work is progressing on digging out the first basement level there will be 3 basements. the orange pipe like structures are temporary side wall braces. Pictures 9/7/2022.
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Basement down to around level 4 on NW corner
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Some more pictures of the basement exclamations from last weekend
-
- Legendary Member!
- Posts: 870
- Joined: Sun Jul 15, 2007 5:51 pm
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Crane probably not too far off now.
Sent from my SM-A515F using Tapatalk
Sent from my SM-A515F using Tapatalk
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
I had a brief conversation a few months ago with the builder - I recall he said the concrete boom would go in first? Hopefully something installed by Christmas
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
The basement car part is around 2/3 excavated - then the foundation and lift well base to go. There seem to be some builders on site now (not just the Royal Park Salvage team).
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Yes nearly at full depth. picture 22/9/2022.from south western corner looking east.
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Lots happening today on site.
The smaller excavators have been lifted out from the site and a truckload of piling cages delivered, for the central area of the basement. There is about a meter of excavation to go before the platform is installed and structural work can commence.
The crane is apparently a couple of months away, until they get the basement well underway. I recall them saying a concrete pump would be installed first.
The smaller excavators have been lifted out from the site and a truckload of piling cages delivered, for the central area of the basement. There is about a meter of excavation to go before the platform is installed and structural work can commence.
The crane is apparently a couple of months away, until they get the basement well underway. I recall them saying a concrete pump would be installed first.
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Always difficult to get a shot of this one when the site is not open.
Looks like the basement excavation has finished and the building platform being installed on the western side - still lots of basement material to be lifted out.
Looks like the basement excavation has finished and the building platform being installed on the western side - still lots of basement material to be lifted out.
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Thia ia such a hard site to get a photo of because of the surrounding covering.
Looks like a crane base. Or maybe a concrete pump base?
Looks like a crane base. Or maybe a concrete pump base?
[U/C] Re: 181 Waymouth Street | 53m | 17 Levels | Apartments
Thia ia such a hard site to get a photo of because of the surrounding covering.
Looks like a crane base. Or maybe a concrete pump base?
Looks like a crane base. Or maybe a concrete pump base?