Page 176 of 418

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Mon Jun 08, 2015 9:49 pm
by Waewick
Norman wrote:In peak hours there are trains that only stop at Gawler, Smithfield, Elizabeth, Salisbury and Mawson Lakes.
really, I would have thought there would be an express of sorts - whats the time like? the internet suggests a bit over an hr ?

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Mon Jun 08, 2015 10:16 pm
by PD2/20
Waewick wrote:
Norman wrote:In peak hours there are trains that only stop at Gawler, Smithfield, Elizabeth, Salisbury and Mawson Lakes.
really, I would have thought there would be an express of sorts - whats the time like? the internet suggests a bit over an hr ?
44 min from Gawler, 48 from Gawler Cen.

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Mon Jun 08, 2015 10:38 pm
by Waewick
PD2/20 wrote:
Waewick wrote:
Norman wrote:In peak hours there are trains that only stop at Gawler, Smithfield, Elizabeth, Salisbury and Mawson Lakes.
really, I would have thought there would be an express of sorts - whats the time like? the internet suggests a bit over an hr ?
44 min from Gawler, 48 from Gawler Cen.
That's not too bad so about 1/2 hr quicker than car.

Sorry for all the questions but would electrification have sped that up?

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Mon Jun 08, 2015 11:26 pm
by Norman
Yes, there was an estimate of 5-7 minute time saving after electrification, but that could apply only to the all stoppers.

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Sat Jun 13, 2015 1:11 pm
by Eurostar
now that the Electric train sets are nearly all here is there plans to finish the roofs at Hallett Cove?

Re: News & Discussion: Trains

Posted: Wed Jul 08, 2015 8:48 am
by [Shuz]
Looks like Adelaide Metro is getting a bit slack with graffiti removal on the trains? Quite a number of them are tagged.

Is this a consequence of the recent workers strike and industrial action? Do these workers literally cease doing maintenance work and whinge about pay and conditions whilst not fulfilling the basic tenets of their job descriptions? How is this not grounds for dismissal?

Re: News & Discussion: Trains

Posted: Wed Jul 08, 2015 9:10 am
by Llessur2002
I definitely read something about the workers refusing to clean or report graffiti as part of their industrial action.

But I don't know enough about their pay and conditions to comment on whether I support their actions or not...

Re: News & Discussion: Trains

Posted: Wed Jul 08, 2015 3:28 pm
by Will
[Shuz] wrote:Looks like Adelaide Metro is getting a bit slack with graffiti removal on the trains? Quite a number of them are tagged.

Is this a consequence of the recent workers strike and industrial action? Do these workers literally cease doing maintenance work and whinge about pay and conditions whilst not fulfilling the basic tenets of their job descriptions? How is this not grounds for dismissal?
Workers have a right to engage in industrial action, during which they obviously do not undertake their usual duties.

Re: News & Discussion: Trains

Posted: Wed Jul 08, 2015 3:54 pm
by Waewick
graffitti is one of my biggest bug bears.

hate it.

Re: News & Discussion: Trains

Posted: Wed Jul 08, 2015 5:20 pm
by Patrick_27
So Shuz, rather than have a crack at those who print the graffiti on the train, you instead stab the maintenance workers for not cleaning it up?

Re: News & Discussion: Trains

Posted: Wed Jul 08, 2015 5:35 pm
by [Shuz]
That's correct.

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Sun Jul 12, 2015 12:44 am
by PeFe
Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Mon Jul 13, 2015 12:28 pm
by Westside
PeFe wrote:Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.
The original design was to have the roof cover from platform to platform (tracks included). This was purposely left off while Diesels still run along the line. The question is whether the original plan to completely cover the station will be done given the line is now electrified.

My feeling is not for a while as there is still a chance they may need to run diesels through the station, even if only in an emergency type situation.

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Mon Jul 13, 2015 3:23 pm
by SouthAussie94
Westside wrote:
PeFe wrote:Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.
The original design was to have the roof cover from platform to platform (tracks included). This was purposely left off while Diesels still run along the line. The question is whether the original plan to completely cover the station will be done given the line is now electrified.

My feeling is not for a while as there is still a chance they may need to run diesels through the station, even if only in an emergency type situation.
What real benefit is there to completely covering the station?

I used to catch the train from Hallet Cove Beach. When it rains a small portion of the platform gets wet due to water coming from above the tracks. I significantly larger amount comes in from the open sides of the platform. Unless the sides are also enclosed, the platforms will still get wet when it rains..

Re: U/C: Electrification & Upgrade of the Adelaide Rail Netw

Posted: Mon Jul 13, 2015 4:42 pm
by rev
SouthAussie94 wrote:
Westside wrote:
PeFe wrote:Please explain...what is unfinished about the roofs at the Hallet Cove railway stations? Last time I was out that way (March) the roof covered the entire platform, arching over any in station train if my memory is correct.
The original design was to have the roof cover from platform to platform (tracks included). This was purposely left off while Diesels still run along the line. The question is whether the original plan to completely cover the station will be done given the line is now electrified.

My feeling is not for a while as there is still a chance they may need to run diesels through the station, even if only in an emergency type situation.
What real benefit is there to completely covering the station?

I used to catch the train from Hallet Cove Beach. When it rains a small portion of the platform gets wet due to water coming from above the tracks. I significantly larger amount comes in from the open sides of the platform. Unless the sides are also enclosed, the platforms will still get wet when it rains..
Does the rain always blow in sideways in your world?
This isn't a dig at you, but really can this state stop it's fucking whinging about every damn thing possible?
What's next, people are going to want outdoor heaters and air conditioning installed at train stations? How about couches and flat screen tvs with foxtel and chefs on hand to cook for people?