[COM] Re: #PRO: Oaklands Rail Underpass

#346 Post by jase111 » Thu Jul 21, 2011 8:24 pm

How about morphett road under the train line.then have diagonal road go over the train line
Leaves the station where it is

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

[COM] Re: #PRO: Oaklands Rail Underpass

#347 Post by mattblack » Fri Aug 05, 2011 5:40 pm

[Shuz] wrote:
rhino wrote:I believe they will be elevating the railway and raising the station. Something I heard on the radio yesterday morning.
Bullshit.

There is no way that they would have built the Oaklands station, less than 5 years old, to rebuild it again.

Not to mention, they have just resleepered the Noarlunga Line through the station. Again, why all the time and effort, only to rip it up again?

Bullshit nothing. Most likely a rail overpass due to cost constraints of underpass and a road overpass is not viable due to access of businesses along Diagonal rd being basically screwed over. They'll rebuild Oaklands (embarassing to say the least - they can reuse the canapy section however and other fittings), the main problem is however that gradient the train needs to negotiate this height and fitting in a new Oaklands station (which needs to be built dead flat and not near the upwards or downwards gradient of the new line) will mean that Warradale station might also taken out.

Other news is that they are looking at a new station in the Castle Plaza area and maybe getting rid of Emerson (pretty speculative though).

muzzamo
Legendary Member!
Posts: 1029
Joined: Tue Aug 21, 2007 4:44 pm

[COM] Re: #PRO: Oaklands Rail Underpass

#348 Post by muzzamo » Sat Aug 06, 2011 3:55 pm

Building it as an overpass would also bring the station closer to the marion precinct, both logically and physically. Pedestrians would have direct access to the precinct without needing to cross a main road.

Aidan
Super Size Scraper Poster!
Posts: 2141
Joined: Fri Dec 08, 2006 3:10 am
Location: Christies Beach

[COM] Re: #PRO: Oaklands Rail Underpass

#349 Post by Aidan » Tue Aug 09, 2011 2:37 am

mattblack wrote:
[Shuz] wrote:
rhino wrote:I believe they will be elevating the railway and raising the station. Something I heard on the radio yesterday morning.
Bullshit.

There is no way that they would have built the Oaklands station, less than 5 years old, to rebuild it again.

Not to mention, they have just resleepered the Noarlunga Line through the station. Again, why all the time and effort, only to rip it up again?

Bullshit nothing.
...Buckleys buggerall! That's what they're likely to do there in the next decade. But when they eventually get round to doing something, it will be an underpass.

The new Oaklands station was designed to accommodate an underpass. And if they're sensible they'll stagger the north end so that Morphett Road Northbound traffic will cease to cross Diagonal Road southbound on the flat.

Even so, Brighton Road (Hove) should take priority.
Most likely a rail overpass due to cost constraints of underpass and a road overpass is not viable due to access of businesses along Diagonal rd being basically screwed over.
Those costs are trivial compared with the cost of raising the railway (with station) while it's in operation!
They'll rebuild Oaklands (embarassing to say the least - they can reuse the canapy section however and other fittings), the main problem is however that gradient the train needs to negotiate this height and fitting in a new Oaklands station (which needs to be built dead flat and not near the upwards or downwards gradient of the new line) will mean that Warradale station might also taken out.
I'm guessing this may have started with someone wanting to get rid of Warradale station and thinking raising the line might be a good excuse. But there's no way it would be seriously considered.
Other news is that they are looking at a new station in the Castle Plaza area and maybe getting rid of Emerson (pretty speculative though).
What is the source of your "news"?
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

[COM] Re: #PRO: Oaklands Rail Underpass

#350 Post by mattblack » Tue Aug 09, 2011 9:16 am

["Aidan"] wote

Even so, Brighton Road (Hove) should take priority.
Why? Its about freeing up a poorly designed arterial road not making a new and shiny station
Those costs are trivial compared with the cost of raising the railway (with station) while it's in operation!
You might want to tell that to the business owners along that stretch. I dont think costs are ever trivial, they are usually the first thing that comes up in any conversation to do about development of any sort.
What is the source of your "news"?
People who might know a thing or two when it comes to developing rail infrastructure. :D But like I said highly speculative, depends on how quickly residential component of the Castle Plaza developmentis up and going and what densities housing will end up being.

Aidan
Super Size Scraper Poster!
Posts: 2141
Joined: Fri Dec 08, 2006 3:10 am
Location: Christies Beach

[COM] Re: #PRO: Oaklands Rail Underpass

#351 Post by Aidan » Tue Aug 09, 2011 3:10 pm

mattblack wrote:
["Aidan"]
Even so, Brighton Road (Hove) should take priority.
Why? Its about freeing up a poorly designed arterial road not making a new and shiny station
Because the Brighton Road crossing is a bigger bottleneck and would be significantly cheaper to remedy.
Those costs are trivial compared with the cost of raising the railway (with station) while it's in operation!
You might want to tell that to the business owners along that stretch. I dont think costs are ever trivial, they are usually the first thing that comes up in any conversation to do about development of any sort.
I didn't say they were trivial in an absolute sense, I said they were trivial compared with the enormous costs of raising a railway (with station) while keeping it in operation.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

[COM] Re: #PRO: Oaklands Rail Underpass

#352 Post by mattblack » Tue Aug 09, 2011 3:54 pm

Okay believe what you want to believe Aidan, all I can say is that the most likely options on the table is what I stated before. If you have costings regarding your underpass/overpass argument for Marion Rd and a Benefit Cost analysis for whatever you think should happen at Brighton Rd forward them on to DTEI, it would probably save them a hell of alot of time and money and people would be forever thankful to you. :P

fabricator
Legendary Member!
Posts: 537
Joined: Mon Oct 27, 2008 9:13 pm

[COM] Re: #PRO: Oaklands Rail Underpass

#353 Post by fabricator » Wed Aug 10, 2011 12:22 am

My thoughts on this are to build not one but two road bridges/underpasses, not necessarily at the same time either.
First would go at the Northern end of the station, and replace the existing level crossing. The second would go at the southern end of the station and carry traffic from Diagonal Road. It should be easy enough to use the two to create proper merge/join lanes between the two roads.

