[U/C] 210 Greenhill Road, Eastwood | ~24m | 7 Levels
[U/C] 210 Greenhill Road, Eastwood | ~24m | 7 Levels
Going before DAc this Thursday. Looks to be a headquarters for Bridgestone.
https://www.saplanningcommission.sa.gov ... hments.pdf
https://www.saplanningcommission.sa.gov ... hments.pdf
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
Very thankful for the required changes on this one, particularly setbacks (they proposed none!) and the retention of the council trees. Greenhill Road does not need to look industrial. It's not a bad development otherwise.
- Nathan
- Super Size Scraper Poster!
- Posts: 3827
- Joined: Tue Feb 03, 2009 1:09 pm
- Location: Bowden
- Contact:
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
5 levels of car parking for 3 levels of office space?
(meanwhile, it has less than half the minimum required bicycle spaces – just 12 for the entire building)
(meanwhile, it has less than half the minimum required bicycle spaces – just 12 for the entire building)
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
The car parking rates were provided in accordance with the minimum and maximum sought by the Development Plan.
The SCAP granted DPC to this at its hearing yesterday.
The SCAP granted DPC to this at its hearing yesterday.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
Demolition in progress even as I post. getting ready to start work on level 8 building. Click on picture for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
One week later and the demolition is nearly complete. At the bottom of the picture is the frame work of the old car park car ports. Note they have saved the trees at the front of the site. Click on picture for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
Not wasting any time on this project, piling has commenced. During the past week a series of piles were bored up against the existing building (Medibank Building) on left hand side of picture. Click on picture for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
2/2/2020 piling has been completed on all side of the site and now a piling cap is been placed around the boundary.
Click on pictures for bigger.
Click on pictures for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
Having set up a piled retaining wall all around the boundary, they are now excavating the basement. I will try to get a picture soon.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
29/2/2020 Picture of the excavation of the basement , please click on picture for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
7/3/2020 more excavation during the past week. Note the builders have closed off the side street. Please click on picture for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
Update 22/3/2020 work has started on the basement footings. Please click on picture for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
In the last week they have excavated right up to the existing building on the boundary and installed temporary wall bracing to support the side wall.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
This project is making good progress. The basement columns are complete and some concrete precast panels have being installed. Please click on picture for bigger.
[U/C] Re: 210 Greenhill Road, Eastwood | ~24m | 7 Levels
2/5/2020 now starting work on ground floor. Please click on picture for bigger.