[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Mon May 06, 2024 2:25 pm
by Prodical
Not sure if this means anything...
But there were two Delta trucks in the parking area out front today - Delta do demolition so hopefully TBC.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Tue May 07, 2024 11:39 am
by Capbld
Prodical wrote: ↑Mon May 06, 2024 2:25 pm
Not sure if this means anything...
But there were two Delta trucks in the parking area out front today - Delta do demolition so hopefully TBC.
Synergy have picked this up, walked past earlier today and Delta were inside undertaking demolishing works, this project is definitely live and underway.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Tue May 07, 2024 12:01 pm
by Prodical
Thanks
Great that an Adelaide based construction company has picked this up - and they move quickly
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Tue May 07, 2024 12:01 pm
by baytram366
I have read conflicting information on this one. Are they keeping the facade of the current building or not?
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Tue May 07, 2024 12:34 pm
by Prodical
does not seem to be retained from their photo.
Pity - it could have blended in well.
[U/C] Re: [APP] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Tue May 07, 2024 12:56 pm
by PD2/20
AG wrote: ↑Sat Oct 01, 2022 12:12 pm
citywatcher wrote: ↑Fri Sep 30, 2022 11:12 pm
Ben wrote:SCAP
Why only a partial demolition?
Sent from my SM-A515F using Tapatalk
Probably a reference to the front facade being kept as part of the new building.
In this application No 22032905 by Hindmarsh, work is described as "Part demolition of existing building (canopy)". There is a separate application No. 22008384 by Doma c/o Future Urban for demolition of the entire building.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Tue May 07, 2024 1:18 pm
by Prodical
Maybe the existing facade will be incorporated as part of the first 2 levels? Hard to see in the available photos. This one seems to show the facade included.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Wed May 08, 2024 12:36 pm
by bigdog69
Terrific work, looking forward to see the progress of the site!
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Thu May 09, 2024 12:14 pm
by Prodical
There were lots of people on site yesterday - 20+ and installing barriers and with a bob cat inside. Will get a photo on the weekend but it is definitely underway
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Thu May 09, 2024 12:14 pm
by Prodical
There were lots of people on site yesterday - 20+ and installing barriers and with a bob cat inside. Will get a photo on the weekend but it is definitely underway
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Sun May 12, 2024 5:31 pm
by Prodical
Photo from today
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Wed Jun 26, 2024 3:39 pm
by Prodical
The rear 2/3 of the building is almost demolished - will try to get some photos on the weekend.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Sat Jun 29, 2024 9:38 am
by Dvious
Walked past yesterday and the front of the building was all tarped/covered up. Still a little sad they couldnt find a way to integrate the existing facade in to the design.
Lets just hope this doesnt get demolished and left empty.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Wed Jul 03, 2024 11:29 am
by Llessur2002
Courtesy of abando_hunters on Instagram.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Posted: Thu Jul 11, 2024 3:50 pm
by RedDust
Can anyone share plans of the proposed development? I can't find them anywhere!
It looked as though they had been intending to save the front facade, even having people jackhammer the facade to a desired height. After a few days of inactivity (probably for engineer consultation) they are back and the whole facade is coming down. I guess it wasn't structurally viable?