News & Discussion: Adelaide Metro Trains

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

Re: Electrification and Resleepering of TransAdelaide Networ

#1006 Post by mattblack » Tue May 11, 2010 9:40 am

Works have also started on the Noarlunga line extension. Goldsmith dr. has been diverted and excavation is taking place for what looks like an underpass for the rail line.

Alyx
High Rise Poster!
Posts: 270
Joined: Tue Aug 08, 2006 9:49 pm
Location: Adelaide

Re: Electrification and Resleepering of TransAdelaide Networ

#1007 Post by Alyx » Tue May 11, 2010 11:39 am

mattblack wrote:Works have also started on the Noarlunga line extension. Goldsmith dr. has been diverted and excavation is taking place for what looks like an underpass for the rail line.
There's also drainage works underway between Seaford Road and Lynton Terrace at Seaford.

Image
Image
DTEI wrote:Early works for the Seaford Rail Extension project will commence in late March 2010.

These works will involve the construction of a road bridge at Goldsmith Drive, Noarlunga Centre, and significant drainage upgrades south of Seaford Road. In addition to these items, service relocations and the establishment of site offices and compounds will be undertaken.

During the bridge works at Goldsmith Drive, traffic will be reduced to one lane in each direction on Goldsmith Drive 80 metres from west of the roundabout at Lovelock Drive/Burgess Drive. Speed restrictions of 25kph will also be in place throughout the works. Following the completion of these works, Goldsmith Drive will operate as a road bridge such that the rail line can be extended underneath.

As above, works will also be undertaken between Seaford Road and Griffiths Drive to install an underground stormwater drainage pipe to the east of the future rail line. This work will result in temporary diversions of the Coast to Vines Rail Trail between Seaford Road and Lynton Terrace for the duration of the works. Download the following flyer for further detail.

These works are expected to commence in late March 2010 are scheduled for completion in August 2010.

All works outlined above with generally be undertaken between the hours of 7am and 5pm Monday Friday and 7am 1pm Saturday.

Once these works are completed, site establishment for the major construction works on the extension is expected to occur in September 2010 with electric train services scheduled for operation in 2013, in line with the completion of electrification of the Noarlunga line.

RayRichards
High Rise Poster!
Posts: 107
Joined: Sun Jun 21, 2009 9:55 pm
Location: Glenelg South

Re: Electrification and Resleepering of TransAdelaide Networ

#1008 Post by RayRichards » Thu May 13, 2010 2:37 pm

I dont think we will have any problems with vandalism with the new Port Adelaide Railway station! Reminds me of "porridge", anyone hanging about that station will tend more to pace up and down the platforms, exercise on the benches and thinking about to scale the perimeter. Very clinical with no soul. Hope its only the first stage of a complete upgrade. I'm very fond of the Port, and these recent new developments have been a major drag. :roll:

The Mariner culture is being ripped away being replaced by a directionless (sic) yuppie mob who thinks this is the new Fremantle.

Ray.

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

Re: Electrification and Resleepering of TransAdelaide Networ

#1009 Post by jk1237 » Thu May 13, 2010 3:04 pm

I understand your point, but unfortunately the warfie culture died at the Port years and years ago. I prefer a yuppie culture than an abandoned ghost town

im gonna have to go down and have a look at thi station. Sounds hilarious

User avatar
jk1237
Donating Member
Donating Member
Posts: 1756
Joined: Wed Jan 17, 2007 11:22 pm
Location: Adelaide

Re: Electrification and Resleepering of TransAdelaide Networ

#1010 Post by jk1237 » Thu May 13, 2010 9:01 pm

I did have a look at the new Port station today. Its very very silver, and no one's gonna be climbing down over those fences in a hurry :lol:

Paris
Sen-Rookie-Sational
Posts: 3
Joined: Mon Apr 26, 2010 1:39 pm

Re: Electrification and Resleepering of TransAdelaide Networ

#1011 Post by Paris » Fri May 14, 2010 12:18 pm

Hey all,

A friend of mine uploaded this photo from his FB. This is what the Port Adelaide Station looks like...
Image

fabricator
Legendary Member!
Posts: 537
Joined: Mon Oct 27, 2008 9:13 pm

Re: Electrification and Resleepering of TransAdelaide Networ

#1012 Post by fabricator » Fri May 14, 2010 12:47 pm

Some decent pics of the station from someone who actually uses it :!:

http://southozrail.freeforums.org/post2974.html#p2974
AdelaideNow: Now with 300% more Liberal Party hacks, at no extra cost.


RayRichards
High Rise Poster!
Posts: 107
Joined: Sun Jun 21, 2009 9:55 pm
Location: Glenelg South

Re: Electrification and Resleepering of TransAdelaide Networ

#1014 Post by RayRichards » Fri May 14, 2010 8:50 pm

jk1237 wrote:I understand your point, but unfortunately the warfie culture died at the Port years and years ago. I prefer a yuppie culture than an abandoned ghost town
I know mate. But i'm very disappointed that the Port Adelaide Sailing Club and Searles Boatyard was forced to relocate. :evil:

I wonder what is the point calling that area Port Adelaide when there is no/little vessel movement?? Its not a Port now is it. To me, makes tourism to PORT Adelaide less viable.

*starts looking for stress ball*

Ray.

User avatar
SRW
Donating Member
Donating Member
Posts: 3650
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

Re: Electrification and Resleepering of TransAdelaide Networ

#1015 Post by SRW » Fri May 14, 2010 9:31 pm

It looks rather colourless, clinical and unfriendly, but it's clean, sheltered and secure -- which is a lot more than you can say about most other stations. I hope there's some sort of opportunity for community art (with a local primary school or something) or at least a few planters.
Keep Adelaide Weird

User avatar
Paulns
Donating Member
Donating Member
Posts: 470
Joined: Sun Sep 02, 2007 11:55 am

Re: Electrification and Resleepering of TransAdelaide Networ

#1016 Post by Paulns » Fri May 14, 2010 10:47 pm

SRW wrote:It looks rather colourless, clinical and unfriendly, but it's clean, sheltered and secure
I must admit I was expecting something that looked a lot better than corrigated iron sheets, but still it is better than before.. It looks very sterile.
"SA GOING ALL THE WAY".

crawf
Donating Member
Donating Member
Posts: 5527
Joined: Thu Feb 16, 2006 7:49 pm
Location: Adelaide

Re: Electrification and Resleepering of TransAdelaide Networ

#1017 Post by crawf » Fri May 14, 2010 11:30 pm

PORT Adelaide’s railway station will get a long-awaited $3 million dollar makeover, starting in November.

The upgrade of the run-down 150-year-old station will include new shelters, improved lighting, fencing and CCTV security monitoring.

The works were part of $20 million project to repair the Commercial Rd rail bridge and was the first step in the electrification of the Outer Harbor line, Port Adelaide MP Kevin Foley said.

Other improvements would occur at the station later in the electrification process, he said.

“When the line is electrified another $9 million will be spent on further improving the amenity of the station, including lowering the platform,” he said.
http://portside-messenger.whereilive.co ... 3m-revamp/

User avatar
Norman
Donating Member
Donating Member
Posts: 6488
Joined: Sun Mar 25, 2007 1:06 pm

Re: Electrification and Resleepering of TransAdelaide Networ

#1018 Post by Norman » Sat May 15, 2010 8:05 pm

ELECTRIFICATION CHARGES AHEAD
Another major milestone has been reached in the State Government’s multi billon dollar investment in public transport with short listed consortia asked to submit their proposals to electrify Adelaide’s 100-kilometre passenger rail network.

Transport Minister, Patrick Conlon said successful companies were now being invited to tender for the electrification major works package - following a call for Expressions of Interest in November 2009 that generated considerable interest nationally.

“This is the important next stage of the $2.6 billion, decade-long rail revitalisation program and we hope to start design work later this year,” he said.

“We can then start major site works commencing next year and electrified train services will operate on the Adelaide to Seaford and Adelaide to Gawler lines in 2013.

“The $400 million electrification of the Adelaide rail network will provide a platform for more modern and efficient train services for commuters while reducing noise and local air pollution.

“The program will also create around 2000 jobs for South Australians.”

“The scale of these works is unprecedented in metropolitan Adelaide - we’re rolling this out along a network for over 100km of track across the metropolitan area from Gawler in the north, to Seaford down south and all the way to Outer Harbor.”

The major works package is the largest in the electrification project, covering installation of masts and overhead wires required to power the system, along with railway signalling and communications.

This is the first of two significant tenders for the project; the second is for the construction of a number of substations to power the electrified network and will be called in coming months.

In May last year, the Federal Government announced $291 million funding to extend the Noarlunga line to Seaford and $293.5 million to accelerate the modernisation of the Gawler line as part of its Nation Building Program.

This is in addition to the State Government’s $2 billion, decade-long investment in public transport that will transform Adelaide’s network into a vibrant, state-of-the-art system.

Upgrade works on the Gawler line as a pre-cursor to electrification begin on June 6, with major construction works on the Seaford extension commencing later this year.
Source: http://www.premier.sa.gov.au/images/sto ... cation.pdf

User avatar
Xaragmata
Super Size Scraper Poster!
Posts: 1613
Joined: Thu Jul 19, 2007 2:08 pm
Location: Adelaide / West
Contact:

Re: Electrification and Resleepering of TransAdelaide Networ

#1019 Post by Xaragmata » Sun May 16, 2010 3:06 am

Some more Port station pics - lighting, cameras, landscaping still not complete:

Image


Image


Image


Image


http://xaragmata.thebbs.org/album/railw ... index.html

DM8
High Rise Poster!
Posts: 146
Joined: Mon Aug 04, 2008 10:21 am
Location: Melbourne (Adelaide expat)

Re: Electrification and Resleepering of TransAdelaide Networ

#1020 Post by DM8 » Sun May 16, 2010 1:08 pm

Wow, bit of a contrast there. The station itself looks like something from a high security prison, and below looks like something from Chinatown.
"You pay for good roads, whether you have them or not! And it's not the wealth of a nation that builds the roads, but the roads that build the wealth of a nation." ...John F. Kennedy

Post Reply

Who is online

Users browsing this forum: No registered users and 6 guests