Is there going to be a south bound exit from the Port River Expressway onto the Superway, when this is complete? This would be the quickest way for anyone from the LeFevre Peninsula to get to the CBD and beyond including freight , theres a lot of industry up that way and having trucks avoid Grand Junction and Port Road is needed.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2780
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: [U/C] Re: Northern Connector | 14km | $1b
Sure will be.TorrensSA wrote:Is there going to be a south bound exit from the Port River Expressway onto the Superway, when this is complete? This would be the quickest way for anyone from the LeFevre Peninsula to get to the CBD and beyond including freight , theres a lot of industry up that way and having trucks avoid Grand Junction and Port Road is needed.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[COM] Re: [U/C] Re: Northern Connector | 14km | $1b
Part of the eventual PWR->superway ramp was used as the interim superway->Salisbury ramp when the new bridge over PWR was opened before the final ramp/bridge replaced it. It looks like it might open at the same time as the traffic switch to the final eastbound carriageway, as it branches from that.ChillyPhilly wrote: ↑Sat Jan 11, 2020 5:37 pmSure will be.TorrensSA wrote:Is there going to be a south bound exit from the Port River Expressway onto the Superway, when this is complete? This would be the quickest way for anyone from the LeFevre Peninsula to get to the CBD and beyond including freight , theres a lot of industry up that way and having trucks avoid Grand Junction and Port Road is needed.
[COM] Re: Northern Connector | 14km | $1b
Good its included, this is Adelaide after all and that connection is not cheap, its important but expensive. Adelaide is known for stupid decisions like the one way expressway lol. Now all we need is to finish the North - South motorway and build a connection to the SE Freeway.
-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[COM] Re: Northern Connector | 14km | $1b
Yes I agree.. and in 10-15 years & with 10-15 billion it should be all done.
Last edited by how good is he on Sun Jan 12, 2020 12:21 am, edited 1 time in total.
[COM] Re: Northern Connector | 14km | $1b
Looks like the next traffic switch will take place over the next week. When the Superway reopens the Port River Expressway closes for a week or so. I’m assuming this is so the expressway can be realigned.
[COM] Re: Northern Connector | 14km | $1b
Notice dated 2 January 2020 has been published in the SA Government Gazette under the Geographical Names Act assigning the following names to their respective features along the Northern Connector;
Any idea of the significance of these names?
- HARRY TAYLOR WARRITJA BRIDGE to the bridge at the Bolivar Interchange
- KAWANTA WAMA BRIDGE to the bridge at the Waterloo Corner Interchange
- TAPA MARTINTHI YALA to the shared-use path adjacent to the Northern Connector
Any idea of the significance of these names?
[COM] Re: Northern Connector | 14km | $1b
Tapa is the Kaurna word for path. Tapa Pariara is the name of the path along the rivers in Gawler. https://www.walkingsa.org.au/walk/find- ... iara-path/mawsonguy wrote: ↑Mon Jan 13, 2020 7:56 pmNotice dated 2 January 2020 has been published in the SA Government Gazette under the Geographical Names Act assigning the following names to their respective features along the Northern Connector;
- HARRY TAYLOR WARRITJA BRIDGE to the bridge at the Bolivar Interchange
- KAWANTA WAMA BRIDGE to the bridge at the Waterloo Corner Interchange
The intention was previously announced but this makes it official.
- TAPA MARTINTHI YALA to the shared-use path adjacent to the Northern Connector
Any idea of the significance of these names?
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2780
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Northern Connector | 14km | $1b
Northbound elevated Motorway has been resurfaced, and is now consistently three lanes from Regency Road to the Southern Interchange. The emergency stopping lane around the on-ramp from Grand Junction Road has been removed to enable this.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
-
- High Rise Poster!
- Posts: 299
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[COM] Re: Northern Connector | 14km | $1b
I could never understand why it went from 3 to 2 suddenly the way it didChillyPhilly wrote: ↑Tue Jan 14, 2020 12:42 amNorthbound elevated Motorway has been resurfaced, and is now consistently three lanes from Regency Road to the Southern Interchange. The emergency stopping lane around the on-ramp from Grand Junction Road has been removed to enable this.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2780
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Northern Connector | 14km | $1b
Agreed, but it seems to be a common thing across SA projects. The southern end of T2T is like this as well.aceman wrote: ↑Tue Jan 14, 2020 1:54 amI could never understand why it went from 3 to 2 suddenly the way it didChillyPhilly wrote: ↑Tue Jan 14, 2020 12:42 amNorthbound elevated Motorway has been resurfaced, and is now consistently three lanes from Regency Road to the Southern Interchange. The emergency stopping lane around the on-ramp from Grand Junction Road has been removed to enable this.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
Because 3lanes of the superway + 2 additional lanes from the grand junction onramp = 5 lanes merging into 2 lanes to go over prexy bridge in a very short distance. It must have been deemed safer to choke the superway to 2 lanes, so there were only 4 lanes merging into 2. I always expected that when the NC was completed that it would be changed to 3 continuous lanes, I'm glad that this has been doneaceman wrote: ↑Tue Jan 14, 2020 1:54 amI could never understand why it went from 3 to 2 suddenly the way it didChillyPhilly wrote: ↑Tue Jan 14, 2020 12:42 amNorthbound elevated Motorway has been resurfaced, and is now consistently three lanes from Regency Road to the Southern Interchange. The emergency stopping lane around the on-ramp from Grand Junction Road has been removed to enable this.
[COM] Re: Northern Connector | 14km | $1b
I must admit, as silly as it was having 3 merge into 2 there, I don't recall ever seeing any build up of traffic as a result of it. Nonetheless, it's great that it's now 3 lanes all the way through, which makes sense as the road evolves into it's upcoming new set up.aaronjameslange wrote: ↑Tue Jan 14, 2020 9:48 amBecause 3lanes of the superway + 2 additional lanes from the grand junction onramp = 5 lanes merging into 2 lanes to go over prexy bridge in a very short distance. It must have been deemed safer to choke the superway to 2 lanes, so there were only 4 lanes merging into 2. I always expected that when the NC was completed that it would be changed to 3 continuous lanes, I'm glad that this has been doneaceman wrote: ↑Tue Jan 14, 2020 1:54 amI could never understand why it went from 3 to 2 suddenly the way it didChillyPhilly wrote: ↑Tue Jan 14, 2020 12:42 amNorthbound elevated Motorway has been resurfaced, and is now consistently three lanes from Regency Road to the Southern Interchange. The emergency stopping lane around the on-ramp from Grand Junction Road has been removed to enable this.
[COM] Re: Northern Connector | 14km | $1b
New 90 speed limit sign on Port Wakefield Road on southbound side between Waterloo Corner Road and Bolivar Road
[COM] Re: Northern Connector | 14km | $1b
Traffic was tame enough this morning to utilise the southbound lanes of the Superway this morning.
The on-ramp from Salisbury Highway will eventually be reduced to one lane (it's temporarily set up for 2 lanes for now until the northern connector opens), with the lane form Salisbury Highway providing a 4th lane on the Superway until the Grand Junction Rd exit.
So it looks the 3 lanes from the Northern Connector will connect seemlessly with 3 lanes on the Superway without the need to merge.
The on-ramp from Salisbury Highway will eventually be reduced to one lane (it's temporarily set up for 2 lanes for now until the northern connector opens), with the lane form Salisbury Highway providing a 4th lane on the Superway until the Grand Junction Rd exit.
So it looks the 3 lanes from the Northern Connector will connect seemlessly with 3 lanes on the Superway without the need to merge.