[U/C] Re: M2 North-South Motorway
Posted: Tue Mar 30, 2021 5:06 pm
by Spotto
Brucetiki wrote: ↑Tue Mar 30, 2021 11:16 am
I'm assuming now the bridge is (partially) opened they'll reinstate right hand turns at the South Rd/Regency Rd intersection shortly.
They probably won’t reinstate it until the surface roads have had their final surfacing done, finishing the surface roads.
[U/C] Re: M2 North-South Motorway
Posted: Tue Mar 30, 2021 6:33 pm
by PD2/20
Spotto wrote: ↑Tue Mar 30, 2021 5:06 pm
Brucetiki wrote: ↑Tue Mar 30, 2021 11:16 am
I'm assuming now the bridge is (partially) opened they'll reinstate right hand turns at the South Rd/Regency Rd intersection shortly.
They probably won’t reinstate it until the surface roads have had their final surfacing done, finishing the surface roads.
According to a works notice
https://r2palliance.com.au/assets/volum ... PROVED.pdf, right turns will be reinstated in early April.
[U/C] Re: M2 North-South Motorway
Posted: Tue Mar 30, 2021 11:21 pm
by NTRabbit
https://www.youtube.com/watch?v=g9tX8FSxqhw
Time lapse of the pedestrian bridge install
[U/C] Re: [U/C] Re: M2 North-South Motorway
Posted: Mon Apr 12, 2021 10:56 am
by malyzajaczek
ChillyPhilly wrote: ↑Mon Mar 08, 2021 12:30 am
A render on the DIT website. The intersection is that of South Road/Henley Beach Road.
Does anyone know any more details on the tunnel, depth of it, width, entry angles etc... How they going to do it, a open top excavation like the city bus tunnel or going deep with one of those huge mobile mountain tunnel drills ?
I heard that it might be deep drill and that they will not disturb much on top. If that's the case, it would have to be very deep.
[U/C] Re: M2 North-South Motorway
Posted: Mon Apr 12, 2021 12:22 pm
by [Shuz]
Oh my god, for the umpteenth time, when they release the final detailed report you will know. It hasn't been released yet, nobody knows, it's still only in the later consultation / preliminary planning stages... Have some patience. People need to stop bumping threads like this.
[U/C] Re: M2 North-South Motorway
Posted: Mon Apr 12, 2021 3:15 pm
by Nort
Yeah we know very few details yet, but one thing we know for certain is that it will be dug out using tunneling machines. To dig out and cover again would shut down South Road for years (since the whole point of tunneling is to preserve surface structures that would need to be demolished for access if they were digging out and covering).
[U/C] Re: M2 North-South Motorway
Posted: Mon Apr 12, 2021 4:22 pm
by Saltwater
The current focus is on the reference design, with the intention to publish by the end of the year for public review and a feedback window. Page seven of this doc which was published following the March community reference groups:
https://dit.sa.gov.au/__data/assets/pdf ... tation.pdf
And the minutes from the March community reference group, with a bit more explanation of the current works and how all the pieces will fit together:
https://dit.sa.gov.au/__data/assets/pdf ... _Tu....pdf
[U/C] Re: M2 North-South Motorway
Posted: Sat May 01, 2021 1:40 pm
by kymbosa
Lower deck at Darlington, heading towards town is back to 60. Looks like they are looking at Sturt Road Bridge again.
[U/C] Re: M2 North-South Motorway
Posted: Sat May 01, 2021 8:22 pm
by aceman
kymbosa wrote: ↑Sat May 01, 2021 1:40 pm
Lower deck at Darlington, heading towards town is back to 60. Looks like they are looking at Sturt Road Bridge again.
I think they have been working on that small section of the concrete wall edge that broke away a few weeks ago. they've been on and off with the lane reduction and speed reduction for a while now.
[U/C] Re: M2 North-South Motorway
Posted: Tue May 04, 2021 6:45 pm
by mawsonguy
R2P is now signposted at 60 kph for its eentire length.
[U/C] Re: M2 North-South Motorway
Posted: Tue May 04, 2021 7:59 pm
by aceman
is the R2P section operational on both the new motorway lanes and the local access lanes on the edges? I live south and rarely go out that way. cheers.
[U/C] Re: [U/C] Re: M2 North-South Motorway
Posted: Tue May 04, 2021 8:07 pm
by ChillyPhilly
mawsonguy wrote:R2P is now signposted at 60 kph for its eentire length.
Permanently 60km?
[U/C] Re: [U/C] Re: M2 North-South Motorway
Posted: Tue May 04, 2021 9:22 pm
by Spotto
ChillyPhilly wrote: ↑Tue May 04, 2021 8:07 pm
mawsonguy wrote:R2P is now signposted at 60 kph for its eentire length.
Permanently 60km?
Presumably, at least until it eventually gets increased to 80km/h to match T2T.
[U/C] Re: [U/C] Re: M2 North-South Motorway
Posted: Tue May 04, 2021 10:59 pm
by mawsonguy
ChillyPhilly wrote: ↑Tue May 04, 2021 8:07 pm
mawsonguy wrote:R2P is now signposted at 60 kph for its eentire length.
Permanently 60km?
They are temporary signs.
[U/C] Re: M2 North-South Motorway
Posted: Tue May 04, 2021 10:59 pm
by mawsonguy
aceman wrote: ↑Tue May 04, 2021 7:59 pm
is the R2P section operational on both the new motorway lanes and the local access lanes on the edges? I live south and rarely go out that way. cheers.
Both are open although there is still work being done on the local access roads.