News & Developments: Bowden TOD

All high-rise, low-rise and street developments in areas other than the CBD and North Adelaide. Includes Port Adelaide and Glenelg.
Message
Author
marquisite
Sen-Rookie-Sational
Posts: 17
Joined: Wed Nov 05, 2008 5:24 pm

Re: Bowden Village TOD (Clipsal site)

#121 Post by marquisite » Sat Apr 23, 2011 7:55 pm

The train pictured is from Perth.

Image
(from watoday.com.au)

User avatar
AG
VIP Member
VIP Member
Posts: 2099
Joined: Thu Jul 21, 2005 9:44 am
Location: Adelaide SA

Re: Bowden Village TOD (Clipsal site)

#122 Post by AG » Sat Apr 23, 2011 7:56 pm

The Scooter Guy wrote:Looks like to me the train is from either Victoria or NSW?
That image is of a TOD in Perth, and so is the train.

UrbanSG
VIP Member
VIP Member
Posts: 1848
Joined: Fri Aug 19, 2005 8:55 am

Re: Bowden Village TOD (Clipsal site)

#123 Post by UrbanSG » Fri Apr 29, 2011 12:01 pm

The announcement by the government over the weekend was completely overshadowed by the Minister scandal. Wouldn't expect any less of the media! A video is up on the LMC site showing the planned stages:

http://www.lmc.sa.gov.au/bowdenvillage/home/default.asp

User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

Re: Bowden Village TOD (Clipsal site)

#124 Post by Wayno » Fri Apr 29, 2011 2:42 pm

here's a couple of pics extracted from the LMC video.
bowden2.jpg
bowden2.jpg (105.26 KiB) Viewed 4782 times
bowden1.jpg
bowden1.jpg (125.97 KiB) Viewed 4782 times
Opportunity is missed by most people because it is dressed in overalls and looks like work.

User avatar
[Shuz]
Super Size Scraper Poster!
Posts: 3301
Joined: Sun Apr 10, 2011 5:26 pm

Re: Bowden Village TOD (Clipsal site)

#125 Post by [Shuz] » Fri Apr 29, 2011 3:40 pm

Those screen shots tell us two things, concerning transport; that it appears like they plan to extend the tramline down East Street, and the rail corridor appears like it will be converted into a "green nature strip" between Park Terrace and East Street, which would indicate plans to go ahead with an early proposal to submerge the rail line underground, eliminating the Park Terrace level crossing, making the Bowden Station underground and resurface some point later down the track.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3826
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

Re: Bowden Village TOD (Clipsal site)

#126 Post by Nathan » Fri Apr 29, 2011 4:33 pm

[Shuz] wrote:Those screen shots tell us two things, concerning transport; that it appears like they plan to extend the tramline down East Street, and the rail corridor appears like it will be converted into a "green nature strip" between Park Terrace and East Street, which would indicate plans to go ahead with an early proposal to submerge the rail line underground, eliminating the Park Terrace level crossing, making the Bowden Station underground and resurface some point later down the track.
I thought that too, but there's no mention of undergrounding the rail line in the video (it does mention the tram line though). I dare say it's just a case of something not lining up right in the render (and a bad use of Photoshop's healing brush causing the line to look like it's heading underground before it leaves the parklands)

User avatar
fishinajar
High Rise Poster!
Posts: 276
Joined: Mon May 12, 2008 12:23 pm
Location: Adelaide

Re: Bowden Village TOD (Clipsal site)

#127 Post by fishinajar » Sun May 01, 2011 8:04 am

Massively exciting. Absolutely love the reuse of existing buildings for the market etc, great to see from an historical as well as environmental perspective. If done well should look great also.

The train will be there guys, it's just not shown in the render... accidentally? Maybe, probably not though, not everyone enjoys the look and feel of a nice quiet electric train line.

Burying the line would cost way to much money, though would be awesome. No poli or planner in their right mind would eliminate it and rely solely on a hybrid tram/train only model of servicing the line into the future.

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6423
Joined: Sat Nov 11, 2006 12:14 pm

Re: Bowden Village TOD (Clipsal site)

#128 Post by rev » Mon May 02, 2011 8:26 am

To me it actually looks like the train line has been ripped up, and is being replaced by the tram line.
You can see in the renders it turns into the TOD and continues along the path of train line.

User avatar
AtD
VIP Member
VIP Member
Posts: 4579
Joined: Wed Jul 20, 2005 7:00 pm
Location: Sydney

Bowden Village TOD (Clipsal site)

#129 Post by AtD » Mon May 02, 2011 10:54 am

To me it looks like a conceptual work for marketing, not designed to be taken too seriously.

