They probably won’t reinstate it until the surface roads have had their final surfacing done, finishing the surface roads.
[U/C] M2 North-South Motorway
[U/C] Re: M2 North-South Motorway
[U/C] Re: M2 North-South Motorway
According to a works notice https://r2palliance.com.au/assets/volum ... PROVED.pdf, right turns will be reinstated in early April.
- malyzajaczek
- Sen-Rookie-Sational
- Posts: 16
- Joined: Mon Feb 05, 2018 11:02 am
- Location: Adelaide
[U/C] Re: [U/C] Re: M2 North-South Motorway
Does anyone know any more details on the tunnel, depth of it, width, entry angles etc... How they going to do it, a open top excavation like the city bus tunnel or going deep with one of those huge mobile mountain tunnel drills ?ChillyPhilly wrote: ↑Mon Mar 08, 2021 12:30 amA render on the DIT website. The intersection is that of South Road/Henley Beach Road.
I heard that it might be deep drill and that they will not disturb much on top. If that's the case, it would have to be very deep.
When things get intense, just remember "We're bunch of hairless apes, flying through space on a living spaceship".
[U/C] Re: M2 North-South Motorway
Oh my god, for the umpteenth time, when they release the final detailed report you will know. It hasn't been released yet, nobody knows, it's still only in the later consultation / preliminary planning stages... Have some patience. People need to stop bumping threads like this.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
[U/C] Re: M2 North-South Motorway
Yeah we know very few details yet, but one thing we know for certain is that it will be dug out using tunneling machines. To dig out and cover again would shut down South Road for years (since the whole point of tunneling is to preserve surface structures that would need to be demolished for access if they were digging out and covering).
[U/C] Re: M2 North-South Motorway
The current focus is on the reference design, with the intention to publish by the end of the year for public review and a feedback window. Page seven of this doc which was published following the March community reference groups:
https://dit.sa.gov.au/__data/assets/pdf ... tation.pdf
And the minutes from the March community reference group, with a bit more explanation of the current works and how all the pieces will fit together:
https://dit.sa.gov.au/__data/assets/pdf ... _Tu....pdf
https://dit.sa.gov.au/__data/assets/pdf ... tation.pdf
And the minutes from the March community reference group, with a bit more explanation of the current works and how all the pieces will fit together:
https://dit.sa.gov.au/__data/assets/pdf ... _Tu....pdf
[U/C] Re: M2 North-South Motorway
Lower deck at Darlington, heading towards town is back to 60. Looks like they are looking at Sturt Road Bridge again.
-
- High Rise Poster!
- Posts: 299
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[U/C] Re: M2 North-South Motorway
I think they have been working on that small section of the concrete wall edge that broke away a few weeks ago. they've been on and off with the lane reduction and speed reduction for a while now.
-
- High Rise Poster!
- Posts: 299
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[U/C] Re: M2 North-South Motorway
is the R2P section operational on both the new motorway lanes and the local access lanes on the edges? I live south and rarely go out that way. cheers.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2764
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: [U/C] Re: M2 North-South Motorway
Permanently 60km?mawsonguy wrote:R2P is now signposted at 60 kph for its eentire length.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: [U/C] Re: M2 North-South Motorway
Presumably, at least until it eventually gets increased to 80km/h to match T2T.ChillyPhilly wrote: ↑Tue May 04, 2021 8:07 pmPermanently 60km?mawsonguy wrote:R2P is now signposted at 60 kph for its eentire length.
[U/C] Re: [U/C] Re: M2 North-South Motorway
They are temporary signs.ChillyPhilly wrote: ↑Tue May 04, 2021 8:07 pmPermanently 60km?mawsonguy wrote:R2P is now signposted at 60 kph for its eentire length.
[U/C] Re: M2 North-South Motorway
Both are open although there is still work being done on the local access roads.
Who is online
Users browsing this forum: No registered users and 1 guest