The two road bridges/underpasses could be built decades apart if need be.
muzzamo wrote:Building it as an overpass would also bring the station closer to the marion precinct, both logically and physically. Pedestrians would have direct access to the precinct without needing to cross a main road.
Nonsense, the Southern end of the station goes right onto the Morphett/Diagonal connector road. Putting the station on a bridge would actually put it 9M or so higher up and hence no closer even if the station where directly over the road itself. Stairs and ramps are certainly not easier to use.

Big question at the moment is where Mike Ra... um Jane Weatherill will find the money to pay for this project. Given the Commonwealth's reluctance to pay for road projects but leaning towards rail projects instead.
AdelaideNow: Now with 300% more Liberal Party hacks, at no extra cost.

Aidan
Super Size Scraper Poster!
Posts: 2141
Joined: Fri Dec 08, 2006 3:10 am
Location: Christies Beach

[COM] Re: #PRO: Oaklands Rail Underpass

#354 Post by Aidan » Wed Aug 10, 2011 1:13 am

mattblack wrote:Okay believe what you want to believe Aidan, all I can say is that the most likely options on the table is what I stated before.
And I have already explained to you why it's actually a very unlikely option.

If you have costings regarding your underpass/overpass argument for Marion Rd and a Benefit Cost analysis for whatever you think should happen at Brighton Rd forward them on to DTEI, it would probably save them a hell of alot of time and money and people would be forever thankful to you. :P
They never seem to have appreciated anything I've told them before. But in this case I think it would be redundant anyway. Grade separation of Brighton Road is already being considered (if the Messenger is anything to go by). Marion Road was grade separated decades ago. Morphett/Diagonal Road will get an underpass - it's just a question of when.
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.

Aidan
Super Size Scraper Poster!
Posts: 2141
Joined: Fri Dec 08, 2006 3:10 am
Location: Christies Beach

[COM] Re: #PRO: Oaklands Rail Underpass

#355 Post by Aidan » Wed Aug 10, 2011 2:01 am

fabricator wrote:My thoughts on this are to build not one but two road bridges/underpasses, not necessarily at the same time either.
First would go at the Northern end of the station, and replace the existing level crossing. The second would go at the southern end of the station and carry traffic from Diagonal Road. It should be easy enough to use the two to create proper merge/join lanes between the two roads.
The northern end of Oaklands station is in a residential area, well away from any major road. Both roads are at the southern end of the station, and the station was designed to be compatible with the future construction of an underpass.
The two road bridges/underpasses could be built decades apart if need be.
Don't you understand? There will never be a need for an overpass as well as an underpass. The former would be noisy and unsightly, but most of all pointless, as traffic lights can easily handle the volume of traffic where Morphett and Diagonal Roads converge and diverge. And building a long overpass just to replace two sets of traffic lights might make sense on South Road, but it wouldn't make sense here!
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.

mattblack
Legendary Member!
Posts: 1084
Joined: Fri Feb 15, 2008 11:20 am

[COM] Re: #PRO: Oaklands Rail Underpass

#356 Post by mattblack » Wed Aug 10, 2011 9:00 am

Aidan wrote:
mattblack wrote:Okay believe what you want to believe Aidan, all I can say is that the most likely options on the table is what I stated before.
And I have already explained to you why it's actually a very unlikely option.
I seriously doubt that you have better connections than I do about this matter. Planning study being undertaken, everything is on the table, cost IS a major consideration. At this stage overpass s most likely but there are ramifiactions. End of story.

User avatar
rhino
Super Size Scraper Poster!
Posts: 3090
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[COM] Re: #PRO: Oaklands Rail Underpass

#357 Post by rhino » Wed Aug 10, 2011 2:14 pm

Aidan wrote: They never seem to have appreciated anything I've told them before.
Aidan wrote: Don't you understand?

:) :) :)
cheers,
Rhino

User avatar
metro
Legendary Member!
Posts: 970
Joined: Mon Sep 21, 2009 10:11 pm
Location: Sydney

[COM] Re: #PRO: Oaklands Rail Underpass

#358 Post by metro » Wed Aug 10, 2011 3:02 pm

Putting a bridge over the rail line makes the most sense to me. Would have to be the cheapest, quickest and most logical option. :cheers:

muzzamo
Legendary Member!
Posts: 1029
Joined: Tue Aug 21, 2007 4:44 pm

[COM] Re: #PRO: Oaklands Rail Underpass

#359 Post by muzzamo » Wed Aug 10, 2011 6:44 pm

I think that politics will play a very big role here. The government will not be too keen on ripping up the brand new station due to the potential for embarrassment.

User avatar
rhino
Super Size Scraper Poster!
Posts: 3090
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[COM] Re: #PRO: Oaklands Rail Underpass

#360 Post by rhino » Thu Aug 11, 2011 7:35 am

muzzamo wrote:I think that politics will play a very big role here. The government will not be too keen on ripping up the brand new station due to the potential for embarrassment.
And yet, that's exactly what Pat Conlon said was going to happen.
cheers,
Rhino