Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Wed Jan 12, 2022 2:59 pm
by EBG
The tower crane at the festival plaza is going up today 12/1/2022. Please click on picture for bigger.
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Wed Jan 12, 2022 3:37 pm
by AG
Looks like the crane sections were only delivered this morning as I saw them waiting on trucks on Sir Donald Bradman Drive this morning on my way to the airport.
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Wed Jan 12, 2022 4:53 pm
by Pikey
Hammerhead by the looks of it too. Not surprising due to the proximity of the flight path
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Wed Jan 12, 2022 10:16 pm
by [Shuz]
Is it just me or does it look like it's been erected to full height already?
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Thu Jan 13, 2022 12:29 am
by Ho Really
Pikey wrote: ↑Wed Jan 12, 2022 4:53 pm
Hammerhead by the looks of it too. Not surprising due to the proximity of the flight path
Unless my eyes deceived me saw otherwise on 9 News at 6pm.
[Shuz] wrote: ↑Wed Jan 12, 2022 10:16 pm
Is it just me or does it look like it's been erected to full height already?
It should go higher. At this height the roof won't be any taller than the Intercontinental.
Cheers
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Thu Jan 13, 2022 10:17 am
by EBG
The festival centre crane will go higher because it has the external jacking system already installed. This is the red tower section 3/4 the way up the tower. to increase height the jacking section is moved to the top of the tower and the crane itself is unbolted from the tower. Note the jacking system is open on one side (opposite the the side with the jacks). The jack then lifts the crane up off the tower just more than one standard tower section and so a new tower section can be slid into the space at the top of the tower and bolted to the top of the existing tower and the jacks lower to enable the new section to be bolted the bottom of the crane. each time the crane gains height usually 2 or more new sections are added. At the end of the project when the crane is no longer needed , tower sections are removed until it is within reach of a mobile so it can be fully removed. Please refer to attached videos showing how a tower crane gains height .
https://www.youtube.com/watch?v=wXpKRLr ... nstruction
https://www.youtube.com/watch?v=EfPORD4 ... chrisIrlam
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Thu Jan 13, 2022 12:42 pm
by Pikey
Ho Really wrote: ↑Thu Jan 13, 2022 12:29 am
Pikey wrote: ↑Wed Jan 12, 2022 4:53 pm
Hammerhead by the looks of it too. Not surprising due to the proximity of the flight path
Unless my eyes deceived me saw otherwise on 9 News at 6pm.
[Shuz] wrote: ↑Wed Jan 12, 2022 10:16 pm
Is it just me or does it look like it's been erected to full height already?
It should go higher. At this height the roof won't be any taller than the Intercontinental.
Cheers
Definitely a hammer head, what you saw on the news was the assembly portable crane boom
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Thu Jan 13, 2022 1:15 pm
by VinyTapestry849
Festival Plaza Crane looking pretty big! 7News Camera this morning
As said previously by Pikey/EBG it's a hammer head crane.
Re: Crane Counter: CBD 8 | Metro 3 | Total 11
Posted: Thu Jan 13, 2022 6:20 pm
by Ho Really
Pikey wrote: ↑Thu Jan 13, 2022 12:42 pm
Ho Really wrote: ↑Thu Jan 13, 2022 12:29 am
Pikey wrote: ↑Wed Jan 12, 2022 4:53 pm
Hammerhead by the looks of it too. Not surprising due to the proximity of the flight path
Unless my eyes deceived me saw otherwise on 9 News at 6pm.
[Shuz] wrote: ↑Wed Jan 12, 2022 10:16 pm
Is it just me or does it look like it's been erected to full height already?
It should go higher. At this height the roof won't be any taller than the Intercontinental.
Cheers
Definitely a hammer head, what you saw on the news was the assembly portable crane boom
The dead giveaway is the tower itself and the cabin placement. Obviously the angle I saw briefly last night was bad and it looked like the crane boom was on slightly elevated angle. Just watched a few minutes of 9 News tonight. Kudos to you Pikey.
Cheers
Re: Crane Counter: CBD 9 | Metro 3 | Total 12
Posted: Sat Jan 15, 2022 12:33 pm
by Prodical
Second crane going up at SAHMRI 2
Re: Crane Counter: CBD 9 | Metro 3 | Total 12
Posted: Sat Jan 15, 2022 2:52 pm
by EBG
Some pictures of second crane at SAHMRI as mentioned by Prodical. The second crane is diagonally opposite the existing crane. Please click on pictures for bigger.
Re: Crane Counter: CBD 9 | Metro 3 | Total 12
Posted: Sun Jan 16, 2022 3:47 pm
by EBG
Picture of the completed crane at the festival plaza site. Note this crane is illuminated in a pinkish colour at night 16/01/2022.
Re: Crane Counter: CBD 9 | Metro 3 | Total 12
Posted: Sat Jan 22, 2022 7:51 pm
by Prodical
A few photos from the SAHMRI crane today. The final 3 sections for the second crane were almost in place when the wind came up and then the rain started, so it was abandoned for the day. It looks like the second crane will be taller than # 1 and hopefully will be completed soon. I would think that SAHMRI will really start to progress soon and complete the health and medical precinct (until the W&C Hospital commences.
Re: Crane Counter: CBD 9 | Metro 3 | Total 12
Posted: Sat Feb 05, 2022 2:29 pm
by Prodical
second crane going up today
Will post photo soonish
Re: Crane Counter: CBD 9 | Metro 3 | Total 12
Posted: Sat Feb 05, 2022 2:34 pm
by Prodical
second crane