBD.

This bike lane is being rushed imo because of the wastewater pipeline that is going to be constructed next year along Sturt Street. I know few businesses along Sturt Street who may relocate as a result of this. The loss of 30 odd car parks is going to be very problematic for this street believe me.
As someone who used to work in the area, I agree. As much as I'm inclined to support alternative transport infrastructure, this really doesn't seem the best use of money. I'd much rather see it be spent on pedestrian-focused street upgrades or cycling projects that will actually make a difference.
Keep Adelaide Weird

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

Re: Smaller Infrastructure Projects

#94 Post by jk1237 » Thu Dec 04, 2008 10:07 pm

UrbanSG wrote:A lot of the businesses along Sturt Street and nearby streets rely on free parking along Sturt Street. There are already problems with a lack of parking in the area. The CMI car showroom development was going to ease parking problems as a lot of workers park on the street and move their cars every 2 hours. CMI has not officially commenced construction yet. There was public consultation about this a while ago and a lot of residents, businesses along Sturt Street were opposed so what was the point of that consultation?

Sturt Street of all streets is a stupid place for this lane seeing as it has no significant link west unlike street further north in the CBD or along South Terrace.

We are not Copenhagen. Adelaide is no where near dense enough to support this type of development. We are far too car orientated. You need to change densities etc before schemes like this will work not the other way around. $500,000 is a hell of a lot of money too which should be focused on upgrades in other parts of CBD.

This bike lane is being rushed imo because of the wastewater pipeline that is going to be constructed next year along Sturt Street. I know few businesses along Sturt Street who may relocate as a result of this. The loss of 30 odd car parks is going to be very problematic for this street believe me.
I disagree. Sturt Street is so wide considering its traffic flow, that these types of bike lanes would be perfect. The loss of 30 car parks to me has a care factor of zero, and if some of these crappy little 1 storey 1970s+ businesses move out, and are replaced by some taller residential buildings, then I'm all for it. Sturt st aint exactly a great 'high street strip'. How are we ever gonna change this ridiculous over reliance on cars, if we never make a start.
Some cyclists could be encouraged to ride down Sturt st to connect to the bike track that runs along West Tce in the parklands. I think Franklin St is wide enough for these types of bike lanes also.

The CBD should not revolve around cars

UrbanSG
VIP Member
VIP Member
Posts: 1848
Joined: Fri Aug 19, 2005 8:55 am

Re: Smaller Infrastructure Projects

#95 Post by UrbanSG » Thu Dec 04, 2008 10:44 pm

If the CBD does not revolve around cars when virtually the entire metropolitan area does than kiss goodbye to a CBD with any activity. I agree that increasing pedestrian priority is important but you can't get rid of cars altogether or even substantially. Making a start should instead include a gradual increase in residential densities, TOD's and so on. Then you will see people start to become less car dominated. Expecting most people to ditch their cars in a city like Adelaide that has massive urban sprawl is rediculous.

Sometimes the Council goes too far with what it expects it will encourage with its capital spending. A small bike lane along a CBD street that has virtually no connection to the nearby western suburbs and has connection to a poorly used West Terrace bike path (poorly used as people fear getting hit over the head and mugged) is stupid and will not change transport patterns in Adelaide.

Those 'crappy 1970's businesses' provide the street with a high level of activity during the day. Good luck getting much in the way of substantial residential development occuring in this area thanks to restrictive height and plot ratio limits. Instead we may be left with abandoned businesses and no replacements. That will be a great outcome :wank:

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

Re: Smaller Infrastructure Projects

#96 Post by jk1237 » Thu Dec 04, 2008 10:56 pm

UrbanSG wrote: Those 'crappy 1970's businesses' provide the street with a high level of activity during the day. Good luck getting much in the way of substantial residential development occuring in this area thanks to restrictive height and plot ratio limits. Instead we may be left with abandoned businesses and no replacements. That will be a great outcome :wank:
Why dont we then turn the abandoned business into carparks, caus of the huge shortage of car parking in the Adelaide CBD, NOT, and caus everyone expects to get a carpark right out the front of a business in the CBD of a 1 million+ city
:wank: :wank:

User avatar
Prince George
Legendary Member!
Posts: 974
Joined: Wed Sep 10, 2008 11:02 pm
Location: Melrose Park

Re: Smaller Infrastructure Projects

#97 Post by Prince George » Fri Dec 05, 2008 12:44 am

(I wonder if the person who designed that auto-erotic emoticon stopped to think about how much electricity would be consumed by so many posts using it? I'm sure it must be contributing to global warming.)

You could probably gauge how important the parking on the street is to the businesses by just taking a look at the kinds of businesses and then looking at the duration that you can park there. I can't recall what is actually on Sturt St anymore, so I'll just talk in general terms. I reckon that for most kinds of businesses, your visit would last about 30 mins. If the street provides, say, 1 hour parking then there isn't time to do much more than park, go to the shop, and get back in your car and head off. So there would be a healthy turnover in parking and if the street is frequently full then it's probably serving the shops pretty heavily.

OTOH, if the parking is 4 hour, then that's plenty of time to park there, maybe go to a shop, but then also head off to some other part of town. Meanwhile for your half-hour of local shopping you consume 3-4 hours of parking, which means that you aren't leaving the spots free for someone else to come to the area. In fact, they are probably then having to repeat this pattern on some other street (park there and wander over to the starting place, using up a spot on that other street for the cycle to continue).

