Stage 2 of the Breakout Creek Wetland is currently under way between Henley Beach & Tapleys Hill roads ...

Image

Image

User avatar
Omicron
Super Size Scraper Poster!
Posts: 2336
Joined: Mon Oct 15, 2007 2:46 pm

Re: Smaller Infrastructure Projects

#107 Post by Omicron » Tue Feb 24, 2009 11:29 pm

Those last few kilometres of the Torrens have been quite underwhelming (almost sad, in fact) for a few years now, so hopefully the improvements will be effective. Goodness me; I remember when the channel was always full and demonstrably flowing. When a bit of rain comes along and greens everything up nicely, I ought to have a stroll past and see how that end of town is coming along.

User avatar
AG
VIP Member
VIP Member
Posts: 2093
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

#Article: Underground water rescue for Adelaide

#108 Post by AG » Thu Apr 16, 2009 9:43 am

Underground water rescue for Adelaide
GREG KELTON, STATE EDITOR
April 15, 2009 11:15pm

BILLIONS of litres of water in deep aquifers under the city will be used as back-up water supplies for Adelaide if Murray water continues to dry up.

Officers from the Water, Land and Biodiversity Department are carrying out an audit of the aquifers which could contain more than two years' supply of water.

The aquifers can be more than 230m below the surface and were tapped during a drought in the 1960s with more than 10,000 megalitres of water being drawn out.

Water Security Minister Karlene Maywald told The Advertiser yesterday the officers were undertaking investigations into the amount of water that could be drawn "in an emergency situation".

"There is a substantial amount of water in the deep aquifers underneath Adelaide," she said.

"The problems with those aquifers is they have a very slow recharge rate. So it's how much you can sustainably draw out without having an impact on the quality of the water in those aquifers."

But she said the state had supplies in place for next year and would have the following year's reserves in place over the next 12 months.

Water is captured in underground caverns either through natural drainage or stormwater run-off. These can be found between 50m and more than 230m below the surface. Bores are sunk and the water then piped into the main water system.

In 1967-68 more than 10,000 megalitres were pumped out over a seven-month period.

In the past 12 years, more than 700 bores have been drilled in the metropolitan area to use water from aquifers which are only 5m to 11m below the surface.

In other developments:

MRS MAYWALD also ruled out using bottled water as an option saying the state had two winters' supply before reserves were depleted and that was if there was no rain at all in that time.

THE OPPOSITION will signal its intentions to make water a key issue in the 2010 election with Liberal leader Martin Hamilton-Smith making a new policy announcement today.

THE MURRAY-DARLING Basin Authority has said it will deliver 4.4 billion litres to important environmental icon sites in NSW, Victoria and SA this month.

Mrs Maywald said there were 200 gigalitres in storage in the Hume and Dartmouth dams upstream and another 112 gigalitres in storage in reservoirs in the Adelaide Hills.

She said there was also water being held for SA in the Murrumbidgee Dam.

"We have also secured access to storage in the Hume and Dartmouth Dams for up to a year and a half of our critical human needs," she said.

"So we can actually store more water in the dams if more becomes available.

"We have about 12 months' storage capacity in the Adelaide Hills. So what we will be looking to do is pump our reserves to the maximum into the Mt Lofty storages. "We are also negotiating with NSW and Victoria for what is known as `run of the river water' which is used to move water from A to B."

Mrs Maywald said the use of bottled water was a worst case scenario.

"If the pipeline breaks between Morgan and Whyalla then we have to look at providing water and those are the type of situations where we would look at using bottled water," she said.

"We want to send a very clear message that all this work is being done to ensure we don't have to run out of water," she said.

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

Re: #Article: Underground water rescue for Adelaide

#109 Post by mattblack » Thu Apr 16, 2009 11:13 pm

Yes, lets go from scewing one resource to screwing another ........ BRILLIANT IDEA !!!

