I suspect we were only presented with a botch-up of the story in the first place. I put more faith in the information from the Infrastructureaustralia website.Westside wrote: Doubling the cost of one for little extra gain and not delivering on the other is not the way to do it.
[COM] Goodwood Junction Rail Underpass | $110m
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
cheers,
Rhino
Rhino
-
- Super Size Scraper Poster!
- Posts: 2148
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
That may well be the case, but if so why has nobody bothered to deny it before the followup report?rhino wrote:I suspect we were only presented with a botch-up of the story in the first place. I put more faith in the information from the Infrastructureaustralia website.Westside wrote: Doubling the cost of one for little extra gain and not delivering on the other is not the way to do it.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
While i think this is a wonderful project that is well overdue and will definatly be needed, i cannot help bu wonder why it costing 480 million for such a tiny tunnel. People are forgetting this is a cut and cover tunnel not a deep bore. In reality all a cut and cover tunnel is is a big trench with a roof over the top. They are not incredibley expensive. for 480 million in reality you could probably underground the entire outer harbour line. It seems stupid to spend so much money on such a small project. I would not be surprised also, judging by the sceptical nature of the article (in the way how it says What You Could Do with 418mil) if the journalist had not meddled with the figures at all.
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
i think that the $420m cost includes not just the bowden tunnel/separation of the interstate line from the Port line, but also includes the separation of the interstate line from the Noarlunga line down at Goodwood. could also include other grade separations like at Torrens Rd + new station at Ovingham, Cross Rd + new station at Unley Park, and they'd grade separate one of those Goodwood level crossings and just close the other one.
The State government could apply some pressure to the Federal government by suggesting that it would eventually become impossible for the Interstate trains to cross the suburban tracks during weekdays because the suburban trains will be much longer and running at much greater frequencies.
The State government could apply some pressure to the Federal government by suggesting that it would eventually become impossible for the Interstate trains to cross the suburban tracks during weekdays because the suburban trains will be much longer and running at much greater frequencies.
- fishinajar
- High Rise Poster!
- Posts: 276
- Joined: Mon May 12, 2008 12:23 pm
- Location: Adelaide
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
(From the nat. infrastructure pdf)jase111 wrote:http://www.infrastructureaustralia.gov. ... rities.pdf
Adelaide rail freight junctions and level crossings (Goodwood and Torrens)
Estimated cost ($2008) $420 M
Adelaide rail freight junctions and level crossings (Goodwood and Torrens)
The East–West Rail Corridor linking Melbourne–Adelaide–Perth has a primary role of efficiently moving freight. It is currently operationally inefficient and limited in capacity through Adelaide, since longer trains cannot pass due to constrained track geometry. Delays occur at points of intersection with the passenger rail and road network.
The initiative provides for new junctions at Goodwood and Torrens via grade separation of the passenger and freight rail lines, relocation of Goodwood passenger station, building of a new passenger station at Bowden, and replacement of a level crossing with a dual carriage way road underpass.
-
- High Rise Poster!
- Posts: 146
- Joined: Mon Aug 04, 2008 10:21 am
- Location: Melbourne (Adelaide expat)
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
Now THAT sounds better. It was obvious $400M+ for Bowden alone was just ludicrous.
Congrats to AdelaideNOW for another monumental fuckup in professional journalism.
Congrats to AdelaideNOW for another monumental fuckup in professional journalism.
"You pay for good roads, whether you have them or not! And it's not the wealth of a nation that builds the roads, but the roads that build the wealth of a nation." ...John F. Kennedy
-
- Super Size Scraper Poster!
- Posts: 2148
- Joined: Fri Dec 08, 2006 3:10 am
- Location: Christies Beach
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
If someone has evidence that either the 'tiser or Adelaide Now have reported this, please post it.
All we've got so far are two reports (a week apart) from the Messenger.
All we've got so far are two reports (a week apart) from the Messenger.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.
-
- High Rise Poster!
- Posts: 146
- Joined: Mon Aug 04, 2008 10:21 am
- Location: Melbourne (Adelaide expat)
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
... and AdelaideNow quoting them:Aidan wrote:All we've got so far are two reports (a week apart) from the Messenger.
http://www.adelaidenow.com.au/news/sout ... 6063223712
OK, fair point, it was the Messenger that reported it originally. But it's obvious NEITHER of them checked the facts and figures.
"You pay for good roads, whether you have them or not! And it's not the wealth of a nation that builds the roads, but the roads that build the wealth of a nation." ...John F. Kennedy
-
- Legendary Member!
- Posts: 537
- Joined: Mon Oct 27, 2008 9:13 pm
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
http://www.adelaidenow.com.au/sport/fre ... 6087583413Aidan wrote:If someone has evidence that either the 'tiser or Adelaide Now have reported this, please post it.
Typical quality newspaper.Infrastructure Australia has placed priority on a $418 million project to ease freight transport by rail through Adelaide.
The task to upgrade the Torrens and Goodwood rail junctions was included in the annual National Infrastructure Priority List.
edit: Just noticed its in the sport section
AdelaideNow: Now with 300% more Liberal Party hacks, at no extra cost.
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
Yeah, News Ltd definitely screwed it up.
http://www.infrastructureaustralia.gov. ... ments.aspx
http://www.infrastructureaustralia.gov. ... al2011.pdf
http://www.infrastructureaustralia.gov. ... ef2011.pdf
http://www.infrastructureaustralia.gov. ... ments.aspx
http://www.infrastructureaustralia.gov. ... al2011.pdf
http://www.infrastructureaustralia.gov. ... ef2011.pdf
I'm not sure what the 4 level crossings are. As a guess, I'd say Park Tce, Torrens Rd, Victoria St and Leader St. Not sure about number 5 either - Hawker Street?Consists of constructing grade separations at two at-grade freight/passenger rail intersections, the removal of 4 level road-rail crossings and modifications to one other level crossing (one on Adelaide’s Inner Ring Road and 4 on local roads), and associated works in and near the Adelaide inner suburbs of Bowden and Goodwood
$418M
- Pressman
- Sen-Rookie-Sational
- Posts: 18
- Joined: Wed Nov 29, 2006 6:32 pm
- Location: Whereever the Tin Chook takes me
[COM] Re: PRO: Bowden Rail Tunnel | 1km $418m
I'd say they would be Victoria and Leader streets at Goodwood, and Park Tce, Gibson St and East St at BowdenAtD wrote:I'm not sure what the 4 level crossings are. As a guess, I'd say Park Tce, Torrens Rd, Victoria St and Leader St. Not sure about number 5 either - Hawker Street?Consists of constructing grade separations at two at-grade freight/passenger rail intersections, the removal of 4 level road-rail crossings and modifications to one other level crossing (one on Adelaide’s Inner Ring Road and 4 on local roads), and associated works in and near the Adelaide inner suburbs of Bowden and Goodwood
$418M
- misscherida
- Sen-Rookie-Sational
- Posts: 1
- Joined: Thu Sep 22, 2011 8:29 pm
[COM] Re: PRO: Goodwood - Bowden rail grade seperation project | $
I support any plans and associated expenditure on vital transport infrastructure for our state.
Lots of people complain about SA transport systems.
It will not improve until the infrastructure is in place.
This costs mega bucks but it will improve our lives immeasurably.
Please don't be short sighted - lets do it and do it right!!!
Lots of people complain about SA transport systems.
It will not improve until the infrastructure is in place.
This costs mega bucks but it will improve our lives immeasurably.
Please don't be short sighted - lets do it and do it right!!!