Page 6 of 19

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Mon Aug 01, 2016 10:34 pm
by Patrick_27
Ben wrote:I thought the hospital was having basement car parking? If it's not this will go up a lot quicker.
Not sure about a carpark, but there will definitely be a basement. On the part of the site that they're drilling in the pictures above. Any idea where the loading doc for the hospital will be?

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Mon Aug 01, 2016 11:00 pm
by mgb
From the plans there was three levels of underground carpark, so going to be a lot of soil removed. Not sure why they have levelled the block - maybe some part of the process to determine final levels for installing parameter piling?

Entrance to carpark will be from the old Bath Lane entrance. Loading dock entrance was up on the western side next to the SAPOL building

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Tue Aug 02, 2016 12:43 am
by how good is he
Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Tue Aug 02, 2016 2:17 pm
by Patrick_27
how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
Sounds about right, they are currently installing meshing for the concrete pylons on the eastern end of the block. They looked deep...

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Sun Aug 07, 2016 8:01 am
by Algernon
how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
car park opposite to what exactly?

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Sun Aug 07, 2016 1:08 pm
by Norman
Algernon wrote:
how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
car park opposite to what exactly?
Opposite the hospital, on the other side of Angas Street.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Sun Aug 14, 2016 10:50 pm
by EBG
A picture of the piling rig (14 Aug 16) . It is nearly 4 stories high compared to the 2 story building on the right hand side. They have bored a series of piles along the fence fronting onto Pulteny St. Sorry about the picture quality (too late in the day)

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Wed Aug 17, 2016 3:38 pm
by Patrick_27
Didn't have a chance to grab any pictures (wasn't really that exciting anyway), but they've levelled parking lot on the other side of Angus Street ready for the multi-level replacement.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Sat Aug 20, 2016 9:57 pm
by EBG
Here is a picture of the car park site mentioned by Patrick_27 . It is just behind the on the run service station on Angus St. There are several work sheds on the footpath and the existing bitumen serface has been cleared so it looks like serious work is about to start.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Sun Aug 21, 2016 12:36 pm
by Dvious
I wonder if this site will also have a crane, i would assume so at 8 levels?

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Sun Sep 25, 2016 11:24 pm
by EBG
Piling was taking place along the edge of Angas St on Saturday 24/9/16.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Thu Oct 06, 2016 11:21 pm
by EBG
Yes there is a basement, they are excavating on the north (western) side.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Fri Oct 07, 2016 10:54 pm
by monotonehell
EBG wrote:Yes there is a swimming pool, they are excavating on the north (western) side.
Fixed it for you.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Sun Oct 16, 2016 9:41 pm
by EBG
A partial basement with sloping floor has been dug over the southern part of the car park site opposite the hospital site. Meanwhile the hospital basement swimming pool is filling quite well thanks to the recent rain. Picture from Princess Street 16 Oct 16.

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

Posted: Mon Oct 31, 2016 11:01 pm
by EBG
Update as at 30 Oct 16. A lot of work has been done on digging out the basement. Picture looking north west to rear of fire station.