[U/C] 399 King William Street | ~52m | 16 Lvls | Mixed
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Update 4/8/2024 -work on forming up the footings for the new building is going on behind the site fence.
- gnrc_louis
- Legendary Member!
- Posts: 1001
- Joined: Sat Nov 10, 2018 2:04 pm
- Location: Adelaide
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Description
Variation to DA 22038681 for the construction of a mixed-use building
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Concrete pour for ground floor footing completed Saturday afternoon. No sign of where crane base could go. Maybe within very small core or right at far west end of site if there is going to be any lane between neighbouring building, where white ute is parked.
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Did notice guys working late in to the night preparing for this last week.
- gnrc_louis
- Legendary Member!
- Posts: 1001
- Joined: Sat Nov 10, 2018 2:04 pm
- Location: Adelaide
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Nice that after so many false dawns, this site is finally going ahead.
- timtam20292
- Super Size Scraper Poster!
- Posts: 1555
- Joined: Tue Apr 19, 2016 1:03 pm
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Was going to say something similar on this thread. No work since the foundation was laid.Ben wrote:No one has been on site for a month.
Sent from my iPhone using Tapatalk
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Shipping containers have been placed on the foundations 

- gnrc_louis
- Legendary Member!
- Posts: 1001
- Joined: Sat Nov 10, 2018 2:04 pm
- Location: Adelaide
- timtam20292
- Super Size Scraper Poster!
- Posts: 1555
- Joined: Tue Apr 19, 2016 1:03 pm
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Were they placed directly over the plumbing?Ben wrote:Shipping containers have been placed on the foundations
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
I couldn’t tell. I just quickly drove past.timtam20292 wrote: ↑Thu Oct 31, 2024 6:18 pmWere they placed directly over the plumbing?Ben wrote:Shipping containers have been placed on the foundations
I think this developer built the August Towers though? That was one of the most drawn out developments ever and wasn’t finished in the end.
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
I am not sure if this developer (Festival State Building Group) has any association with Build 29 who developed August Towers.Ben wrote: ↑Thu Oct 31, 2024 6:24 pmI couldn’t tell. I just quickly drove past.timtam20292 wrote: ↑Thu Oct 31, 2024 6:18 pmWere they placed directly over the plumbing?Ben wrote:Shipping containers have been placed on the foundations
I think this developer built the August Towers though? That was one of the most drawn out developments ever and wasn’t finished in the end.
https://www.adelaidenow.com.au/messenge ... cd50622540
Hope we're not left with a New (new) Mayfield.
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
why start building then stop?
are there some kind of laws that stipulate building must commence in set timeframe, but there's no requirement to complete?
are there some kind of laws that stipulate building must commence in set timeframe, but there's no requirement to complete?
tired of low IQ hacks
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2864
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
Yes, construction only needs to 'substantially commence' within 24 months of approval.
n summary the regulation variations ensure that:
a planning or building consent is valid for 24 months
an applicant has 24 months to substantially commence an approved development
for those applicants that initially only seek planning consent (and then seek building consent and development approval once finance is secured), they would have an extra 24 months (than the current timeframes) to secure finance and commence an approved development.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[U/C] Re: 399 King William Street | ~52m | 16 Lvls | Mixed
so this seems to be the loophole these dodgy non-developers are exploitingChillyPhilly wrote: ↑Mon Nov 04, 2024 11:16 amYes, construction only needs to 'substantially commence' within 24 months of approval.
n summary the regulation variations ensure that:
a planning or building consent is valid for 24 months
an applicant has 24 months to substantially commence an approved development
for those applicants that initially only seek planning consent (and then seek building consent and development approval once finance is secured), they would have an extra 24 months (than the current timeframes) to secure finance and commence an approved development.