User avatar
AG
VIP Member
VIP Member
Posts: 2093
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

Re: #Article: Underground water rescue for Adelaide

#110 Post by AG » Thu Apr 16, 2009 11:18 pm

mattblack wrote:Yes, lets go from scewing one resource to screwing another ........ BRILLIANT IDEA !!!
It's interesting that you mention this because Shanghai has been doing this for some time to meet its own requirements. The combination of accelerating water usage from bores and rapid construction of heavy structures on poor quality soils above is creating increasing settlement issues across the city. In the past century, some parts of Shanghai have sunk by over 2m.

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

Re: #Article: Underground water rescue for Adelaide

#111 Post by mattblack » Fri Apr 17, 2009 9:20 am

Im sure this will come as comforting news to residents of low lying areas.

User avatar
Omicron
Super Size Scraper Poster!
Posts: 2336
Joined: Mon Oct 15, 2007 2:46 pm

Re: #Article: Underground water rescue for Adelaide

#112 Post by Omicron » Sat Apr 18, 2009 12:09 am

After careful thought, I have decided to disguise the Water [In]Security Minister Karlene Maywald with a throw-rug and scatter her with cushions.

User avatar
Cruise
Banned
Banned
Posts: 2209
Joined: Tue Feb 27, 2007 9:19 pm
Location: Bay 115, Football Park

Re: #Article: Underground water rescue for Adelaide

#113 Post by Cruise » Sat Apr 18, 2009 3:09 pm

Omicron wrote:After careful thought, I have decided to disguise the Water [In]Security Minister Karlene Maywald with a throw-rug and scatter her with cushions.
Or you could spray her with your hose.

User avatar
sageru
Sen-Rookie-Sational
Posts: 8
Joined: Thu Jan 15, 2009 12:28 am
Location: Glenside/Seacliff

Re: #Article: Underground water rescue for Adelaide

#114 Post by sageru » Sun Apr 19, 2009 3:38 pm

In a particularly unmotivated and listless period of last year I decided to do engineering at TAFE. I remember my lecturer told us how Adelaide's water pipes are only replaced on failure or otherwise patched up until they fail at a later date and that 40% of all water that travels through the pipes is lost. Cost wise it would be higher than a desalination plant--not to mention delays to traffic, labour costs etc.--but it's a pretty alarming idea that there is ample water reaching Adelaide, just that a large percentage of it is lost through wastage. These underwater aquifers are probably replenished by the water we lose from our pipes :roll:

User avatar
monotonehell
VIP Member
VIP Member
Posts: 5466
Joined: Fri Feb 01, 2008 12:10 am
Location: Adelaide, East End.
Contact:

Re: #Article: Underground water rescue for Adelaide

#115 Post by monotonehell » Sun Apr 19, 2009 5:05 pm

sageru wrote:In a particularly unmotivated and listless period of last year I decided to do engineering at TAFE. I remember my lecturer told us how Adelaide's water pipes are only replaced on failure or otherwise patched up until they fail at a later date and that 40% of all water that travels through the pipes is lost. Cost wise it would be higher than a desalination plant--not to mention delays to traffic, labour costs etc.--but it's a pretty alarming idea that there is ample water reaching Adelaide, just that a large percentage of it is lost through wastage. These underwater aquifers are probably replenished by the water we lose from our pipes :roll:
While I agree that maintenance is an issue, I find the figure of 40% too high to believe.

Anyone have a source for this?
Exit on the right in the direction of travel.

User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

Re: #Article: Underground water rescue for Adelaide

#116 Post by Wayno » Sun Apr 19, 2009 8:25 pm

I also doubt Adelaide loses 40% - simply seems too much.

While i don't have local leakage statistics, i used to be involved with Macquarie Bank who bought "Thames Water" which supplies water to the London area. Back in 2006, their leakage rate was ~33% (2800 meglitres distributed, with only 1700megalitres actually arriving at houses & industry). Many of the water pipes are still from the victorian era, and literally leak like a sieve.
Opportunity is missed by most people because it is dressed in overalls and looks like work.

