[COM] Adelaide Convention Centre - Stage 3 | $350m
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
Regardless i like the brutalist look, but doesn't matter what they do cant be worse than the morphett street addition
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
Does anyone know what the cladding material will be for this new extension … Is it copper cladding (like Adelaide Oval southern stand) or is it that brown aluminium cladding like the convention centre extension adjacent Morphett St?Waewick wrote:Regardless i like the brutalist look, but doesn't matter what they do cant be worse than the morphett street addition
I think the cladding choice will make or break this building. It can't appear too overbearing or heavy or the extension will look horrible. For this reason, I really hope it is the copper-like cladding, because I think that is important that the cladding has a degree of reflectivity that's can reflect the sun at different angles.
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
New steel work is being added above the massive first floor level.
- Attachments
-
- 20151012_CC 1.jpg (198.23 KiB) Viewed 5243 times
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
Somewhere during the redevelopment of the Convention Centre the most left of 3 lanes on the Morphett Street Bridge, heading south has been lost. I thought it was just temporary, during the construction of the Western Section, but it now appears to be permanent. This is resulting in traffic banking up sometimes almost up to Colonel Light's statue. Maybe this is part of a conspiracy by Adelaide City Council to frustrate motorists and at least it will make it more difficult for those Councillors living in North Adelaide. But on a serious note, this could become a dangerous barrier for any Ambulance from North of the Torrens traveling to the new RAH.
-
- Super Size Scraper Poster!
- Posts: 2576
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
I've noticed this also. The way they've gone about it makes it looks as though it's a temporary measure but it's clearly not. Poor planning if I may say so...crowdoc wrote:Somewhere during the redevelopment of the Convention Centre the most left of 3 lanes on the Morphett Street Bridge, heading south has been lost. I thought it was just temporary, during the construction of the Western Section, but it now appears to be permanent. This is resulting in traffic banking up sometimes almost up to Colonel Light's statue. Maybe this is part of a conspiracy by Adelaide City Council to frustrate motorists and at least it will make it more difficult for those Councillors living in North Adelaide. But on a serious note, this could become a dangerous barrier for any Ambulance from North of the Torrens traveling to the new RAH.
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
I raised the loss of one lane on the Morphett St bridge back in may see top of page 4. I think this is part of the Adelaide city council campaign against cars.
- Nathan
- Super Size Scraper Poster!
- Posts: 3826
- Joined: Tue Feb 03, 2009 1:09 pm
- Location: Bowden
- Contact:
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
What campaign against cars?EBG wrote:I raised the loss of one lane on the Morphett St bridge back in may see top of page 4. I think this is part of the Adelaide city council campaign against cars.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
Better put our tin foil hats on.Nathan wrote:What campaign against cars?EBG wrote:I raised the loss of one lane on the Morphett St bridge back in may see top of page 4. I think this is part of the Adelaide city council campaign against cars.
Seriously though, if there was a campaign against cars, we wouldn't have to worry about the ACC's incompetence with the Frome Street bikeway.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
-
- Super Size Scraper Poster!
- Posts: 2576
- Joined: Tue Mar 05, 2013 4:41 pm
- Location: Adelaide CBD, SA
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
I'm all for the removal of cars from the CBD grid, but I can't help but feel the loss of this lane is a show for communication breaking down between the state government and ACC.ChillyPhilly wrote:Better put our tin foil hats on.Nathan wrote:What campaign against cars?EBG wrote:I raised the loss of one lane on the Morphett St bridge back in may see top of page 4. I think this is part of the Adelaide city council campaign against cars.
Seriously though, if there was a campaign against cars, we wouldn't have to worry about the ACC's incompetence with the Frome Street bikeway.
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
You lost me there.Patrick_27 wrote:but I can't help but feel the loss of this lane is a show for communication breaking down between the state government and ACC.
The lane closure i assume is because the new "main" entrance to the convention center is on that side. It is now a set down zone for taxi and buses plus gives pedestrians a little bit of room to poorly queue in a crowd without standing in the middle of oncoming traffic.
Maybe the lane would reopen if a fence was installed, or another main entrance is established. It really looks like the lane config in its current form is not the final configuration.
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
Some more steel work arriving today 20 0ct. The semi trailer carrying just one extra long column has just come across the Torrens bridge from Montefiore hill and is turning off to go down to the actual site
- Attachments
-
- 20151020_CC Steel.jpg (367.08 KiB) Viewed 4946 times
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
A close up of the under side of the first floor 24 Oct 2015.
- Attachments
-
- 20151024_cc.jpg (220.34 KiB) Viewed 4775 times
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
The steel work is being installed from the east, centre and western sides. Picture 3 Nov 2015. The crawler tower crane is on the ground being reconfigured, (near the tall tree).
- Attachments
-
- 20151103_CC.jpg (293.14 KiB) Viewed 4528 times
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
The steel work has progressed considerably since my last picture. also the under side of the first floor steel work has been painted white.
- Attachments
-
- 20151114_cc.jpg (395.14 KiB) Viewed 4252 times
-
- High Rise Poster!
- Posts: 197
- Joined: Sun Nov 15, 2015 2:32 am
[COM] Re: Adelaide Convention Centre - Stage 3 | $350m
Adelaide really needs more "wow look at that buildings" something really out of the ordinary would have been great here.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk