Crane Counter: CBD 9 | Metro 6 | Total 15

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
User avatar
metro
Legendary Member!
Posts: 970
Joined: Mon Sep 21, 2009 10:11 pm
Location: Sydney

Re: Official CBD Crane Counter Thread - 2

#526 Post by metro » Tue Dec 14, 2010 6:14 pm

There should be at least 8-10 for the new RAH like the Fiona Stanley Hospital and the GCUH

maybe we get 14-24 in the city over the next few years. what is the record for construction cranes in the CBD?

:cheers:

User avatar
Isiskii
High Rise Poster!
Posts: 173
Joined: Fri Jul 16, 2010 3:29 pm

Re: Official CBD Crane Counter Thread - 2 erected - 4 bases

#527 Post by Isiskii » Tue Dec 14, 2010 6:53 pm

I think the record was actually 8-10 during the construction boom of the 1980's. Pretty pitiful considering the amount of activity that has been occurring in other cities of late.

User avatar
skyliner
Super Size Scraper Poster!
Posts: 2359
Joined: Tue Oct 24, 2006 9:16 pm
Location: fassifern (near Brisbane)

Re: Official CBD Crane Counter Thread - 2

#528 Post by skyliner » Thu Dec 16, 2010 11:56 am

I think we briefly reached 9 last year while the hold up was occurring with one of the bldgs on Gouger St.

ADELAIDE - TOWARDS A GREATER CITY SKYLINE
Jack.

Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Official Crane Counter Thread -

#529 Post by Ben » Sun Dec 19, 2010 9:56 am

First CC8 crane up with second to follow in a few weeks as well as Globe and Uno soon. 2011 looking like a good year.
Location........................................Levels............Crane

Completed 2011



Under Construction

City Central 8................................................21.....................................1
102 Waymouth St ..........................................16
Globe Apartments..........................................15
Yorke Campus (Police Headquarters).................10.......................................1
Medical Reasearch Institute - North terrace........6
Union Hall.....................................................6
Women's and Children's Hospital Children's...........6 (3 existing + 3 new)...........1


TOTAL CBD CRANES:........................................3


March 2011

Rundle Plaza Arcade....................................21


April 2011
115 King William St ......................................25
The Precinct (Loft)......................................7


April 2011

66 Currie Street ........................................22
154 Angas Street ........................................9


Approved/Proposed Upcoming

20 -22 Currie Street (ONH)............................31
51 Pirie Street (PRO)....................................22
64-68 Hindley St..........................................22
58-76 Franklin Street ..................................19
The Precinct Tower 2 .................................18
The Precinct Tower 3 .................................18
The Precinct Tower 4 .................................18
The Precinct Tower 5 .................................18
42 - 56 Franklin St.......................................17
58-76 Franklin Street ................................16
176-186 Morphett Street .............................16
399 King William Street (PRO)...........................15
Aurora Building West..................................15
71 - 83 Franklin St......................................13
74 Light Square.........................................13
377 - 379 King William St (PRO).....................13
12-14 Rowlands Place ...................................13
302-306 Waymouth St PRO)............................12
22 - 25 Market Street (PRO)...........................12
Azucar Apartments......................................12
10 Andrew St.............................................11
34-48 Wright Street (PRO)..............................10
102-120 Wakefield Street (Office).....................10
58-76 Franklin Street ...................................10
Yorke Campus Buliding 3.............................10
Yorke Campus Buliding 2.............................10
Liverpool St (City West apartments).................9
Freedom Apartments T1...............................10
111-115 South Terrace .................................9
Freedom Apartments T2...............................8
Freedom Apartments T3...............................8
Imagine 88 - O'Connell St...............................6


Completed 2008

Spark Hindley Street..................................15
Lot 8 Coglin St...........................................13
SA Water..................................................11
Tivoli.......................................................10
IPAD..........................................................9
Thompson Playford Gouger St........................8
The Precinct (Gallery).................................7


Completed 2009

Conservatory on Hindmarsh.........................18
The Precinct Tower 1 (Altitude)....................18
20 Hindmarsh Square (Apartment).................15
Aurora Building East ...................................14
Wave KW Street.........................................12
Edge KW Street..........................................11
374 - 400 King William St ..............................11
Adelaide Uni Engeneering Building..................8


Completed 2010

140 North Terrace ....................................20/18
20 Hindmarsh Square (Hotel)........................16
235 - 237 Pirie St (Freedom Apartments)........8
Ifould st Apartments...................................8


User avatar
Pikey
VIP Member
VIP Member
Posts: 2492
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

Re: Official CBD Crane Counter Thread - 3

#530 Post by Pikey » Mon Dec 20, 2010 10:40 am

Still only two. The boom installation on CC8 was cancelled due to the high winds yesterday.
Walking on over....

| Sensational-Adelaide.com Moderator |

Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Official CBD Crane Counter Thread - 3

#531 Post by Ben » Mon Dec 20, 2010 10:44 am

Pikey wrote:Still only two. The boom installation on CC8 was cancelled due to the high winds yesterday.
So should we change it to 2.5?

Will
VIP Member
VIP Member
Posts: 5864
Joined: Fri Sep 16, 2005 6:48 pm
Location: Adelaide

Re: Official CBD Crane Counter Thread - 2.5

#532 Post by Will » Mon Dec 20, 2010 11:50 am

How about 2.8, to take into account the 3 crane bases? :mrgreen:

User avatar
AG
VIP Member
VIP Member
Posts: 2099
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

Re: Official CBD Crane Counter Thread - 2.5

#533 Post by AG » Tue Dec 21, 2010 10:30 am

Someone mentioned the new Gold Coast Hospital project? This one is of a similar scale to the planned new RAH (slightly taller and slightly bigger project), and this one required 9 cranes:

Image

ghs
Super Size Scraper Poster!
Posts: 1725
Joined: Thu Sep 18, 2008 8:09 am
Location: Brighton

Re: Official CBD Crane Counter Thread - 2.5

#534 Post by ghs » Thu Dec 23, 2010 11:34 pm

With HRMI going ahead as well we could easily see 10 cranes in the area, that as long as the 2
developments are built concurrentlly.

