[COM] Re: COM: South Road Superway | $842m | 3km

#1636 Post by spiller » Mon Mar 24, 2014 2:01 pm

Aidan, large, high signs along elevated highways are common practice all over the world.

Aidan
Super Size Scraper Poster!
Posts: 2148
Joined: Fri Dec 08, 2006 3:10 am
Location: Christies Beach

[COM] Re: COM: South Road Superway | $842m | 3km

#1637 Post by Aidan » Mon Mar 24, 2014 2:29 pm

spiller wrote:Aidan, large, high signs along elevated highways are common practice all over the world.
In the form of billboards, yes. And many office blocks have corporate logos on them visible from elevated highways. But putting up signs to alert motorists on the elevated highway to the presence of a fuel station they can't access is not common practice!
Just build it wrote:Bye Union Hall. I'll see you in another life, when we are both cats.

User avatar
spiller
High Rise Poster!
Posts: 396
Joined: Thu Apr 08, 2010 9:13 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1638 Post by spiller » Mon Mar 24, 2014 2:38 pm

Aidan wrote:
spiller wrote:Aidan, large, high signs along elevated highways are common practice all over the world.
In the form of billboards, yes. And many office blocks have corporate logos on them visible from elevated highways. But putting up signs to alert motorists on the elevated highway to the presence of a fuel station they can't access is not common practice!
I disagree. Plenty of gas stations in the US utilise similar signage along their highways. Maybe not as much in built up areas as opposed to rural areas but they exist, and quite commonly. What's the big deal with it anyway? Not as if that stretch of road is particularly easy on the eye such that a big sign will spoil the view.

User avatar
monotonehell
VIP Member
VIP Member
Posts: 5466
Joined: Fri Feb 01, 2008 12:10 am
Location: Adelaide, East End.
Contact:

[COM] Re: COM: South Road Superway | $842m | 3km

#1639 Post by monotonehell » Mon Mar 24, 2014 4:30 pm

Let's not do this. One nice thing about having an elevated motorway is the view.
Exit on the right in the direction of travel.

User avatar
rhino
Super Size Scraper Poster!
Posts: 3093
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[COM] Re: COM: South Road Superway | $842m | 3km

#1640 Post by rhino » Mon Mar 24, 2014 4:36 pm

monotonehell wrote:Let's not do this. One nice thing about having an elevated motorway is the view.
I agree, but unless it becomes a council by-law, I can't see it stopping. Advertising - it's ugly but it works.
cheers,
Rhino

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1641 Post by EBG » Mon Mar 24, 2014 11:20 pm

While the upper level is now open in both directions and I tried out the going north direction on the week end , the lower level north of of Grand junction Road is far from complete. It was not possible to drive north from grand junction road to Cormack road last Sunday without numerous detours.

superway_sam
Sen-Rookie-Sational
Posts: 11
Joined: Thu Mar 13, 2014 11:30 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1642 Post by superway_sam » Tue Mar 25, 2014 10:05 pm

GoodSmackUp wrote:
rev wrote:It amazes me how this can cost nearly $900 million and yet there is still exposed plumbing visible while driving on south rd below. Looks ridiculous, as if plumbing and drainage was an after thought.

Even worse, when it rains, it leaks in sever spots onto south rd below.


Should we expect the torrens to torrens trench to have exposed stop water pipes and to flood when it rains?
There's also a gap in between two road segments, it's near the grand junction road exit
Yes those nuisance leaks will be sealed. Still have shrouds at the piers to erect to hide the plumbing, but the longitudinal stuff will be visible, although they tuck behind the parapet.

850 million included accommodation works and the precast yard. Believe me, the state has well and truly got its moneys worth.

Gap in segments will be completed.

superway_sam
Sen-Rookie-Sational
Posts: 11
Joined: Thu Mar 13, 2014 11:30 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1643 Post by superway_sam » Tue Mar 25, 2014 10:08 pm

EBG wrote:While the upper level is now open in both directions and I tried out the going north direction on the week end , the lower level north of of Grand junction Road is far from complete. It was not possible to drive north from grand junction road to Cormack road last Sunday without numerous detours.
Yes as I indicated in a previous post, at grade is still being completed. Weekends and nights are utilised to carry out this work.

