COM: Glenelg Tramline Upgrade
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
Re: #U/C: South Road Tram Overpass
No trams tomorrow morning due to construction delays with the new track "not settling"...
http://www.news.com.au/adelaidenow/stor ... 01,00.html
Rail work delays keep Trams off peak-hour tracks
http://www.news.com.au/adelaidenow/stor ... 01,00.html
Rail work delays keep Trams off peak-hour tracks
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
Re: #U/C: South Road Tram Overpass
According to 891 radio, a test tram may run over the temporary track "in an hour or so" (about 3pm), with services to resume if the test is successful...
Re: #U/C: South Road Tram Overpass
Yeah, I went to the tram stop, and the guys informed me it was closed. When I asked why (so to share with you guys), I was bluntly told. "The whole f***** thing's just bloody f*****."
- danielphin
- Gold-Member ;)
- Posts: 55
- Joined: Fri May 16, 2008 11:51 pm
- Location: Perth
- Contact:
Re: #U/C: South Road Tram Overpass
Tell me about it, those tracks look really bad. Is it the perspective of the photo or what?
Re: #U/C: South Road Tram Overpass
It sounds like AdMet are doing very well at managing the situation, with staff at stops and plenty of buses. It's very difficult and expensive to materialise that sort of manpower at such short notice. I also notice that the AdMet website has plenty of information, including Google Streetview images of the substitute stops.
Are trams back up and running yet?
Are trams back up and running yet?
-
- Legendary Member!
- Posts: 537
- Joined: Mon Oct 27, 2008 9:13 pm
Re: #U/C: South Road Tram Overpass
The track really is that uneven. Even the new track up at Belair wasn't this bad, someone really wasn't too careful with the ballast.danielphin wrote:Tell me about it, those tracks look really bad. Is it the perspective of the photo or what?
Maybe they could borrow the portable mini tamper up at Belair, it fits on the end of an excavator. Oh wait that won't work as they broke it the other day.
Welcome to Adelaide where everything is f***** broken
AdelaideNow: Now with 300% more Liberal Party hacks, at no extra cost.
- monotonehell
- VIP Member
- Posts: 5466
- Joined: Fri Feb 01, 2008 12:10 am
- Location: Adelaide, East End.
- Contact:
Re: #U/C: South Road Tram Overpass
Time to replace the Glenelg line with an OBahn then? Mmmm concrete.
(heheh turnabout is fair play Shuzy )
(heheh turnabout is fair play Shuzy )
Exit on the right in the direction of travel.
-
- High Rise Poster!
- Posts: 487
- Joined: Mon Oct 22, 2007 8:07 pm
Re: #U/C: South Road Tram Overpass
BillD wrote: View from Stop 7 toward South Rd - Is the worker thinking that a tamper would be useful ?
Epic track laying Fail?
- Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
- Contact:
Re: #U/C: South Road Tram Overpass
Nope, the replacement for the Mad Mouse.JamesXander wrote:Epic track laying Fail?BillD wrote: View from Stop 7 toward South Rd - Is the worker thinking that a tamper would be useful ?
Re: #U/C: South Road Tram Overpass
Work on the track continued through Monday with Thermit welding at the Stop 7 end of the works winding up at 4:30pm.
Flexity 107 rolled into stop 7 around 5pm and was negotiating the first left-hand curve when an alignment issue with the overhead/panto became evident. It moved back into the stop and the TA personnel eventually returned to the depot. Overhead staff went into action, tweaking the alignment at both ends of the diversion.
Flexity 107 finally left stop 7, 11:15pm, at sub-walking speed and successfuly went to South Tce before returning. Flexity 102 followed around half past midnight but hadn't returned when I left.
Here's a shot of '107 and its friends crossing South Rd for the first time on the new diversion. (No tripod, sorry for the blurry pic).
Flexity 107 rolled into stop 7 around 5pm and was negotiating the first left-hand curve when an alignment issue with the overhead/panto became evident. It moved back into the stop and the TA personnel eventually returned to the depot. Overhead staff went into action, tweaking the alignment at both ends of the diversion.
Flexity 107 finally left stop 7, 11:15pm, at sub-walking speed and successfuly went to South Tce before returning. Flexity 102 followed around half past midnight but hadn't returned when I left.
Here's a shot of '107 and its friends crossing South Rd for the first time on the new diversion. (No tripod, sorry for the blurry pic).
- danielphin
- Gold-Member ;)
- Posts: 55
- Joined: Fri May 16, 2008 11:51 pm
- Location: Perth
- Contact:
Re: #U/C: South Road Tram Overpass
The new guy covers the tram mess.
Hope you get home Brett [snark].
Last edited by danielphin on Tue Jul 07, 2009 5:03 pm, edited 1 time in total.
Re: #U/C: South Road Tram Overpass
Haha, yeah. Thanks for posting those.danielphin wrote:The new guy
And bah, this isn't a tram upgrade at all, it's a upgrade first and foremost for South Road!
-
- High Rise Poster!
- Posts: 225
- Joined: Sat Oct 15, 2005 1:12 pm
- Location: Adelaide, Australia
- Contact:
Re: #U/C: South Road Tram Overpass
Hahaha, yeah the way he was looking into the camera, i was waiting for him to cross his arms and say 'NO DEAL...'aussie2000 wrote:the young guy at the end = loser!
Re: #U/C: South Road Tram Overpass
Ha hah ahahahaha yeah i know that guy, i was friends with him in high school.
He would of just said that on purpose because he knows he will be on television (media loves controversy) and he has done that sort of thing before. He doesn't even use the tram, he owns a mini and lives in Norwood
He would of just said that on purpose because he knows he will be on television (media loves controversy) and he has done that sort of thing before. He doesn't even use the tram, he owns a mini and lives in Norwood