User avatar
sageru
Sen-Rookie-Sational
Posts: 8
Joined: Thu Jan 15, 2009 12:28 am
Location: Glenside/Seacliff

Re: #Article: Underground water rescue for Adelaide

#117 Post by sageru » Mon Apr 20, 2009 3:41 am

Well I used to take rather detailed lecture notes which I then lost but yes 40% is probably a rather inflated figure, our lecturer was passionate about civil engineering :D
After a bit of Googling I found this http://www.ministers.sa.gov.au/news.php?id=3381 which gives a statistic which this http://www.liemberger.cc/downloads/publ ... t%204.pdfi then explains. Apparently we're actually quite good if the government estimated ILI is correct. I think I need somebody else needs to make sense of this because it is 3am and it is all a blur.

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

Re: #Article: Underground water rescue for Adelaide

#118 Post by mattblack » Mon Apr 20, 2009 1:57 pm

Wayno wrote:I also doubt Adelaide loses 40% - simply seems too much.
Just think of it as a Adelaide aquifer recharge system, just about as efficient a one-way expressway. :D

fabricator
Legendary Member!
Posts: 537
Joined: Mon Oct 27, 2008 9:13 pm

Re: #Article: Underground water rescue for Adelaide

#119 Post by fabricator » Sun Jul 05, 2009 12:02 am

sageru wrote:Well I used to take rather detailed lecture notes which I then lost but yes 40% is probably a rather inflated figure, our lecturer was passionate about civil engineering :D
After a bit of Googling I found this http://www.ministers.sa.gov.au/news.php?id=3381 which gives a statistic which this http://www.liemberger.cc/downloads/publ ... t%204.pdfi then explains. Apparently we're actually quite good if the government estimated ILI is correct. I think I need somebody else needs to make sense of this because it is 3am and it is all a blur.
http://www.sawater.com.au/NR/rdonlyres/ ... sLeaks.pdf
It is estimated we lose about 7% of the water supplied from our metropolitan system each year – about 12 gigalitres
We also recorded an Infrastructure Leakage Index (ILI) level of 1.1
AdelaideNow: Now with 300% more Liberal Party hacks, at no extra cost.

User avatar
Norman
Donating Member
Donating Member
Posts: 6488
Joined: Sun Mar 25, 2007 1:06 pm

Re: #Article: City plan to use recycled water

#120 Post by Norman » Wed Jul 15, 2009 1:13 pm

I think this is the right thread? From the Guardian Messenger:
Plant on track for early water

15 Jul 09 @ 07:33am
by David Goldsmith

RECYCLED water from the Glenelg Waste Water Treatment Plant could begin flowing to city parklands before the end of this year.

Jointly funded by the Federal and State governments, the $75 million project will direct at least 1.3 billion litres of treated wastewater a year to Adelaide City parklands.

The project is scheduled to be completed by mid-2010.

“However construction is tracking ahead of schedule and the first water could be delivered as early as December,” SA Water’s chief operating officer John Ringham said.

The work includes an upgrade of the Barcoo Rd treatment plant, laying an 8km Glenelg-Adelaide pipeline and linking it with a 34km line around the city.

Mr Ringham said the treatment plant work was close to completion.

“The large pipes and treatment plant have been constructed and installed, work is under way on the plant’s electrical components and contractors are finishing the installation of new pump and filter connections,” he said.

CityGreen Alliance construction crews are also in the final stages of testing four newly-built storage lagoons capable of holding a combined 22 million litres at the Glenelg site.

Mr Ringham said SA Water was in talks with more than 30 potential customers, including councils, sporting groups, schools and businesses, about making use of the recycled water.

Among the groups to have expressed an interest was the Adelaide Sailing Club.

Club Commodore Mike Badenoch said they had applied to tap into the pipeline to allow members to wash down their boats on the club lawns a practice that was banned due to the drought.