Will
VIP Member
VIP Member
Posts: 5864
Joined: Fri Sep 16, 2005 6:48 pm
Location: Adelaide

Re: Bowden Village TOD (Clipsal site)

#130 Post by Will » Wed May 04, 2011 5:15 pm

From the Messenger:
Start of Bowden Village

Local News4 May 11 @ 12:58pm by Michelle Etheridge

Image

ON SITE: Wayne Gibbings from the Land Managementjl Corporation at the development.


REMEDIATION works for the first stage of the Bowden Urban Village are expected to be complete by July.

Land Management Corporation (LMC) chief executive Wayne Gibbings said a 25sq m petrol tank had been uncovered at the former Clipsal site at the northwestern corner of the development, which faces Park Tce.

Mr Gibbings said contractors would remove contaminated soil and replace it with clean fill before construction started on the first homes, between Fifth and Seventh streets.

The 16 ha development will incorporate the former Clipsal and Origin energy land, on Park Tce and Chief St.

The State Government will develop the site over the next 10-12 years, to create the state’s first transit oriented development (TOD), with shops, offices and 2200 homes.

Mr Gibbings said at least two “saw-tooth” industrial buildings would be retained, to be used for a market and artists’ studio.

“Gibson St will have a main street feel, if you think Norwood Parade or Jetty Rd, Glenelg” he said.

Mr Gibbings said many of the streets would feature tree-lined median strips and reedbeds, and the whole precinct would have a maximum speed limit of 25km/h, to “create a shared space for pedestrians, cyclists and cars”.

The first stage will include 211 homes, in three-storey terraces and 4-5 storey apartment buildings.

Residents are expected to begin moving in late in 2012 or early in 2013

kenget
Gold-Member ;)
Posts: 88
Joined: Wed Dec 19, 2007 4:33 pm

Re: Bowden Village TOD (Clipsal site)

#131 Post by kenget » Wed May 04, 2011 10:51 pm

Will wrote:From the Messenger:
Land Management Corporation (LMC) chief executive Wayne Gibbings said a 25sq m petrol tank had been uncovered at the former Clipsal site at the northwestern corner of the development, which faces Park Tce.
I am guessing this tank was located somewhere near the petrol bowser that was used to supply the company vehicles with fuel :shock: :hilarious:

User avatar
rhino
Super Size Scraper Poster!
Posts: 3093
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

Re: Bowden Village TOD (Clipsal site)

#132 Post by rhino » Fri May 06, 2011 8:36 am

Local News4 May 11 @ 12:58pm by Michelle Etheridge wrote:
the whole precinct would have a maximum speed limit of 25km/h
This is too slow, for a whole suburb, IMO. I think 40km/h works quite well in the back streets of Unley, I find it hard to justify a 25km/h limit.

Kudos for the rest of it, though.

My :2cents:
cheers,
Rhino

User avatar
bm7500
Donating Member
Donating Member
Posts: 901
Joined: Fri Jan 12, 2007 7:04 pm
Location: Adelaide

Re: Bowden Village TOD (Clipsal site)

#133 Post by bm7500 » Fri May 06, 2011 9:12 am

rhino wrote:
Local News4 May 11 @ 12:58pm by Michelle Etheridge wrote:
the whole precinct would have a maximum speed limit of 25km/h
This is too slow, for a whole suburb, IMO. I think 40km/h works quite well in the back streets of Unley, I find it hard to justify a 25km/h limit.

Kudos for the rest of it, though.

My :2cents:
I agree, 40km/h is much more suitable. Leave 25km/h for school zones and road works.
ADELAIDE SINGAPORE LONDON BERLIN AMSTERDAM PARIS TOKYO AUCKLAND DOHA DUBLIN HONG KONG BANGKOK REYKJAVIK ROME MADRID BUDAPEST COPENHAGEN ZURICH BRUSSELS VIENNA PRAGUE STOCKHOLM LUXEMBOURG BRATISLAVA NASSAU DUBAI BAHRAIN KUALA LUMPUR HELSINKI GENEVA

User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

Re: Bowden Village TOD (Clipsal site)

#134 Post by Wayno » Fri May 06, 2011 9:16 am

i believe 25kph is suitable for the shared spaces between buildings (notice how i did not say roads). Neither cars nor pedestrians nor cyclists have preferential right of way.

To me, 40kph indicates cars have right of way.
Opportunity is missed by most people because it is dressed in overalls and looks like work.

Nort
Super Size Scraper Poster!
Posts: 2296
Joined: Tue Feb 09, 2010 2:08 pm

Re: Bowden Village TOD (Clipsal site)

#135 Post by Nort » Sat May 07, 2011 4:39 pm

It depends how many access roads there are into Bowden Village. If there are just going to be one or two roads in then 25kph is too slow, however if there is lots of access from the neighboring major roads a low speed limit will do a good job of discouraging people driving through the shared areas wherever possible.

Post Reply

Who is online

Users browsing this forum: No registered users and 0 guests