[U/C] M2 North-South Motorway
-
- High Rise Poster!
- Posts: 301
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[U/C] Re: North-South Motorway
quick update for those of us that don't travel north of the city, regarding the pym st to superway section, between pym st and Regency road on both the eastern and western sides most properties have now been fenced off awaiting demolition. a few have already been demoed. does anyone know if there is a timeline for construction of this section?
-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[U/C] Re: North-South Motorway
Demo’s will continue all this year (ie Croydon Kings soccer club has until the end of their season before they need to vacate). I think construction is from early 2020 and take until the end of 2022 for completion. The main job is the overpass. It will be interesting if they assemble a bridge/overpass on-site and move it into place to save time (as they did at Darlington).
-
- High Rise Poster!
- Posts: 301
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[U/C] Re: North-South Motorway
thanks mate, yeah the Regency overpass will be interesting to see how it's done now that we've seen the way they were done at Darlington. having said that this section seems quite small compared to what's been done so far!
-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[U/C] Re: North-South Motorway
I agree.. why 3 years to do just 1.8km and at a cost of $354m .. something seems wrong .... I know there is an overpass but this averages $2m per metre.
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[U/C] Re: North-South Motorway
Im surprised at how quickly properties are being demolished. The t2t section seemed like only a couple of properties per month were being pulled down. At a guess id say close to half the properties along r2p are already either demolished or vacated.how good is he wrote: ↑Wed Jun 05, 2019 8:11 pmDemo’s will continue all this year (ie Croydon Kings soccer club has until the end of their season before they need to vacate). I think construction is from early 2020 and take until the end of 2022 for completion. The main job is the overpass. It will be interesting if they assemble a bridge/overpass on-site and move it into place to save time (as they did at Darlington).
Also noticed a new soccer pitch and stand being built further north on churchill road. Not sure if that has anything to do with croydon kings.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2849
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: [U/C] Re: North-South Motorway
At the former site of Kilburn Primary School? That would be the home ground for West Adelaide.aaronjameslange wrote:Im surprised at how quickly properties are being demolished. The t2t section seemed like only a couple of properties per month were being pulled down. At a guess id say close to half the properties along r2p are already either demolished or vacated.how good is he wrote: ↑Wed Jun 05, 2019 8:11 pmDemo’s will continue all this year (ie Croydon Kings soccer club has until the end of their season before they need to vacate). I think construction is from early 2020 and take until the end of 2022 for completion. The main job is the overpass. It will be interesting if they assemble a bridge/overpass on-site and move it into place to save time (as they did at Darlington).
Also noticed a new soccer pitch and stand being built further north on churchill road. Not sure if that has anything to do with croydon kings.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: North-South Motorway
I wonder if theyll use the precast yard on south road that they used for the Superway, to male sections for the regency overpass.aaronjameslange wrote: ↑Thu Jun 06, 2019 11:43 amIm surprised at how quickly properties are being demolished. The t2t section seemed like only a couple of properties per month were being pulled down. At a guess id say close to half the properties along r2p are already either demolished or vacated.how good is he wrote: ↑Wed Jun 05, 2019 8:11 pmDemo’s will continue all this year (ie Croydon Kings soccer club has until the end of their season before they need to vacate). I think construction is from early 2020 and take until the end of 2022 for completion. The main job is the overpass. It will be interesting if they assemble a bridge/overpass on-site and move it into place to save time (as they did at Darlington).
Also noticed a new soccer pitch and stand being built further north on churchill road. Not sure if that has anything to do with croydon kings.
[U/C] Re: North-South Motorway
Maybe not that particular yard, but I would consider it likely that pre-cast beams would be brought to the site to minimise closure times during construction for Regency Road.rev wrote: ↑Thu Jun 06, 2019 2:07 pmI wonder if theyll use the precast yard on south road that they used for the Superway, to male sections for the regency overpass.aaronjameslange wrote: ↑Thu Jun 06, 2019 11:43 amIm surprised at how quickly properties are being demolished. The t2t section seemed like only a couple of properties per month were being pulled down. At a guess id say close to half the properties along r2p are already either demolished or vacated.how good is he wrote: ↑Wed Jun 05, 2019 8:11 pmDemo’s will continue all this year (ie Croydon Kings soccer club has until the end of their season before they need to vacate). I think construction is from early 2020 and take until the end of 2022 for completion. The main job is the overpass. It will be interesting if they assemble a bridge/overpass on-site and move it into place to save time (as they did at Darlington).
Also noticed a new soccer pitch and stand being built further north on churchill road. Not sure if that has anything to do with croydon kings.
[U/C] Re: North-South Motorway
I would say South road would be widened to the point that they just start building the overpass in the middlehow good is he wrote: ↑Wed Jun 05, 2019 8:11 pmDemo’s will continue all this year (ie Croydon Kings soccer club has until the end of their season before they need to vacate). I think construction is from early 2020 and take until the end of 2022 for completion. The main job is the overpass. It will be interesting if they assemble a bridge/overpass on-site and move it into place to save time (as they did at Darlington).
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2849
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: North-South Motorway
I thought that, based on the draft plan of R2P, Croydon would remain where they were, but that their pitch would be rotated slightly.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: North-South Motorway
That is my understanding too, but I guess that "rotating" a pitch is functionally the same as destroying it and making a new one somewhere else (even if they overlap), which can't be done without disrupting the season.ChillyPhilly wrote: ↑Thu Jun 06, 2019 6:07 pmI thought that, based on the draft plan of R2P, Croydon would remain where they were, but that their pitch would be rotated slightly.
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2849
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: North-South Motorway
That's why major works won't begin until August at the earliest - times up well with the end of the NPL season.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: North-South Motorway
Looking at the animation video from Dec 2018, they might be avoiding the sports grounds almost entirely by sacrificing only the nature strip.ChillyPhilly wrote: ↑Thu Jun 06, 2019 6:07 pmI thought that, based on the draft plan of R2P, Croydon would remain where they were, but that their pitch would be rotated slightly.
Using the video, I've roughly approximated the R2P corridor boundary with yellow lines and I've included a cap of the sports grounds from the video. Orange square is the current park (highlighted half to become nature strip) immediately south of the sports grounds, red shapes are other nature strip areas.


-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[U/C] Re: North-South Motorway
They may take over the Soccer club & ovals to put their site offices, workers carpark, equipment/machinery etc?
[U/C] Re: North-South Motorway
Will 230/232 bus routes have to change route?
To arndale via
1) Torrens Road, South Road, Regency Road
2) Torrens Road, Days Road, Regency Road
Or have 251~254 run via
1) Hawker Street, South Road, Regency Road
With the 230,232 running direct via Torrens Road
To arndale via
1) Torrens Road, South Road, Regency Road
2) Torrens Road, Days Road, Regency Road
Or have 251~254 run via
1) Hawker Street, South Road, Regency Road
With the 230,232 running direct via Torrens Road
Who is online