I’m not sure what you mean by thisEurostar wrote:I am predicting SA Labor at the 2022 State Election will propose a Salisbury West Rail Bypass via Bolivar as this will make any grade separations of the Gawler Line easier and might score votes
[COM] M2 Northern Connector | 15.5km | $867m
[COM] Re: Northern Connector | 14km | $1b
[COM] Re: Northern Connector | 14km | $1b
The original Northern Connector proposal included a railway in the median which will divert freight trains away from the Salisbury Town Centre area
[COM] Re: Northern Connector | 14km | $1b
[/quote]
The original Northern Connector proposal included a railway in the median which will divert freight trains away from the Salisbury Town Centre area[/quote]
Oh yes. Why was this scrapped in the first place? I read about the reason for changing from in the median to on the western side of the corridor but couldn’t find why it was removed from the project.
The original Northern Connector proposal included a railway in the median which will divert freight trains away from the Salisbury Town Centre area[/quote]
Oh yes. Why was this scrapped in the first place? I read about the reason for changing from in the median to on the western side of the corridor but couldn’t find why it was removed from the project.
[COM] Re: Northern Connector | 14km | $1b
It was never removed, but just not part of the funding for the project. Provision has-been made to allow construction of the project later on when funding becomes available.mrumley02 wrote: ↑Wed Jan 29, 2020 12:28 pmOh yes. Why was this scrapped in the first place? I read about the reason for changing from in the median to on the western side of the corridor but couldn’t find why it was removed from the project.The original Northern Connector proposal included a railway in the median which will divert freight trains away from the Salisbury Town Centre area
[COM] Re: Northern Connector | 14km | $1b
Isn't that just the original Northern Connector rail component?
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2744
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Northern Connector | 14km | $1b
The rail component of the NC was proposed to branch off from the Gawler Line around Dry Creek and cross Salisbury Highway around Magazine Road before joining the Northern Connector alignment. In the original plan, it was to run down the median but this was revised to run alongside the road. A reserve has been included in the project at least.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
https://www.dpti.sa.gov.au/__data/asset ... g_2019.JPGNorman wrote: ↑Wed Jan 29, 2020 12:30 pmIt was never removed, but just not part of the funding for the project. Provision has-been made to allow construction of the project later on when funding becomes available.mrumley02 wrote: ↑Wed Jan 29, 2020 12:28 pmOh yes. Why was this scrapped in the first place? I read about the reason for changing from in the median to on the western side of the corridor but couldn’t find why it was removed from the project.The original Northern Connector proposal included a railway in the median which will divert freight trains away from the Salisbury Town Centre area
https://www.dpti.sa.gov.au/__data/asset ... p_2019.JPG
https://www.dpti.sa.gov.au/__data/asset ... p_2019.JPG
So where is the rail going?
[COM] Re: Northern Connector | 14km | $1b
The rail is going to the west of the freeway
Sent from my Pixel 4 XL using Tapatalk
Sent from my Pixel 4 XL using Tapatalk
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[COM] Re: Northern Connector | 14km | $1b
Then why have the northbound carriageway through the north most bridge span at the northern interchange, while leaving the centre span unused and useless? Way too much of the current project would have to be reworked to ever build the rail component.
[COM] Re: Northern Connector | 14km | $1b
I wondered that too, but there have been so many temporary roads built through interchanges to keep traffic flowing during construction, that there might not be that much extra rework that wouldn't have been required anyway.aaronjameslange wrote: ↑Thu Jan 30, 2020 1:55 pmThen why have the northbound carriageway through the north most bridge span at the northern interchange, while leaving the centre span unused and useless? Way too much of the current project would have to be reworked to ever build the rail component.
The left turn on to the Northern Expressway would need to be changed to get the train under it, and the Waterloo Corner interchange adjusted I think, but bridges are expensive to maintain, so it could be that the rework will actually be cheaper than building and maintaining an unused bridge for the time until the line is needed.
[COM] Re: Northern Connector | 14km | $1b
Can we all just vent for a minute that there is no northbound PWR to NEXY ramp?
It’s an obvious need and not that much work, requiring only a trumpet interchange. This also could have been used as the temporary on-ramp during construction that they’re about to remove.
It’s just silly
It’s an obvious need and not that much work, requiring only a trumpet interchange. This also could have been used as the temporary on-ramp during construction that they’re about to remove.
It’s just silly
[COM] Re: Northern Connector | 14km | $1b
You have to get on at Waterloo Corner Road, does the Bolivar interchange have a northbound ramp? In the video on the Northern Connector site it doesn't look like it does.
[COM] Re: Northern Connector | 14km | $1b
Yes it does. It was a late addition.TorrensSA wrote:You have to get on at Waterloo Corner Road, does the Bolivar interchange have a northbound ramp? In the video on the Northern Connector site it doesn't look like it does.
But getting on at Waterloo Cnr Rd is not going to be acceptable for huge B-doubles and triples. That roundabout is just too tight.
[COM] Re: Northern Connector | 14km | $1b
The Bolivar on-ramp looks to be a gentle, downhill curve, so ideal for big trucks, and I think the left turn from PWR on to the bridge will be smooth enough once all the barriers are removed. This will only be for trucks from the Cavan to Burton area. Others will enter from the southern end I expect, from the PRExy or Grand Junction Road entrances.mrumley02 wrote: ↑Thu Jan 30, 2020 3:59 pmYes it does. It was a late addition.TorrensSA wrote:You have to get on at Waterloo Corner Road, does the Bolivar interchange have a northbound ramp? In the video on the Northern Connector site it doesn't look like it does.
But getting on at Waterloo Cnr Rd is not going to be acceptable for huge B-doubles and triples. That roundabout is just too tight.
It seems odd that the Waterloo Corner roundabout would have been built too tight, since there will likely be traffic coming from Burton, Direk, Edinburgh area too. At the moment, they are only allowed southbound on Heaslip Road. Is teh WAterloo Corner Interchange roundabout actually any tighter for B-doubles/road trains than the Heaslip Road/Waterloo Corner Road one? They turn right from Heaslip to WCR there.
[COM] Re: Northern Connector | 14km | $1b
It’s the idea that northbound traffic has to head south to go north. It seems silly, particularly when there has always been that ramp and it would not be difficult to adjust it.SBD wrote:The Bolivar on-ramp looks to be a gentle, downhill curve, so ideal for big trucks, and I think the left turn from PWR on to the bridge will be smooth enough once all the barriers are removed. This will only be for trucks from the Cavan to Burton area. Others will enter from the southern end I expect, from the PRExy or Grand Junction Road entrances.mrumley02 wrote: ↑Thu Jan 30, 2020 3:59 pmYes it does. It was a late addition.TorrensSA wrote:You have to get on at Waterloo Corner Road, does the Bolivar interchange have a northbound ramp? In the video on the Northern Connector site it doesn't look like it does.
But getting on at Waterloo Cnr Rd is not going to be acceptable for huge B-doubles and triples. That roundabout is just too tight.
It seems odd that the Waterloo Corner roundabout would have been built too tight, since there will likely be traffic coming from Burton, Direk, Edinburgh area too. At the moment, they are only allowed southbound on Heaslip Road. Is teh WAterloo Corner Interchange roundabout actually any tighter for B-doubles/road trains than the Heaslip Road/Waterloo Corner Road one? They turn right from Heaslip to WCR there.
The PWR to Bolivar Interchange left is looking a little sharp.
As for the roundabout at WCR, it’s a smidge tighter than the current NEXY interchange roundabouts - possible, but will slow traffic.
Who is online
Users browsing this forum: Google [Bot] and 10 guests