Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2206 Post by Briggzy_03 » Mon Dec 07, 2009 2:37 am

Thank you for the updates Bill. Much appreciated mate.

Waewick
Super Size Scraper Poster!
Posts: 3774
Joined: Tue Jun 10, 2008 1:39 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2207 Post by Waewick » Mon Dec 07, 2009 8:06 am

Well the trams aren't up and running today.

BillD
High Rise Poster!
Posts: 210
Joined: Thu Mar 22, 2007 9:57 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2208 Post by BillD » Mon Dec 07, 2009 8:25 am

Three of us were at stop 12 by 5am ready to ride the first tram but... no trams.
The latest estimate from an orange vest was for the test trams to be rolling between 10 & 12.
The overhead trucks were off the track at 5:40 and one of the guys said "we're done here".

Here's a shot of the crossover:
Image

muzzamo
Legendary Member!
Posts: 1029
Joined: Tue Aug 21, 2007 4:44 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2209 Post by muzzamo » Mon Dec 07, 2009 9:32 am

all of the tram stops in the city are still closed..

DM8
High Rise Poster!
Posts: 146
Joined: Mon Aug 04, 2008 10:21 am
Location: Melbourne (Adelaide expat)

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2210 Post by DM8 » Mon Dec 07, 2009 10:25 am

Glenelg tram line out of service
Article from: The Advertiser
December 07, 2009 09:15am

ADELAIDE'S trams will stay in their sheds today because work on the new Glenelg overpass has taken longer than expected.

A substitute bus service that ran over the weekend will continue today.

Regular services are expected to resume by tomorrow morning.

But commuters have been advised to contact Adelaide Metro infoline this afternoon to confirm that services will be available tomorrow.
"You pay for good roads, whether you have them or not! And it's not the wealth of a nation that builds the roads, but the roads that build the wealth of a nation." ...John F. Kennedy

Pat28
High Rise Poster!
Posts: 119
Joined: Fri May 23, 2008 4:42 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2211 Post by Pat28 » Mon Dec 07, 2009 11:50 am

From the AdMet site:
NO TRAM SERVICES MONDAY 7 DECEMBER
BUS SUBSTITUTES TO CONTINUE


Substitute bus services availableTRAM SUBSTITUTE BUS SERVICES AVAILABLE


Tram Substitute Bus Services
Tram substitute bus services are operating (Monday 7 December) as near as possible to the weekday tram timetable between Glenelg and the City every 15 minutes during the day.

Shuttles Terrace to Terrace
Tram substitute bus shuttle services also operate (Monday 7 December) between North and South Terrace every 6 minutes.


Work to transfer trams onto the new Glenelg Tram Overpass has taken longer than expected and as a result there will be NO tram services operating today, Monday 7 December.


Despite working around the clock across the weekend, project contractor McConnell Dowell has been unable to complete the package of works that included:

• relocation of trams from temporary to new track

• new electrical supply

• all associated power supply safety features and testing


Tram customers are advised substitute bus services that have run across the weekend will continue today to ensure customers can complete their regular journeys.

Advisory signs will be in place at all tram stops to guide customers to buses while TransAdelaide staff will be on hand at major tram stops to direct passengers.

Regular services will resume from first service Tuesday morning, December 8.

Traffic on South Road will NOT be affected by the delay.


The project team undertook an ambitious package of works over the weekend that included track work at South Terrace and upgrading of the overhead wires along the line.


Crews also spent the weekend upgrading all level crossing signals along the length of the Glenelg tram line.


With resources highly skilled and in limited supply, workplace agreements requiring scheduled breaks mean the delay has proven unavoidable.

Multiple, 24-hour work sites were chosen to prevent further closures of the line but cumulative delays have resulted in the need to run works into Monday.


Whilst every effort was made to complete the work in time for Monday’s timetabled services, safety must be the first priority with all works requiring thorough testing before services recommence.


