Page 35 of 154

Posted: Mon Apr 09, 2007 3:05 pm
by Howie
Very nice pics UrbanSG ... muchos gratious :)

Posted: Mon Apr 09, 2007 3:15 pm
by rev
Wow, talk about getting things down quickly.
And I cant believe my eyes. You usually see one guy working at roadwork sites, and the rest standing around, but on this they all seem to be working.

Hm, I wonder how it will go with APEC again next week.

Posted: Tue Apr 10, 2007 12:42 am
by Norman
Some more (night) pics:

Looking West towards the Morphett Bridge
Image

Where the rail ends so far
Image

Another look down west
Image

Posted: Sat Apr 14, 2007 6:33 pm
by Will409
Progress update, 14/4/07.

Some MTT track has been found outside Adelaide Railway station and was dug up this morning. No rails but some circa 70 year old sleepers and concrete was found. Despite being under tarmac for 50 years after the last tram ran, the sleepers are in reasonable condition.

Oddly, the track isn't being laid from what has already been put in but instead is being laid from the King William Street intersection westwards. They were still digging up a section of the North Terrace while they were laying the track down as well so they could possibly be running a little behind schedule. Last week, track work was about 3 hours behind. Plenty of photographs were taken and will be uploaded soon.

Posted: Sat Apr 14, 2007 7:10 pm
by Pistol
I couldn't believe the speed of this work. When I walked into work last night at about 730, they were just closing the street. When I walked home from work this morning, the hole had been dug and preparation had commenced for tracks to be laid. Incredible!

Posted: Sat Apr 14, 2007 8:28 pm
by Will409
As promised, photos. I have decided to limit myself to 13 photos per post so I don't make everyone on slower interenet connections suffer.

Image
Old sleepers from the previous tramway system.

Image
Image
New conduits being laid infront of Adelaide railway station.

Image
Laying down sleepers infront of Parliment House.

Image
Sleepers laid upto King William Street.

Image
Image
Sleepers already laid infront of Parliment House and the Railway Station.

Image
Dragging rail along North Terrace.

Image
Dumping soil to form the track base.

Image
Image
Installing the rails.

Image
Work site from Morphett Street Bridge.

Image
Work site looking westwards.

Posted: Sun Apr 15, 2007 2:54 pm
by UrbanSG
Great pic updates Will409. Thanks for all the effort. Sure is comming along quickly.

Posted: Sun Apr 15, 2007 4:43 pm
by .::G!oRgOs::.
The speed of this project is great!

Posted: Sun Apr 15, 2007 7:41 pm
by Mants
friends of a friend got married at the stamford today. poor guys. i bet they weren't expecting the road to be half torn up!

Posted: Mon Apr 16, 2007 6:32 pm
by Will409
More pics from today with the completed track.

Image
New railway station stop site.

Image
Track laid on a concrete slab. The slab is from the underpass at the site.

Image
Different types of track fastening.

Image
New S bend at the King William Street intersection.

Image
Looking westwards from the intersection.

Image
From the Morphett Street Bridge.

Posted: Wed Apr 18, 2007 10:11 am
by shuza
Oh-oh-oh...... North Terrace is just fine! Trams make the whole boulevard even more classier.

Posted: Wed Apr 18, 2007 1:49 pm
by jk1237
Has anyone heard what weekends stages 3 and 4 will be done along King William St? If they continue at the rate their going it should be finished in no time

Posted: Wed Apr 18, 2007 2:07 pm
by Ben
jk1237 wrote:Has anyone heard what weekends stages 3 and 4 will be done along King William St? If they continue at the rate their going it should be finished in no time
From DTEI website:

King William Street and Victoria Square Road closures

The timing of stages 3 and 4 is currently being finalised with all construction works expected to be completed by August 2007 - more information about further road closures will be provided at a later date.

Posted: Wed Apr 18, 2007 4:31 pm
by Will409
Don't take this as gospel but I think I heard something about Stage 3 being done in mid May (probably from Friday 18th). However, I am not 100% certain about that date. I know it is in May though.

One thing I am certain on is the King William Street section will not be built in one hit as was originally planned so we could see upto about stage 5 of track work. The track gangs are going at a cracker of a pace but doing all of King William Street in one go would be an almost super human effort. Not only that but the amount required would be much longer then the usual 4 days a stage. At a guess, it would be North Terrace-Grenfell Street and then Grenfell Street-Franklin/Flinders Streets. The curve from North Terrace into King William Street was to be done in stage 2 but that has been re-scheduled to stage 3.

I'll keep you all updated when I can.

Posted: Wed Apr 18, 2007 5:27 pm
by bmw boy
i usually use the City free (99B) bus to get uni from king william street, which comes every 5 minutes... and i belive the new tram service will be replacing the city free buses (correct me if i'm wrong)

does any1 know how often the trams are expected to service the new area, because i cant see them comming every 5 minutes....