It’s so all bridges look the same. I thought the same as you mate, it doesn’t require it but thanks to a few idiots who thought they would throw rocks for fun have killed any idea of it staying the way it is.aaronjameslange wrote: ↑Sat Oct 05, 2019 9:14 amDont see why the bridge would need throw screens as it is not designed for pedestrian access. Yes you could lob an apple core from a moving vehicle, but you can do that on any road anywhere at anytime.
[U/C] M2 North-South Motorway
[U/C] Re: North-South Motorway
-
- Legendary Member!
- Posts: 1233
- Joined: Thu Jan 24, 2013 1:26 am
[U/C] Re: North-South Motorway
Anyone know if over Regency Rd will it be a bridge built near the site and moved into place like Darlington or an overpass just built in the place it is intended, like the Motorway?
[U/C] Re: North-South Motorway
At the recent R2P industry briefing session, McDow reported that they will build nearby and move into place.
[U/C] Re: North-South Motorway
The screens they've put up around the Torrens/South Road intersection/bridge and so on.. why couldn't they have had them powder-coated in the same colour as the brown poles that they screwed them on to instead of plain old silver? Would have looked much better as opposed to the after thought they look like now.
- Llessur2002
- Super Size Scraper Poster!
- Posts: 2130
- Joined: Mon Mar 17, 2014 4:59 pm
- Location: Inner West
[U/C] Re: North-South Motorway
Presumably that was the condition they were in when they were shipped in from Christmas Island.rev wrote: ↑Fri Oct 11, 2019 10:51 amThe screens they've put up around the Torrens/South Road intersection/bridge and so on.. why couldn't they have had them powder-coated in the same colour as the brown poles that they screwed them on to instead of plain old silver? Would have looked much better as opposed to the after thought they look like now.
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[U/C] Re: North-South Motorway
R2P section. All the trees on the regency tafe and coopers brewery site have been removed, excavators are moving the mound of dirt from the coopers site. Site compound being built opposite polonia soccer club
- ginzahikari
- Gold-Member ;)
- Posts: 69
- Joined: Wed Jul 04, 2018 9:31 am
- Location: Marion
[U/C] Re: North-South Motorway
Good Morning all
I've uploaded a progress video for the Darlington Interchange upgrade, including the new Lowered Motorway section and the Ayliffes Road bridge.
You can watch it here: https://www.youtube.com/watch?v=KeXA-lkr2sY
Any feedback is appreciated!
I've uploaded a progress video for the Darlington Interchange upgrade, including the new Lowered Motorway section and the Ayliffes Road bridge.
You can watch it here: https://www.youtube.com/watch?v=KeXA-lkr2sY
Any feedback is appreciated!
-
- High Rise Poster!
- Posts: 299
- Joined: Sat Mar 11, 2006 1:02 am
- Location: Adelaide (Hallett Cove)
[U/C] Re: North-South Motorway
well put together norman well done. can I suggest that when u add in the text boxes is it possible to slow the speed of the video right down so there's time to have a proper look? a couple of times I found myself having to pause and rewind
much appreciated mate thank u
much appreciated mate thank u
- Mr Smith
- High Rise Poster!
- Posts: 146
- Joined: Fri May 18, 2012 4:41 pm
- Location: Parkside Lunatic Asylum
[U/C] Re: North-South Motorway
Yes brilliant Norman. Agreed with comments of Ace.aceman wrote: ↑Sat Oct 19, 2019 8:49 pmwell put together norman well done. can I suggest that when u add in the text boxes is it possible to slow the speed of the video right down so there's time to have a proper look? a couple of times I found myself having to pause and rewind
much appreciated mate thank u
[U/C] Re: North-South Motorway
Looks like gantry foundation works to replace the old lane designator at the Marion Road offramp, and also where the current Marion Road AD exit sign is.ginzahikari wrote: ↑Sat Oct 12, 2019 6:33 pmNew overhead speed limit signs on the Southern Expwy northbound.
[U/C] Re: North-South Motorway
This Saturday (2/11) is when the lower section in front Tonsley opens. This now takes traffic under all the major intersections driving on South Road.
It’s now 90% completed.
It’s now 90% completed.
Who is online
Users browsing this forum: Google [Bot] and 3 guests