[U/C] M2 North-South Motorway

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
Eurostar
Legendary Member!
Posts: 954
Joined: Thu Jun 24, 2010 3:44 pm

[U/C] Re: [U/C] Re: M2 North-South Motorway

#5011 Post by Eurostar » Fri Nov 20, 2020 12:18 pm

rev wrote:
Wed Nov 18, 2020 12:34 pm
ChillyPhilly wrote:
Wed Nov 18, 2020 11:09 am
Simmos083 wrote:Why would we want more buses on a motorway? There are trains down south which are much faster then a bus to get into the city. We want to get Adelaide moving not slow it down. Motor Ways are for cars, we don’t need more buses in Adelaide to clog up our road system.
Our road system is already clogged.

It's clogged because people don't use public transport enough.

Ironic, I know.

So big yes to creating routes that use faster roads.
Its congested not only because there isn't more public transport usage, but because the network is poorly designed, even the light sequences are ridiculous in parts. You have lights that turn green, and lead you a short distance (less then 100m) right into a red light. Ridiculous. Or lights that are green ahead, you get a green light, and by the time you get there, they're red.

Public transport is even more piss poor. There's very little convenience in using it for the majority.
Why would I go out of my way to find a train station in the suburbs, most of which have inadequate parking facilities, and then get off say in the city, and have to walk long distances? Ok you can catch a tram up the spine of the city, and then walk slightly shorter distances.
This is why we need a tram loop through the city and an underground rail loop, and why suburban train stations need proper parking facilities, proper links with other public transport such as buses, or trams.
A whole network that spans the whole metro area, that loops around via multiple interconnected modes, trains, trams and buses.
Similar to what happens up north, you get green light from Womma Road, once on Main North Road heading towards the City before you get to Elizabeth Way/Ifould Road you get a red light.

User avatar
Norman
Donating Member
Donating Member
Posts: 6485
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: M2 North-South Motorway

#5012 Post by Norman » Sat Nov 21, 2020 9:47 pm

Here's the latest drive-through video from last month. Any feedback is appreciated as always.

https://youtu.be/1jO2IQCM4JY

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: M2 North-South Motorway

#5013 Post by EBG » Sun Nov 29, 2020 10:41 pm

28/11/2020/ Regency Rd looking north west showing the ramp up for the northern side of the new bridge over Regency Rd. Please click on picture for bigger.
Attachments
20201128_southern expressway 2.jpg

claybro
Super Size Scraper Poster!
Posts: 2439
Joined: Mon Jun 18, 2012 9:16 pm

[U/C] Re: M2 North-South Motorway

#5014 Post by claybro » Mon Nov 30, 2020 2:35 pm

Still not really sure why they didn't put Regency either over or under the motorway instead of the other way around. It would have required a narrower overpass, and would have taken away yet another undulation on the motorway.

User avatar
Norman
Donating Member
Donating Member
Posts: 6485
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: M2 North-South Motorway

#5015 Post by Norman » Mon Nov 30, 2020 3:24 pm

claybro wrote:
Mon Nov 30, 2020 2:35 pm
Still not really sure why they didn't put Regency either over or under the motorway instead of the other way around. It would have required a narrower overpass, and would have taken away yet another undulation on the motorway.
You still need to accommodate the actual intersection of South Road (Surface Roads) and Regency Road, which is much cheaper to accommodate at level than raising or lowering that intersection. There are also issues with access to local businesses, including a major commercial centre in the south-west corner.

If more money was allocated, they could have put the motorway into an extended trench surfacing to the north of Regency Road, but what they are building now is an acceptable outcome.

victorious80
Gold-Member ;)
Posts: 93
Joined: Fri Jul 31, 2009 8:33 am

[U/C] Re: M2 North-South Motorway

#5016 Post by victorious80 » Tue Dec 01, 2020 9:08 am

Also, one of Adelaide's critical gravity sewer mains runs down Regency Rd, with minimal grade (pretty much flat) and therefore minimal scope to realign. Not the only reason of course, but a contributor.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2764
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#5017 Post by ChillyPhilly » Tue Dec 01, 2020 9:59 am

Plenty of markings on footpath, verge and road along South Road between Hilton and up to around Richmond Road.

Also spotted a large piling rig just off the road, west of the above.
Our state, our city, our future.

