Crane Counter: CBD 9 | Metro 6 | Total 15
Re: Official CBD Crane Counter Thread - 7
Last edited by [Shuz] on Wed May 18, 2011 11:08 am, edited 1 time in total.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
Re: Official CBD Crane Counter Thread - 7
Nice graph shuz it helps set things into perspective a lot.
However, according to this, http://www.knightfrank.com.au/content/u ... sdev10.pdf
City Central Tower 4 is 30,000sqm not 12,000sqm
However, according to this, http://www.knightfrank.com.au/content/u ... sdev10.pdf
City Central Tower 4 is 30,000sqm not 12,000sqm
Don't burn the Adelaide Parkland (preservation society)
Re: Official CBD Crane Counter Thread - 7
Yeah, I've noticed a couple of errors here and there. I'll fix them up soon.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
Re: Official CBD Crane Counter Thread - 7
Good job though your mother would be proud.[Shuz] wrote:Yeah, I've noticed a couple of errors here and there. I'll fix them up soon.
Don't burn the Adelaide Parkland (preservation society)
Re: Official CBD Crane Counter Thread - 7
Updated with further edits.
Before you interject, just on a technicality, both the Spire Living and Currie Street developments are actually both on hold, not cancelled. There is still some slim hope for both projects as the developers have simply only put the sites & approved DA's up for sale.,
What this means that a new developer could come along and purchase the proposal off the previous developer and go straight to construction, as the DA in question is still technically approved by the ACC/DAC. It saves both time and money than to avoid going through the tedious process of bureaucratic red tape with a new proposal.
It almost never happens, though.
Before you interject, just on a technicality, both the Spire Living and Currie Street developments are actually both on hold, not cancelled. There is still some slim hope for both projects as the developers have simply only put the sites & approved DA's up for sale.,
What this means that a new developer could come along and purchase the proposal off the previous developer and go straight to construction, as the DA in question is still technically approved by the ACC/DAC. It saves both time and money than to avoid going through the tedious process of bureaucratic red tape with a new proposal.
It almost never happens, though.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
Re: Official Crane Counter Thread -
Latest update
Location........................................Levels............Crane
Completed 2011
Yorke Campus (Police Headquarters).................10
Under Construction
City Central 8................................................21.....................................2
Rundle Plaza Arcade....................................19
102 Waymouth St ..........................................16.....................................1
Globe Apartments..........................................15.....................................1
42 - 56 Franklin St (Carpark)............................8
Medical Reasearch Institute - North terrace........6.....................................2
Illumin8.....................................................6
Women's and Children's Hospital Children's...........6 (3 existing + 3 new)...........1
TOTAL CBD CRANES:........................................7
July 2011
12-14 Rowlands Place......................................15
74 Light Square.........................................8
August 2011
115 King William St ......................................25
154 Angas Street ........................................9
111-115 South Terrace .................................9
September 2011
66 Currie Street ........................................22
102-120 Wakefield Street (Office).....................12
UNI SA Hindley Street...................................8
The Precinct (Loft)......................................7
Approved/Proposed Upcoming
20 -22 Currie Street (ONH)............................31 (124m)
2-20 Flinders Street.....................................27 (100m)
51 Pirie Street ..........................................22 (98m)
64-68 Hindley St..........................................22
58-76 Franklin Street ..................................19
The Precinct Tower 2 .................................18
The Precinct Tower 3 .................................18
The Precinct Tower 4 .................................18
The Precinct Tower 5 .................................18
42 - 56 Franklin St (Office)............................17
58-76 Franklin Street ................................16
176-186 Morphett Street .............................16
399 King William Street (PRO)...........................15
Aurora Building West..................................15
160 Pulteney Street (PRO)..............................15
71 - 83 Franklin St......................................13
377 - 379 King William St (PRO).....................13
302-306 Waymouth St (PRO)............................12
10 Andrew St.............................................11
58-76 Franklin Street ...................................10
Yorke Campus Buliding 3.............................10
Yorke Campus Buliding 2.............................10
Liverpool St (City West apartments).................9
Freedom Apartments T1...............................10
Freedom Apartments T2...............................8
Freedom Apartments T3...............................8
Imagine 88 - O'Connell St...............................6
Completed 2008
Spark Hindley Street..................................15
Lot 8 Coglin St...........................................13
SA Water..................................................11
Tivoli.......................................................10
IPAD..........................................................9
Thompson Playford Gouger St........................8
The Precinct (Gallery).................................7
Completed 2009
Conservatory on Hindmarsh.........................18
The Precinct Tower 1 (Altitude)....................18
20 Hindmarsh Square (Apartment).................15
Aurora Building East ...................................14
Wave KW Street.........................................12
Edge KW Street..........................................11
374 - 400 King William St ..............................11
Adelaide Uni Engeneering Building..................8
Completed 2010
140 North Terrace ....................................20/18
20 Hindmarsh Square (Hotel)........................16
235 - 237 Pirie St (Freedom Apartments)........8
Ifould st Apartments...................................8
Re: Official CBD Crane Counter Thread - 7
An additional 6 cranes will be located on-site for the new RAH development according to today's presentation by the Treasurer. These cranes are listed as an 'economic benefit'.
Re: Official CBD Crane Counter Thread - 7
6? Holy Shiskebab!!!