Remember you cant reach Salisbury Highway at grade. In fact if you head north from Grand Junction Rd and want to stay at grade, the final design does not allow a direct route as per the old south Rd. That has now disappeared, and you will need to turn left at the Caltex, travel along Brabham circuit, right at Francis Rd, then left on the alignment which resembles the old at Grade South Rd. Even then you will arrive at Wing Street and can not go any further north.
Last edited by superway_sam on Tue Mar 25, 2014 10:22 pm, edited 1 time in total.

superway_sam
Sen-Rookie-Sational
Posts: 11
Joined: Thu Mar 13, 2014 11:30 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1644 Post by superway_sam » Tue Mar 25, 2014 10:17 pm

rev wrote:
Westside wrote:Just beacuse a road is open does not mean the project is complete. There is usually a grace period where any defects are identified and must be rectified before the road is handed over and project deemed complete. I suggest this is still some months away.
Well, yeah, however those same sections that leak onto the road below, have been leaking for months already every time there is a bit of rain about.
Those pipes on the underside have been viewable for many more months then that as well.


I've also noticed the road surfaces are different.
Driving along south road north bound below, as you pass the BP and come up towards the precast yard, and up till the grand junction rd intersection, the surface is very noisy in particular as you slow down.
Never heard so much noise on a new road surface before.
No, the asphaltic wearing course is the same, from the same batch plant, same process, same mix design; just laid on a different shift but under very similar conditions. Bog standard AC10 modified binder dense grade mix.

How quiet is it on the deck though, the Open Grade really keeps the noise down.

In regards to the leaks, the sumps have not been in for very long, so before that there were sheets of ply over the penetrations. Some sumps are fine, others need some extra sealing, and at others its the connection to the plumbing. Will be fixed.

superway_sam
Sen-Rookie-Sational
Posts: 11
Joined: Thu Mar 13, 2014 11:30 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1645 Post by superway_sam » Tue Mar 25, 2014 10:30 pm

AG wrote:
Westside wrote:Just beacuse a road is open does not mean the project is complete. There is usually a grace period where any defects are identified and must be rectified before the road is handed over and project deemed complete. I suggest this is still some months away.
I am aware that there is still some minor drainage works going on, but for general purpose and usage, it is at practical completion where the infrastructure is open for the key function it is designed to perform.
It is not at practical completion at this point in time. It is operating in a limited capacity, at lower speeds and without the ITS - Intelligent Transport System - operational. Signals at grade are also still being completed, amongst other things. However we are getting there. :D

neoballmon
Legendary Member!
Posts: 522
Joined: Sun Aug 26, 2012 10:54 am
Location: Morphett Vale

[COM] Re: COM: South Road Superway | $842m | 3km

#1646 Post by neoballmon » Wed Mar 26, 2014 6:07 pm

superway_sam wrote:It is not at practical completion at this point in time. It is operating in a limited capacity, at lower speeds and without the ITS - Intelligent Transport System - operational.
Saw a post on DPTI's Facebook informing that the southbound carriageway would be closed overnight on Friday for signal testing. Does that mean if the signals are working fine, they'll be switched on permanently with the new 90 limit?
Looking forward to a free-flowing Adelaide!

User avatar
rhino
Super Size Scraper Poster!
Posts: 3093
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[COM] Re: COM: South Road Superway | $842m | 3km

#1647 Post by rhino » Thu Mar 27, 2014 9:53 am

Superway Sam, thankyou for your posts, they are very informative and clear up a lot of speculation. Much appreciated.
cheers,
Rhino

User avatar
spiller
High Rise Poster!
Posts: 396
Joined: Thu Apr 08, 2010 9:13 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1648 Post by spiller » Thu Mar 27, 2014 1:58 pm

I use this once per week in both directions on a commute between business locations. Yesterday whilst heading north, it appears this has created a large bottle neck where traffic merges from the Port River expressway onto Port Wakefield Road in a northerly direction. It is a single lane merge. I'm not sure if this has always been a bit of a bottle neck but my thoughts are that the superway is now delivering traffic to Pt.WR at a much faster rate than the old system, and this basic merger cannot keep up. bring on the northern connector?

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6421
Joined: Sat Nov 11, 2006 12:14 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1649 Post by rev » Thu Mar 27, 2014 8:46 pm

rhino wrote:Superway Sam, thankyou for your posts, they are very informative and clear up a lot of speculation. Much appreciated.
x2 thanks Sam, appreciate you clearing up the things I posted about.

Brucetiki
Legendary Member!
Posts: 995
Joined: Tue Apr 17, 2012 6:20 pm

[COM] Re: COM: South Road Superway | $842m | 3km

#1650 Post by Brucetiki » Thu Mar 27, 2014 10:21 pm

spiller wrote:I use this once per week in both directions on a commute between business locations. Yesterday whilst heading north, it appears this has created a large bottle neck where traffic merges from the Port River expressway onto Port Wakefield Road in a northerly direction. It is a single lane merge. I'm not sure if this has always been a bit of a bottle neck but my thoughts are that the superway is now delivering traffic to Pt.WR at a much faster rate than the old system, and this basic merger cannot keep up. bring on the northern connector?
Port River Expressway doesn't connect to Port Wakefield Rd