Apart from the South Road superway, the tram overpass, the Anzac highway underpass of course? As well as this 1KM stretch between the end of the expressway to beyond Sturt road that is going to be fixed up too?Ben wrote:I'm angry at this for two reasons.
- The current Labor government is eithier constructing or promising to construct these expressways on the northern and southern ends of the city with nothing in the metropolitan area where majority of people live and commute. They're bringing everyone in faster but once there are here they can not move as we have a 2 lane major corridor, that is full of traffic lights and bottle necks. When will they realise they need to work in to out not vice versa as this clogging up our roads!!
So in terms of urban stretches of south road, you have
- South road, bedford park: Approx 1.5KM
- Tram overpass and anzac highway: Approx 1.2KM
- South Road superway: Approx 5.4KM
Total: 8.1KM
All fixed or going to be fixed. This compares to a total length of about 22KM for south road from the port river expressway to Marion Road. Not Bad!
You are assuming that the render, which was probably produced by the department in the last few days in a rush in order to meet the announcment, is actually the final design.Ben wrote: - Secondly another short sighted decision. reducing the number of lanes from 3 down to 2. This is not going to ease congestion but actually induce it by reducing the number of lanes.
Ben wrote: What we NEED is actually quite simple. We need a non stop North - South corridor of 3 lanes or more, with no traffic lights, frieght/train/tram crossings.