Don't burn the Adelaide Parkland (preservation society)
Re: Official CBD Crane Counter Thread - 7
As I've said previously, the view of North Tce coming into the city from Port Rd is going to be a forest of cranes in 12-18 months time with RAH, Adelaide Oval, casino etc. It will be gobsmacking!
- skyliner
- Super Size Scraper Poster!
- Posts: 2359
- Joined: Tue Oct 24, 2006 9:16 pm
- Location: fassifern (near Brisbane)
Re: Official CBD Crane Counter Thread - 7
It'll make a statement about the place from the air and pass on positive messages to all and sundry - good value!!!
ADELAIDE - TOWARDS A GREATER CITY SKYLINE
ADELAIDE - TOWARDS A GREATER CITY SKYLINE
Jack.
Re: Official CBD Crane Counter Thread - 7
Back down to 6.
The crane at the Women's and Children's was removed today.
The crane at the Women's and Children's was removed today.
Re: Official Crane Counter Thread -
This might be the last update from me for a couple of month unless any cranes go up in the next 2 weeks as i'm off O/S for 6 weeks
Latest update
Latest update
Location........................................Levels............Crane
Completed 2011
Yorke Campus (Police Headquarters).................10
58-76 Franklin Street (Carpark)............................10
Women's and Children's Hospital Children's...........6 (3 existing + 3 new)
Under Construction
City Central 8................................................21.....................................2
Rundle Plaza Arcade.......................................19
58-76 Franklin Street (Office)...........................19
58-76 Franklin Street (Apartments)...................16
102 Waymouth St ..........................................16.....................................1
Globe Apartments..........................................15.....................................1
12-14 Rowlands Place......................................15
42 - 56 Franklin St (Carpark).............................8
74 Light Square..............................................8
Medical Reasearch Institute - North Terrace......6.....................................2
Illumin8........................................................6
TOTAL CBD CRANES:........................................6
October 2011
115 King William St ......................................25
176-186 Morphett Street .............................16
111-115 South Terrace .................................9
UNI SA Hindley Street...................................8
Convention Centre Redevelopment - Stage 1
November
66 Currie Street ........................................22
Approved/Proposed Upcoming
20 -22 Currie Street (ONH)............................31 (124m)
2-20 Flinders Street.....................................27 (100m)
64-68 Hindley St..........................................23
51 Pirie Street ...........................................22 (98m)
123 Flinders Street (PRO)..............................22
The Precinct Tower 2 .................................18
The Precinct Tower 3 .................................18
The Precinct Tower 4 .................................18
The Precinct Tower 5 .................................18
42 - 56 Franklin St (Office)............................17
152-160 Grote Street (PRO)............................16
399 King William Street (PRO)...........................15
Aurora Building West..................................15
160 Pulteney Street (PRO)..............................15
71 - 83 Franklin St......................................13
377 - 379 King William St (PRO).....................13
102-120 Wakefield Street (Office).....................12
302-306 Waymouth St (PRO)............................12
10 Andrew St.............................................11
Yorke Campus Buliding 3.............................10
Yorke Campus Buliding 2.............................10
Liverpool St (City West apartments).................9
Freedom Apartments T1...............................10
Freedom Apartments T2...............................8
Freedom Apartments T3...............................8
The Precinct (Loft)......................................7
Imagine 88 - O'Connell St...............................6
Completed 2008
Spark Hindley Street..................................15
Lot 8 Coglin St...........................................13
SA Water..................................................11
Tivoli.......................................................10
IPAD..........................................................9
Thompson Playford Gouger St........................8
The Precinct (Gallery).................................7
Completed 2009
Conservatory on Hindmarsh.........................18
The Precinct Tower 1 (Altitude)....................18
20 Hindmarsh Square (Apartment).................15
Aurora Building East ...................................14
Wave KW Street.........................................12
Edge KW Street..........................................11
374 - 400 King William St ..............................11
Adelaide Uni Engeneering Building..................8
Completed 2010
140 North Terrace ....................................20/18
20 Hindmarsh Square (Hotel)........................16
235 - 237 Pirie St (Freedom Apartments)........8
Ifould st Apartments...................................8
Re: Official CBD Crane Counter Thread - 6
August 2011 Update
There's been an upswing in the number of projects now moving into the early stages of construction with site works in currently in progress.
I'm guessing we'll see an extra 5 cranes by the end of September? Rundle Plaza Arcade (2), 12-14 Rowlands Place, Illumin8, and 74-80 Light Square moving from site works to structural construction stages. It looks like Globe Apartments has topped out, and crane should be down by month's end.
End of September could likely see 9 or 10 cranes on the skyline.
Let me know if there are any errors.
There's been an upswing in the number of projects now moving into the early stages of construction with site works in currently in progress.
I'm guessing we'll see an extra 5 cranes by the end of September? Rundle Plaza Arcade (2), 12-14 Rowlands Place, Illumin8, and 74-80 Light Square moving from site works to structural construction stages. It looks like Globe Apartments has topped out, and crane should be down by month's end.
End of September could likely see 9 or 10 cranes on the skyline.
Let me know if there are any errors.
- Attachments
-
- 2011.xlsx
- (53.19 KiB) Downloaded 294 times
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
Re: Official CBD Crane Counter Thread - 6
Its unrealistic to think we will see a crane on the Harris Scarfe site by the end of September.
End of the year would be more likely.
End of the year would be more likely.