Ad blocker detected: Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker on our website.
All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
-
Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
-
Contact:
#226
Post
by Xaragmata » Thu Mar 03, 2011 9:12 am
Progress report from February - a second crane will be erected...
http://www.sahmri.com/news/progress-con ... ahmri-site
The 25,000 square metre building will house the headquarters for the world class health and medical research centre and will be operational from mid-2013.
On Wednesday, 2 February SAHMRI Chairman Mr Raymond Spencer joined the Hon John Hill MP, Minister for Health, and members of the media to highlight the progress being made on the site.
During the weekend of 29 January, a 73 metre Jaso crane was erected on the site's southern end, the first of two that will be used in the construction of the Institute. The crane is the largest of its kind currently operating in Australia.
Since site works began in February 2010, over 66,000 tonnes of soil have been removed and 330 in-ground columns have been completed to support the facility. Headway has also been made on the new eastern access road, which will allow vehicles to enter from North Terrace to the rear of the new Royal Adelaide Hospital and SAHMRI site.
Construction of the three lower levels of SAHMRI is expected to be completed by the middle of 2011, bringing the building up to street level. Work will then start on the upper six floors of the building, including the new plaza.
The on-site workforce will be at its highest in 2012, with around 300 people working on the SAHMRI site. Overall, it's expected that up to 1400 direct jobs will have been created from the project.
March 2011 Newsletter is available, with construction & architectural news & internal render:
http://www.sahmrinews.com/
-
Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
-
Contact:
#227
Post
by Xaragmata » Sat Mar 05, 2011 5:14 pm
-
Mants
- Legendary Member!
- Posts: 990
- Joined: Sun Nov 06, 2005 12:40 am
- Location: City of Burnside
#228
Post
by Mants » Sun Mar 06, 2011 6:45 pm
i spy a crane base
-
Wayno
- VIP Member
- Posts: 5138
- Joined: Mon Dec 17, 2007 2:18 pm
- Location: Torrens Park
#229
Post
by Wayno » Sun Mar 06, 2011 7:57 pm
Remember this (July 2010)
Kaurna stoush over railyards
WORK has come to a halt at the SA Health and Medical Research Institute as Aboriginal groups enter into a stoush with the State Government.
Well here's what happened (from ABC Online - Mar 4th)
Court dismisses challenge to North Tce work
A court has dismissed a challenge from a member of an Aboriginal community against construction work on a North Terrace building site in Adelaide.
Kaurna elder Jeffrey Newchurch argued traditional owners were not properly consulted before the South Australian Government approved construction of a medical research institute, which will be next to Adelaide's new hospital.
The Supreme Court heard the Kaurna people believed there were Aboriginal remains at the site which should not be disturbed.
The court heard parties had failed to reach agreement about having Aboriginal monitors on the site during excavation work and Aboriginal Affairs Minister Grace Portolesi authorised the works without them.
Chief Justice John Doyle dismissed Mr Newchurch's challenge, finding the Minister took all reasonable steps to consult stakeholders.
Opportunity is missed by most people because it is dressed in overalls and looks like work.
-
skyliner
- Super Size Scraper Poster!
- Posts: 2359
- Joined: Tue Oct 24, 2006 9:16 pm
- Location: fassifern (near Brisbane)
#231
Post
by skyliner » Wed Mar 09, 2011 5:02 pm
As I remember all the noise happened after the bldg had started - plenty of chances to address this earlier. Good outcome.
ADELAIDE - TOWARDS A GREATER CITY SKYLINE
Jack.
-
Pikey
- VIP Member
- Posts: 2481
- Joined: Wed Jul 13, 2005 7:41 am
- Location: Sitting Down
#232
Post
by Pikey » Wed Mar 09, 2011 8:15 pm
In an odd move, the second crane base has been removed. It's now sitting up near North terrace near the temporary on site offices.
Not sure what's going on?
-
Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
-
Contact:
#233
Post
by Xaragmata » Thu Mar 10, 2011 7:51 pm
Pikey wrote:In an odd move, the second crane base has been removed. It's now sitting up near North terrace near the temporary on site offices.
Not sure what's going on?
I had a look today - they may have moved it temporarily to erect formwork & pour concrete next to the concrete base. It would have been a tight squeeze.
-
Xaragmata
- Super Size Scraper Poster!
- Posts: 1613
- Joined: Thu Jul 19, 2007 2:08 pm
- Location: Adelaide / West
-
Contact:
#234
Post
by Xaragmata » Sun Mar 13, 2011 1:59 pm
-
Pikey
- VIP Member
- Posts: 2481
- Joined: Wed Jul 13, 2005 7:41 am
- Location: Sitting Down
#235
Post
by Pikey » Thu Mar 31, 2011 9:11 am
A permanent, Putzmeister concrete pump has now been installed (identical to the pup at the CC8 site) and some more crane pieces have been delivered to the site.
-
Pikey
- VIP Member
- Posts: 2481
- Joined: Wed Jul 13, 2005 7:41 am
- Location: Sitting Down
#236
Post
by Pikey » Tue Apr 05, 2011 8:00 pm
The second crane will be going up any day now. The perimeter walling has been completed (which was why the base was moved) and several (eight I believe) tower sections are on site, along with a mobile crane on the former rail yard site. The main tower crane was unloading crane parts tonight from several trucks lined up.
Will be very interesting to see how the two cranes will operate in unison.
-
Professor
- High Rise Poster!
- Posts: 469
- Joined: Fri Jul 13, 2007 2:12 pm
- Location: Solomon Islands
#237
Post
by Professor » Wed Apr 06, 2011 12:42 pm
From today with some of the second crane pieces in the foreground. Lots of activity.
-
Attachments
-
- IMG_1783.jpg (270.13 KiB) Viewed 2233 times
-
Professor
- High Rise Poster!
- Posts: 469
- Joined: Fri Jul 13, 2007 2:12 pm
- Location: Solomon Islands
#238
Post
by Professor » Wed Apr 06, 2011 12:43 pm
More pieces of the new crane seeking shade under the gum trees.
-
Attachments
-
- IMG_1784.jpg (341.89 KiB) Viewed 2233 times
-
Pikey
- VIP Member
- Posts: 2481
- Joined: Wed Jul 13, 2005 7:41 am
- Location: Sitting Down
#239
Post
by Pikey » Wed Apr 06, 2011 6:11 pm
The second crane base is now reinstalled, and I would suggest the tower section will be up tomorrow if not Friday. Also the mounting collar is now on site (rotational section).
-
Professor
- High Rise Poster!
- Posts: 469
- Joined: Fri Jul 13, 2007 2:12 pm
- Location: Solomon Islands
#240
Post
by Professor » Thu Apr 07, 2011 12:25 pm
Spot on Pikey. From a few minutes ago.
We are in danger of looking like a prosperous, growing city...
-
Attachments
-
- IMG_1789.jpg (216.43 KiB) Viewed 2125 times
Who is online
Users browsing this forum: Ahrefs [Bot], Bing [Bot] and 3 guests