
It's a large file - pixel wise, but small resolution for those on limited internet speeds.
Would much appreciate your feedback.

EDIT: I figure I should explain some things, before some people go "what the?"...
As part of the "vision", it would involve a heavy restructuring of how the train network would operate, shifting away from an intermediate travel-based system, to more of a rapid-transit system. Many existing stations would face closure to facilitate this effect. Some have been relocated, some have been renamed. Furthermore to add to this effect, in terms of maximizing operational speed, frequency and capacity, station distances are approximately 2-3 kilometers apart - with the exception of those within the CBD area. The rail network would be entirely grade-separated, thus - all level crossings would be eliminated.
Some key features.
[*] Red Line and Blue line go through in a new underground tunnel from the Goodwood Junction to Adelaide Railway Station.
[*] New Yellow Line, utilizing old Dry Creek rail corridor, serving as a dual-purpose cross-city and Airport Line route (to accommodate for my other vision, the relocation of Adelaide Airport to Dry Creek)
[*] New Mitcham to Belair rail tunnel to bypass the existing Belair rail corridor, in order to maximise effective travel times to and from Mount Barker (Green Line). Existing Belair route would be converted to light-rail.