In the first case, I can see how losing 30 spots could be a burden for the shops; in the second, I think that it has little or no effect. In fact, I think that this points to a possible mitigation - perhaps by reducing the parking duration on (parts of?) the street it is possible to offset the loss of the 30 places.

But half a million dollars does seem like a lot, especially if you weren't already tearing up the street for some other reason. Perhaps it would be a good idea for the council to start by investing in painted markings on a larger number. I've become a fan of the sharrow over here, which are popular in cycling-friendly west-coast cities like Portland and San Francisco. Of course, they are particularly useful on streets that are too narrow for a full bike lane, which isn't something that Adelaide suffers from.

User avatar
Norman
Donating Member
Donating Member
Posts: 6488
Joined: Sun Mar 25, 2007 1:06 pm

Re: Smaller Infrastructure Projects

#98 Post by Norman » Sun Dec 07, 2008 6:11 pm

Norman wrote:The Sheidow Park Connector (not sure of the official name) is close to completion, the intersection on Lonsdale Road is complete and all the lighting has too. Not sure if all the bitumen is down, as I was driving past it at night. I would expect it to open soon.
It's opening on the 18th apparently, with a ceremony ay 9.30am. I'll try to attend, but I have to change my working hours to do so. Anyone else coming down for that one?

crawf
Donating Member
Donating Member
Posts: 5527
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

Re: Smaller Infrastructure Projects

#99 Post by crawf » Mon Dec 08, 2008 3:20 am

Went past this tonight (first time in over 10 years since I've been down south), the new road looks good and the Hallett Cove Shopping Centre revamp is turning out quite good

peas_and_corn
Legendary Member!
Posts: 522
Joined: Thu Oct 30, 2008 9:32 pm

Re: Smaller Infrastructure Projects

#100 Post by peas_and_corn » Mon Dec 08, 2008 3:40 pm

I believe the TTG council is funding a renovation of its new CEO's house :P

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

Re: Smaller Infrastructure Projects

#101 Post by mattblack » Thu Dec 11, 2008 10:35 am

Norman wrote:
Norman wrote:The Sheidow Park Connector (not sure of the official name) is close to completion, the intersection on Lonsdale Road is complete and all the lighting has too. Not sure if all the bitumen is down, as I was driving past it at night. I would expect it to open soon.
It's opening on the 18th apparently, with a ceremony ay 9.30am. I'll try to attend, but I have to change my working hours to do so. Anyone else coming down for that one?

Heres the brochure of the connector. also shows possible housing increase and development of some of the sheep paddocks down south.

Pat28
High Rise Poster!
Posts: 119
Joined: Fri May 23, 2008 4:42 pm

Re: Smaller Infrastructure Projects

#102 Post by Pat28 » Fri Dec 12, 2008 11:14 am

mattblack wrote: Heres the brochure of the connector. also shows possible housing increase and development of some of the sheep paddocks down south.
where's the link??
Besser Verkehr in den Bergen

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

Re: Smaller Infrastructure Projects

#103 Post by mattblack » Fri Dec 12, 2008 8:53 pm

Pat28 wrote:
mattblack wrote: Heres the brochure of the connector. also shows possible housing increase and development of some of the sheep paddocks down south.
where's the link??
Oh yeah, guess that would be handy! :D

http://www.marion.sa.gov.au/web%5Cwebma ... ochure.pdf

Some further info. The road will be called Patpa Drive, meaning 'Southern wind' in the local Kaurna language.

User avatar
AG
VIP Member
VIP Member
Posts: 2093
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

Re: #Article: City plan to use recycled water

#104 Post by AG » Sat Jan 03, 2009 4:25 pm

Sections of Anzac Highway around the Keswick railway bridge are currently having the pipeline sections being installed as we speak.

rubberman
Super Size Scraper Poster!
Posts: 2006
Joined: Tue Sep 04, 2007 10:32 pm
Location: ADL ex DRW, ASP, MGB

Re: #Article: City plan to use recycled water

#105 Post by rubberman » Sun Jan 04, 2009 10:39 am

I notice that the Property Council wants the Government (code for the rest of us taxpayers) to pay for the pipework, and no doubt will want the water at a reduced cost (code for free). :roll:

Given that this water has to be treated using lots of energy, just recycling for the sake of it might not be the best for the environment unless there is some other payoff.

Giving this water away to private interests (which is what is happening if consumers are let off the cost of the infrastructure) sends the wrong signal about the value of water. (I do not have the same problem with it going on public facilities like parklands or charities such as Vinnies and the Salvos since everybody can get to benefit from that - even people who live elsewhere but travel through the greenery benefit).

Another option might be to only let businesses have it if they also install completely new state of the art reduced carbon footprint air con to go with it...or it is only available to businesses that have the highest green rated buildings. :idea:


So basically, I am suggesting that first offer of the water goes for public purposes or to charities, next offer goes to businesses that have the highest green rated buildings, and then and only then to those businesses who want to just replace a bit of plumbing in existing inefficient systems...and even then they should be first off, last on if there is a shortage.

Post Reply

Who is online

Users browsing this forum: No registered users and 0 guests