[COM] 89-109 Gray Street | 59m | 17 Levels | Student Accom
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
There seems to be a lot of activity using a vertical steel "template" that is moved from foundation area to area. It is on the RHS in one photo. I guess it is setting the levels so that the steelwork can be installed vertically from each foundation base. The lift cores look to be ready to rise and I am assuming that things will progress visibly when the multi storey steel frame starts to be delivered. A couple of photos from yesterday evening
- Attachments
-
- Gray 2 (1).JPG (1.46 MiB) Viewed 37559 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
The southern lift core
- Attachments
-
- Gray 2 (2).JPG (2.67 MiB) Viewed 37556 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
No mucking around here. This is from Wednesday night. Sorry for the poor quality.
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Both the service cores have had one rise off the ground and now have "Synergy" signage. The southern 1/2 of the actual ground floor is formed up ready to be concreted.
- Attachments
-
- 20180311_gray st.jpg (181.49 KiB) Viewed 37180 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
They worked every day on the long weekend
- Attachments
-
- Gray 2 (1).JPG (3.31 MiB) Viewed 36970 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
will make a big impact on this side of town
- Attachments
-
- Gray 2 (2).JPG (2.94 MiB) Viewed 36969 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Concrete being pumped today for the foundation / slab. This should move quickly once the steel framework starts getting delivered and installed
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Yes this will go up very quickly as it's using the Fielders Slimdek system which means minimal/no formwork propping (same system used on 115 KWS).
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
I am betting this will be topped out within 6-8 months.
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
I think you are right - they are still talking January. The steelwork started this weekend and will be pretty fast from now on. A few shots from this morning.
Along Gray street
Along Gray street
- Attachments
-
- S 2.JPG (2.98 MiB) Viewed 36558 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Southern end
- Attachments
-
- S 1.JPG (2.38 MiB) Viewed 36554 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
From Kings Court
- Attachments
-
- S 3.JPG (2.33 MiB) Viewed 36551 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
Another picture of the steel work. Notice the red hand rails already attached. it is a lot easier to attach them while the beam is on the ground before it is lifted into place.
- Attachments
-
- 20180324_gray st 1.jpg (263.68 KiB) Viewed 36516 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
From last night
- Attachments
-
- night.JPG (1.47 MiB) Viewed 36269 times
[COM] Re: 89-109 Gray Street | 59m | 17 Levels | Student Accom
There was lots of activity today as the northern 1/2 of the ground floor Slab was being poured today.
- Attachments
-
- 20180410_gray st.jpg (316.77 KiB) Viewed 36041 times