[COM] GPO Exchange | 85m | 22 Levels | Office
- HeapsGood
- High Rise Poster!
- Posts: 266
- Joined: Mon May 10, 2010 10:54 am
- Location: At the Adelaide Airport thankfully now not having to use a Dyson Airblade
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
25/10/17
- Attachments
-
- 22831029_10154715602616394_1664716832_o.jpg (491.87 KiB) Viewed 5637 times
*Looks at Dyson Airblade Factory* "I say we take off and nuke the entire site from orbit, it's the only way to be sure"
- timtam20292
- Legendary Member!
- Posts: 1473
- Joined: Tue Apr 19, 2016 1:03 pm
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
Can someone please explain all of the tyres currently sitting on site?
- HeapsGood
- High Rise Poster!
- Posts: 266
- Joined: Mon May 10, 2010 10:54 am
- Location: At the Adelaide Airport thankfully now not having to use a Dyson Airblade
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
No idea on the tyres.
They seem to be filling up a well/s or cavity space with concrete.
They seem to be filling up a well/s or cavity space with concrete.
- Attachments
-
- 20171103_140456_023.jpg (1.62 MiB) Viewed 5211 times
*Looks at Dyson Airblade Factory* "I say we take off and nuke the entire site from orbit, it's the only way to be sure"
- timtam20292
- Legendary Member!
- Posts: 1473
- Joined: Tue Apr 19, 2016 1:03 pm
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
Does anyone know if the road closure in Franklin Street, just outside the GPO is related to this or is completely seperate? There also appears to be an event set up on Victoria Square.
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
The road works out side the old GPO are nothing to do with this site. It is some sort of sewer project. It may be connected to the recent road work in Pulteny St.
Old tyres are put on the road when loading and unloading earth moving equipment with caterpillar tracks so that they don't damage the bitumen surface.
Old tyres are put on the road when loading and unloading earth moving equipment with caterpillar tracks so that they don't damage the bitumen surface.
- timtam20292
- Legendary Member!
- Posts: 1473
- Joined: Tue Apr 19, 2016 1:03 pm
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
Piling = construction. Time for a thread title change!
[COM] [U/C] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
Lots of piling has been done in the last few weeks. Photo from today
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
There was a mobile crane on site lifting something in /or out of the hole in the silver roof. see Norman's picture above.
- Mr Smith
- High Rise Poster!
- Posts: 147
- Joined: Fri May 18, 2012 4:41 pm
- Location: Parkside Lunatic Asylum
[COM] Re: 177-179 Victoria Square | 85m | 22 Levels | Office
A small excavator was lowered thru the roof
Who is online
Users browsing this forum: Bing [Bot], Google Adsense [Bot], Majestic-12 [Bot] and 4 guests