[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Fri Feb 05, 2016 10:03 pm
by EBG
Yes the piling machine is the type that digs a trench type wall. Hopefully I can get a picture soon.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sat Feb 06, 2016 9:48 am
by Dvious
Everything looks to be from the stone age lol

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sat Feb 06, 2016 5:24 pm
by Patrick_27
Brando wrote:
Patrick_27 wrote:With the standard of equipment being used on site at the moment, makes me wonder what kind of cheapskates are running this operation.
So does your theory apply to the same equipment being used on Bohem apartments?
I haven't seen the equipment on the Bohem site, however if you're suggesting that the equipment used there is of the same standard, then yes... My theory would apply. :)

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sun Feb 07, 2016 5:49 pm
by EBG
Here are some pictures of this site taken 6 Feb 2016. the piling machine digs (literally) rectangular sections just bigger than the reinforcement cages lying on the ground. these sections then form the basement wall around the boundary. Pictures 1. general site, 2. the cutting head of the piling machine .3 completed sections once concreted in.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Wed Feb 10, 2016 9:30 pm
by AG
fishinajar wrote:Pretty sure its piling equipment. I think of the kind that completes the basement walls prior to excavation if that makes any sense. This is just from my observation. Not fact.
This looks about right. So they excavate a trench to the required depth and fill the excavation with a bentonite slurry to keep the excavation open. Then they place the rebar cage in the excavation before displacing the slurry with concrete. Once the perimeter walls are completed, the excavation then commences.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Tue Mar 01, 2016 12:13 pm
by Ben
Not much to see but lots of workers on site.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sat Mar 12, 2016 9:27 pm
by EBG
For Ben. Picture reduced to 1/3 original

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Thu Mar 24, 2016 2:22 pm
by Ben
Anyone been past? Crane must be close.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Mon Mar 28, 2016 11:31 pm
by EBG
Basement level currently being excavated . Crane base can't be done until excavation finished(?) Picture Sat 26 Mar 16.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sun Apr 03, 2016 10:09 pm
by EBG
There has been considerable progress in the basement since my last picture.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Mon Apr 04, 2016 8:14 am
by realstretts
Thanks for the pics EBG
Basement should be 3 levels deep, progress looks good

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sun Apr 10, 2016 11:54 pm
by EBG
As Realstretts stated, the basement is now even deeper. I could not fit it all in one picture. My previous pictures were taken from the street on the Right hand side, where the excavators are parked

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Mon Apr 25, 2016 10:59 pm
by EBG
The basement is now at least 3 stories deep as at 24 Apr 16. Sorry about the angle of the photo I was balancing my phone on the top of the fence.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sun May 08, 2016 10:04 pm
by EBG
An update on the basement work. Footing work is taking place near the bottom of the ramp down. All basement projects like Kent town August tower on south Tce and hotel in Hindley Street could get a bit messy if we have prolonged heavy down pours.

[COM] Re: East Park, Kent Town | 36m | 11 Levels

Posted: Sun May 15, 2016 5:20 pm
by Prodical
A white crane base installed in the centre of the site. Reinforcing steel mesh for the base is there but yet to be concreted. Probably a couple of weeks away