[U/C] M2 North-South Motorway

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
rev
SA MVP (Most Valued Poster 4000+)
Posts: 6421
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#6316 Post by rev » Mon Oct 07, 2024 11:38 am

[Shuz] wrote:
Mon Oct 07, 2024 9:40 am
A smart forward thinking government would plan ahead and repurpose them for the following projects which will also require tunnelling;

- Underground CBD Rail
- Mount Barker Rail
- East West Link

Unfortunately we're in short supply of smart forward thinking politicians.
Apparently they can't be used for rail tunnels due to sizes according to someone else who posted earlier in the thread.
But it would be good for a change for a South Australian state government to get ahead of things, before they become a major problem, and get infrastructure built.
If they want a city of 2.2million people by 2050, they need to start planning and building pretty soon. Taking into consideration how slow they do things in SA, especially if there's a change in government.

mattblack
Legendary Member!
Posts: 1106
Joined: Fri Feb 15, 2008 11:20 am

[U/C] Re: M2 North-South Motorway

#6317 Post by mattblack » Mon Oct 07, 2024 11:40 am

[Shuz] wrote:
Mon Oct 07, 2024 11:20 am
mattblack wrote:
Mon Oct 07, 2024 10:07 am
Love to see the R1 ring road and short south added to that list.

Not sure how long these things last. Be boring continuously for 20+ yrs which would be fun.
Short South / East West Link are the same thing.
Thought u meant east west link through cbd.

User avatar
[Shuz]
Super Size Scraper Poster!
Posts: 3300
Joined: Sun Apr 10, 2011 5:26 pm

[U/C] Re: M2 North-South Motorway

#6318 Post by [Shuz] » Mon Oct 07, 2024 1:31 pm

RE: Rail.

In the case of Mount Barker rail tunnel, forward thinking would plan for 3 or more tracks, not just the default two - one for frieght, two for passenger. A large "road" TBM repurposed would accommodate for this size.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.

SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[U/C] Re: M2 North-South Motorway

#6319 Post by SBD » Mon Oct 07, 2024 3:14 pm

[Shuz] wrote:
Mon Oct 07, 2024 1:31 pm
RE: Rail.

In the case of Mount Barker rail tunnel, forward thinking would plan for 3 or more tracks, not just the default two - one for frieght, two for passenger. A large "road" TBM repurposed would accommodate for this size.
These TBMs are designed for the Torrens to Darlington project, which is likely digging in silt from the floodplains. I don’t know how much would be compatible to repurpose for hard rock drilling through the Adelaide Hills for Short South or a tunnel past Mount Barker. Short South needs several short tunnels and bridges so might be more suited to traditional mining like the Heysen Tunnels anyway rather than the setup space for a TBM.

User avatar
Spotto
Legendary Member!
Posts: 753
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: M2 North-South Motorway

#6320 Post by Spotto » Mon Oct 07, 2024 3:59 pm

mattblack wrote:
Mon Oct 07, 2024 10:07 am
Love to see the R1 ring road and short south added to that list.

Not sure how long these things last. Be boring continuously for 20+ yrs which would be fun.
IMO the R1 is too close to the CBD to warrant being a tunnelled route. A route that’s midway into the suburbs would be more usable for the entire city and keep congestion away from the CBD.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2764
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#6321 Post by ChillyPhilly » Mon Oct 07, 2024 4:13 pm

The TBMs won't be buried. They have a buyback clause.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2764
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#6322 Post by ChillyPhilly » Mon Oct 07, 2024 6:17 pm

From the T2D Facebook page:

There are several factors that affect whether a TBM will be re-used at the end of a project for a subsequent project. Various parts of TBMs do tend to suffer considerable wear in excavating and constructing any tunnel project and their useful remaining life may not be sufficient to make refurbishment and re-use worthwhile.

The TBMs to be used for T2D will be recovered when they have finished tunnel construction as they are subject to a “buy back” scheme from the TBM supplier.

Whether the TBMs get used again depends on the type of machine and the availability of a suitable similar project. For example, many of the TBMs used in the Sydney Metro tunnel projects in the last eight years have been re-used on the next project because they are the right size, and the ground conditions are very similar between projects.

#infrastructure #tunnelboringmachines #TBMs
Our state, our city, our future.

All views expressed on this forum are my own.

Saltwater
High Rise Poster!
Posts: 221
Joined: Wed May 30, 2018 3:07 pm
Location: Inner West

[U/C] Re: M2 North-South Motorway

#6323 Post by Saltwater » Tue Oct 08, 2024 10:20 am

Great news. Underground CBD rail link it is then.