Walkinshaw
Sen-Rookie-Sational
Posts: 33
Joined: Thu Aug 25, 2005 7:25 pm
Location: Adelaide

Re: Official CBD Crane Counter Thread - 2.5

#535 Post by Walkinshaw » Wed Dec 29, 2010 6:13 pm

plus the new convention center. Could be 4-5 cranes up at the same time along the Torrens

Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Official CBD Crane Counter Thread - 2.5

#536 Post by Ben » Sat Jan 08, 2011 5:03 pm

CCT8 up fully today.

User avatar
Pikey
VIP Member
VIP Member
Posts: 2492
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

Re: Official CBD Crane Counter Thread - 3

#537 Post by Pikey » Fri Jan 14, 2011 9:27 am

The Globe Crane is on it's way up now. I can see it from my office window.
Walking on over....

| Sensational-Adelaide.com Moderator |

Ben
VIP Member
VIP Member
Posts: 7574
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Official Crane Counter Thread -

#538 Post by Ben » Thu Jan 27, 2011 3:14 pm

Thanks to professor for the HRMC update. Crane tally up to 5 now.
Location........................................Levels............Crane

Completed 2011



Under Construction

City Central 8................................................21.....................................1
102 Waymouth St ..........................................16.....................................1
Globe Apartments..........................................15.....................................1
Yorke Campus (Police Headquarters).................10.......................................1
Medical Reasearch Institute - North terrace........6.....................................1
Union Hall.....................................................6
Women's and Children's Hospital Children's...........6 (3 existing + 3 new)...........1


TOTAL CBD CRANES:........................................6


March 2011


April 2011
115 King William St ......................................25
Rundle Plaza Arcade....................................21
The Precinct (Loft)......................................7


May 2011

66 Currie Street ........................................22
154 Angas Street ........................................9


Approved/Proposed Upcoming

20 -22 Currie Street (ONH)............................31
51 Pirie Street ..........................................22
64-68 Hindley St..........................................22
58-76 Franklin Street ..................................19
The Precinct Tower 2 .................................18
The Precinct Tower 3 .................................18
The Precinct Tower 4 .................................18
The Precinct Tower 5 .................................18
42 - 56 Franklin St.......................................17
58-76 Franklin Street ................................16
176-186 Morphett Street .............................16
399 King William Street (PRO)...........................15
Aurora Building West..................................15
160 Pulteney Street (PRO)..............................15
71 - 83 Franklin St......................................13
74 Light Square.........................................13
377 - 379 King William St (PRO).....................13
12-14 Rowlands Place ...................................13
302-306 Waymouth St PRO)............................12
22 - 25 Market Street (PRO)...........................12
Azucar Apartments......................................12
10 Andrew St.............................................11
34-48 Wright Street (PRO)..............................10
102-120 Wakefield Street (Office).....................10
58-76 Franklin Street ...................................10
Yorke Campus Buliding 3.............................10
Yorke Campus Buliding 2.............................10
Liverpool St (City West apartments).................9
Freedom Apartments T1...............................10
111-115 South Terrace .................................9
Freedom Apartments T2...............................8
Freedom Apartments T3...............................8
Imagine 88 - O'Connell St...............................6


Completed 2008

Spark Hindley Street..................................15
Lot 8 Coglin St...........................................13
SA Water..................................................11
Tivoli.......................................................10
IPAD..........................................................9
Thompson Playford Gouger St........................8
The Precinct (Gallery).................................7


Completed 2009

Conservatory on Hindmarsh.........................18
The Precinct Tower 1 (Altitude)....................18
20 Hindmarsh Square (Apartment).................15
Aurora Building East ...................................14
Wave KW Street.........................................12
Edge KW Street..........................................11
374 - 400 King William St ..............................11
Adelaide Uni Engeneering Building..................8


Completed 2010

140 North Terrace ....................................20/18
20 Hindmarsh Square (Hotel)........................16
235 - 237 Pirie St (Freedom Apartments)........8
Ifould st Apartments...................................8


BillD
High Rise Poster!
Posts: 210
Joined: Thu Mar 22, 2007 9:57 pm

Re: Official CBD Crane Counter Thread - 5

#539 Post by BillD » Sat Jan 29, 2011 5:39 pm

Here you go crane counters.

North Tce 29th Jan 2011. An almost brand-new 350 tonne Samaras superlift crane assembles a site crane on North Tce.

Bill.

In the first shot the Samaras crane is aout to lift the engine/winching equipment up to the site crane.
You can see the workers waiting in the the 38 degree heat:
Image


In the second shot the workers have pinned the new section in place and the Samaras crane is gently lowering the unit until its stays take the load:
Image

Will
VIP Member
VIP Member
Posts: 5864
Joined: Fri Sep 16, 2005 6:48 pm
Location: Adelaide

Re: Official CBD Crane Counter Thread - 5

#540 Post by Will » Sun Jan 30, 2011 11:48 am

I only caught a brief glimpse last night, but I think the crane for Uno apartments is going up too. If anyone is in the city today, could you please clarify.

Post Reply

Who is online

Users browsing this forum: Ahrefs [Bot] and 8 guests