[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1381 Post by Nathan » Sun Jul 17, 2016 10:00 pm

Driving over the Morphett St bridge yesterday, it looked like some cladding had been put on the very top surface. Not 100% sure though.

EBG
Super Size Scraper Poster!
Posts: 3096
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1382 Post by EBG » Sun Jul 17, 2016 11:03 pm

Yes cladding is being installed on the roof on the Morphett St side . But the final colour is still not clear due to the temporary protective film. Some more pictures of the East and North sides from Saturday 16 July.
Attachments
20160716_cc.jpg
20160716_cc.jpg (396.76 KiB) Viewed 5408 times
20160716_cc2.jpg
20160716_cc2.jpg (286.75 KiB) Viewed 5408 times

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3816
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1383 Post by Nathan » Sun Jul 17, 2016 11:12 pm

EBG wrote:Yes cladding is being installed on the roof on the Morphett St side . But the final colour is still not clear due to the temporary protective film. Some more pictures of the East and North sides from Saturday 16 July.
What I saw didn't appear to have the protective film on it, it looked like the brown/bronze finish we're expecting.

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3816
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1384 Post by Nathan » Wed Jul 20, 2016 12:23 pm

More of the brown cladding was being installed this morning on the western side, just above the rear of the bistro. Couldn't tell how well it picks up the light though, since being the morning, the sun was behind.
IMG_4541.JPG
IMG_4541.JPG (197.67 KiB) Viewed 5202 times

EBG
Super Size Scraper Poster!
Posts: 3096
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1385 Post by EBG » Wed Jul 27, 2016 10:48 pm

Here are some pictures (Wednesday 27 July) of the brown (not golden) cladding on the roof and the western side. I hope the whole building is not going to be this colour .It appears to be far too dark although it was an overcast (rainy ) day.
Attachments
20160727_CC1.jpg
20160727_CC1.jpg (287.09 KiB) Viewed 4916 times
20160727_CC2.jpg
20160727_CC2.jpg (166.99 KiB) Viewed 4916 times

thecityguy
High Rise Poster!
Posts: 197
Joined: Sun Nov 15, 2015 2:32 am

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1386 Post by thecityguy » Thu Jul 28, 2016 12:27 am

Brown!! Ahh this is Vue all over again


Sent from my iPhone using Tapatalk

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2130
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1387 Post by Llessur2002 » Thu Jul 28, 2016 10:39 am

I imagine (hope) this is different cladding used for the less conspicuous parts of the building. The fact that it doesn't have the protective wrap of the cladding that's on the other parts of the building gives me hope that the protective wrap is for the shiny stuff and not needed for the brown panels...

Looking at the original render, the bit they're currently cladding on the western side of the building seems to be shown to be clad in a different material to the main structure (albeit grey, not brown) - although the structure has changed somewhat around this area (with the addition of another window?):

Image

aeon
Gold-Member ;)
Posts: 69
Joined: Sat Aug 30, 2008 1:39 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1388 Post by aeon » Mon Aug 01, 2016 10:16 pm

Saw stage 2 of this up close for the first time and while I've never really liked it from a distance I think the Torrens and Morphett St sides actually work really well. Larger photos here - http://imgur.com/a/TryIN

Image

Image

Image

Image

Image

Image

Image

aeon
Gold-Member ;)
Posts: 69
Joined: Sat Aug 30, 2008 1:39 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1389 Post by aeon » Tue Aug 02, 2016 9:21 pm

And some of stage 3. Larger here - http://imgur.com/a/Rty1C

Image

Image

Image

Image

Image

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2130
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1390 Post by Llessur2002 » Wed Aug 03, 2016 5:13 pm

Wrapping's off on the east side! Looks coppery. I like.

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2130
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1391 Post by Llessur2002 » Wed Aug 03, 2016 6:00 pm

Sorry about the quality - my phone's off 2009. Frankly I'm lucky it does pictures.

Image

Was hard to tell exactly what the finish was but it certinly looks metallic - like the front of the Oval but possibly a bit lighter (might weather darker over time I guess). Will cycle past it on the way to work in the morning to see how it looks in the sun!

Link to larger image if you want to zoom in and marvel at its graininess: http://i.imgur.com/rrKkePr.jpg

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2130
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1392 Post by Llessur2002 » Thu Aug 04, 2016 8:22 am

Popped past this morning for another look. It's good - definitely a metallic finish of some sorts, not over-the-top shiny but it has a sheen to it. Looks like copper to me but not being a metallurgist that'll be the extent of my analysis for now. It picks up the light nicely, should look good in my opinion.

Image
http://i.imgur.com/V1dhwwa.jpg

Image
http://i.imgur.com/YJ3cfbx.jpg

Hopefully someone with a better camera will come along shortly...

I Follow PAFC
High Rise Poster!
Posts: 447
Joined: Tue Jul 08, 2014 7:23 pm

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1393 Post by I Follow PAFC » Thu Aug 04, 2016 3:16 pm

From https://www.facebook.com/AdelaideConventionCentre/
Image

The Adelaide Convention Centre's Stage Two expansion has reached a milestone, with the zinc panelling exterior installed on the East Building this week. Woods Bagot principal Stuart Uren explains: "Zinc proved to be the perfect cladding material for this building. It is long lasting and malleable, able to follow the curved, folded shapes of the building. Zinc is a plentiful resource, it is non-toxic and is 100% recyclable."
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/

User avatar
rhino
Super Size Scraper Poster!
Posts: 3090
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1394 Post by rhino » Thu Aug 04, 2016 3:22 pm

So ...... Zinc .....
cheers,
Rhino

User avatar
Llessur2002
Super Size Scraper Poster!
Posts: 2130
Joined: Mon Mar 17, 2014 4:59 pm
Location: Inner West

[COM] Re: Adelaide Convention Centre - Stage 3 | $350m

#1395 Post by Llessur2002 » Thu Aug 04, 2016 3:43 pm

I don't zinc it looks bad.

*chortle*