NTRabbit
High Rise Poster!
Posts: 388
Joined: Fri Dec 28, 2018 10:00 pm

[U/C] Re: M2 North-South Motorway

#6324 Post by NTRabbit » Tue Oct 08, 2024 7:04 pm

EBG wrote:
Sat Oct 05, 2024 8:41 am
Stop planing and start digging . Adelaide most be the most overplaned and underdeveloped City in Australia.
Kinda funny given that (allegedly :wink: ) DPTI was renamed DIT because nobody who worked there could ever figure out what the P stood for :lol:

PD2/20
High Rise Poster!
Posts: 392
Joined: Sun Feb 23, 2014 2:32 pm

[U/C] Re: M2 North-South Motorway

#6325 Post by PD2/20 » Tue Oct 08, 2024 10:03 pm

NTRabbit wrote:
Tue Oct 08, 2024 7:04 pm
EBG wrote:
Sat Oct 05, 2024 8:41 am
Stop planing and start digging . Adelaide most be the most overplaned and underdeveloped City in Australia.
Kinda funny given that (allegedly :wink: ) DPTI was renamed DIT because nobody who worked there could ever figure out what the P stood for :lol:
In the Weatherill Government, John Rau, the Attorney General, was also Minister of Planning. In the Marshall Government, planning was lumped in with transport and infrastructure, only to be transferred to the DTI (Trade and Investment) in the present government.

EBG
Super Size Scraper Poster!
Posts: 3140
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: M2 North-South Motorway

#6326 Post by EBG » Thu Oct 10, 2024 3:49 pm

Arround the world about 95% of TBM's are removed and reused. They can be reubulit by using different cutting heads for clay/ sandy , rocky soils or solid rock . In the other 5% where there is absolutley no space on the surface to phyically recover them they simply just bore off course into a dead end chamber never to be seen again.

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6421
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#6327 Post by rev » Fri Oct 11, 2024 9:29 am

EBG wrote:
Thu Oct 10, 2024 3:49 pm
Arround the world about 95% of TBM's are removed and reused. They can be reubulit by using different cutting heads for clay/ sandy , rocky soils or solid rock . In the other 5% where there is absolutley no space on the surface to phyically recover them they simply just bore off course into a dead end chamber never to be seen again.
Can they be reused for larger tunnels by changing the heads and other components?

User avatar
SouthAussie94
Legendary Member!
Posts: 585
Joined: Tue Mar 27, 2012 10:03 pm
Location: Southern Suburbs

[U/C] Re: M2 North-South Motorway

#6328 Post by SouthAussie94 » Fri Oct 11, 2024 10:38 am

rev wrote:
Fri Oct 11, 2024 9:29 am
EBG wrote:
Thu Oct 10, 2024 3:49 pm
Arround the world about 95% of TBM's are removed and reused. They can be reubulit by using different cutting heads for clay/ sandy , rocky soils or solid rock . In the other 5% where there is absolutley no space on the surface to phyically recover them they simply just bore off course into a dead end chamber never to be seen again.
Can they be reused for larger tunnels by changing the heads and other components?
No.

This GIF offers a good visual of how a TBM works.
https://experience.acciona.com/media/2821/gif.gif

The TBM digs the tunnel and lines the walls with precast concrete segments at the same time. The diameter of the TBM would dictate the diameter of the tunnel.

Sure, you could hypothetically remove the TBM once the tunnel is complete, change the cutter head, and use it to dig another tunnel in a different location with different soil conditions, but this tunnel would be the same size as the first.

You can't dig a big tunnel with a small TBM and you can't dig a small tunnel with a big TBM.
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"

Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2764
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#6329 Post by ChillyPhilly » Mon Oct 14, 2024 12:09 pm

Jacobs joins Alliance for T2D project
Jacobs is excited to be part of the preferred Alliance for the landmark River Torrens to Darlington Project (T2D) Project in South Australia. This Alliance unites the global and local expertise of industry leaders John Holland, Bouygues Construction Australia, Jacobs, Arcadis, and Ventia. This partnership is dedicated to setting the benchmark for high-quality, sustainable, and transformative project delivery and ongoing road maintenance and operations.
Jacobs Vice President and General Manager Eva Wood said, "We are proud to be part of the Alliance ready to apply our local and global expertise and experience to the T2D Project and help advance Adelaide's transportation system for the future."
Our state, our city, our future.

All views expressed on this forum are my own.

SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[U/C] Re: M2 North-South Motorway

#6330 Post by SBD » Mon Oct 14, 2024 3:48 pm

ChillyPhilly wrote:
Mon Oct 14, 2024 12:09 pm
Jacobs joins Alliance for T2D project
Jacobs is excited to be part of the preferred Alliance for the landmark River Torrens to Darlington Project (T2D) Project in South Australia. This Alliance unites the global and local expertise of industry leaders John Holland, Bouygues Construction Australia, Jacobs, Arcadis, and Ventia. This partnership is dedicated to setting the benchmark for high-quality, sustainable, and transformative project delivery and ongoing road maintenance and operations.
Jacobs Vice President and General Manager Eva Wood said, "We are proud to be part of the Alliance ready to apply our local and global expertise and experience to the T2D Project and help advance Adelaide's transportation system for the future."
That's nice. What do they bring to the project? To me, Jacobs is the former abattoir and smallgoods manufacturer (including fritz) based at Mount Barker. The factory site now hosts Harvey Norman and similar economic drivers instead of food manufacturing.

Post Reply

Who is online

Users browsing this forum: No registered users and 2 guests