The Department for Transport, Energy and Infrastructure apologises for the inconvenience and thanks tram customers for their patience while this important infrastructure project is completed.
Besser Verkehr in den Bergen

fabricator
Legendary Member!
Posts: 537
Joined: Mon Oct 27, 2008 9:13 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2212 Post by fabricator » Mon Dec 07, 2009 11:59 am

Pat28 wrote:From the AdMet site:
Despite working around the clock across the weekend, project contractor McConnell Dowell has been unable to complete the package of works that included:

• relocation of trams from temporary to new track
Pretty sure the trams stay in the depot, its only which track they move over which has changed.
Nice failure of english there AdMet :applause:
AdelaideNow: Now with 300% more Liberal Party hacks, at no extra cost.

User avatar
AG
VIP Member
VIP Member
Posts: 2093
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2213 Post by AG » Mon Dec 07, 2009 12:09 pm

Looks like the contractor was a bit too ambitious and tried to bite off more than they could chew with the weekend works for the second time. I find it astonishing that those who continue to post comments on AdelaideNow think that the Government is responsible for the missed deadline (I'd hate to break this to anyone who doesn't know this already, but the Government is only responsible for funding and overseeing the project, not building it).

User avatar
rhino
Super Size Scraper Poster!
Posts: 3090
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2214 Post by rhino » Mon Dec 07, 2009 12:42 pm

AG wrote: (I'd hate to break this to anyone who doesn't know this already, but the Government is only responsible for funding and overseeing the project, not building it).
Traditionally, the person least likely to understand this has been the leader of the opposition.
cheers,
Rhino

User avatar
AtD
VIP Member
VIP Member
Posts: 4581
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2215 Post by AtD » Mon Dec 07, 2009 1:53 pm

Am I correct in saying normally these sort of contracts include financial penalties on the builder if they fail to meet a contractual deadline?

I wonder if today's shenanigans cost them much.

Waewick
Super Size Scraper Poster!
Posts: 3774
Joined: Tue Jun 10, 2008 1:39 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2216 Post by Waewick » Mon Dec 07, 2009 4:49 pm

AG wrote:Looks like the contractor was a bit too ambitious and tried to bite off more than they could chew with the weekend works for the second time. I find it astonishing that those who continue to post comments on AdelaideNow think that the Government is responsible for the missed deadline (I'd hate to break this to anyone who doesn't know this already, but the Government is only responsible for funding and overseeing the project, not building it).
surely overseeing it involves it being supplied on time? It seems the Rann government can find excuses to avoid responsibility for everything.

Letting governments off for everything is how one way freeways get built :(

User avatar
AtD
VIP Member
VIP Member
Posts: 4581
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2217 Post by AtD » Mon Dec 07, 2009 5:41 pm

capitalist wrote:surely overseeing it involves it being supplied on time? It seems the Rann government can find excuses to avoid responsibility for everything.

Letting governments off for everything is how one way freeways get built :(
The ALP MPs aren't engineers!

Tonsley213
High Rise Poster!
Posts: 240
Joined: Thu Sep 24, 2009 5:13 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2218 Post by Tonsley213 » Mon Dec 07, 2009 6:14 pm

I was only talking to my pearents last night saying that it would be open way before anyone knew it woludn't. Welldone to me for predicting that.. :applause:

BillD
High Rise Poster!
Posts: 210
Joined: Thu Mar 22, 2007 9:57 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2219 Post by BillD » Mon Dec 07, 2009 6:51 pm

5:16pm 7th Dec 2009 - Flexity 107 is the first tram to use the new South Rd overpass (on the up track).

During the first trip over and back it was attended by a number of high-vis vests and was at sub-walking speed. The next couple were faster.

Flexity 103 followed at 6:01pm on the 'down'.

Image

Bill

BillD
High Rise Poster!
Posts: 210
Joined: Thu Mar 22, 2007 9:57 pm

Re: Glenelg Tram upgrade (#UC: South Rd Overpass)

#2220 Post by BillD » Mon Dec 07, 2009 7:14 pm

Here it is coming down the eastern ramp on the first test pass.

Well done everybody !