All views expressed on this forum are my own.

Eurostar
Legendary Member!
Posts: 954
Joined: Thu Jun 24, 2010 3:44 pm

[U/C] Re: M2 North-South Motorway

#5018 Post by Eurostar » Tue Dec 01, 2020 10:29 am

claybro wrote:
Mon Nov 30, 2020 2:35 pm
Still not really sure why they didn't put Regency either over or under the motorway instead of the other way around. It would have required a narrower overpass, and would have taken away yet another undulation on the motorway.
I find the overpass looks similar setup as Emerson Overpass minus a railway crossing on the ground

User avatar
SouthAussie94
Legendary Member!
Posts: 585
Joined: Tue Mar 27, 2012 10:03 pm
Location: Southern Suburbs

[U/C] Re: M2 North-South Motorway

#5019 Post by SouthAussie94 » Tue Dec 01, 2020 12:39 pm

ChillyPhilly wrote:
Tue Dec 01, 2020 9:59 am
Plenty of markings on footpath, verge and road along South Road between Hilton and up to around Richmond Road.

Also spotted a large piling rig just off the road, west of the above.
Piling rig is doing the geotechnical exploration to determine soil conditions along the corridor.

Service locating and surveying of the corridor is also under way at the moment.
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"

Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation

SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[U/C] Re: M2 North-South Motorway

#5020 Post by SBD » Tue Dec 01, 2020 2:39 pm

SouthAussie94 wrote:
Tue Dec 01, 2020 12:39 pm
ChillyPhilly wrote:
Tue Dec 01, 2020 9:59 am
Plenty of markings on footpath, verge and road along South Road between Hilton and up to around Richmond Road.

Also spotted a large piling rig just off the road, west of the above.
Piling rig is doing the geotechnical exploration to determine soil conditions along the corridor.

Service locating and surveying of the corridor is also under way at the moment.
Hopefully they locate all the watermains and other underground services before someone else shows up with a geotechnical drill rig so they can avoid the services that are still active!

Eurostar
Legendary Member!
Posts: 954
Joined: Thu Jun 24, 2010 3:44 pm

[U/C] Re: M2 North-South Motorway

#5021 Post by Eurostar » Thu Dec 03, 2020 10:43 pm

FB_IMG_1606997442071.jpg
This weekend's R2P works

User avatar
d3v310per
High Rise Poster!
Posts: 164
Joined: Fri May 24, 2019 10:52 am

[U/C] Re: M2 North-South Motorway

#5022 Post by d3v310per » Fri Dec 11, 2020 10:23 am

Regency Road Intersection November 2020

Image

User avatar
d3v310per
High Rise Poster!
Posts: 164
Joined: Fri May 24, 2019 10:52 am

[U/C] Re: M2 North-South Motorway

#5023 Post by d3v310per » Fri Dec 11, 2020 10:29 am

Image

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2764
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#5024 Post by ChillyPhilly » Fri Dec 11, 2020 11:28 am

For anyone interested.

Image
Our state, our city, our future.

All views expressed on this forum are my own.

Bacon
High Rise Poster!
Posts: 119
Joined: Tue Oct 15, 2013 1:17 pm

[U/C] Re: M2 North-South Motorway

#5025 Post by Bacon » Wed Dec 23, 2020 7:30 pm

Major works in early January 2021

In early January 2021, the overpass centre spans will be transported from the Polonia Reserve compound to their final location, over Regency Road, using Self Propelled Modular Transporters.

To allow for these works to occur safely and efficiently, from 5am Monday, January 4, 2021 until 5am Monday, January 11, 2021, weather permitting, there will be a partial closure of the South Road and Regency Road intersection. At completion of the overpass installation, the South Road and Regency Road intersection will reopen.

Dedicated public viewing areas will be positioned on the east and west sides of the intersection for stakeholders to view the major works. Please register your interest with the R2P Alliance via email or phone call if you wish to view the works with project personnel in attendance to explain the works and answer questions. There will be limited spaces and changes are subject to COVID-19 restrictions.

For details on the January works, including the changes to traffic, bus routes and work scope, please visit our web page: https://r2palliance.com.au/project/late ... works-2021.

Post Reply

Who is online

Users browsing this forum: Ahrefs [Bot] and 5 guests