[U/C] Re: M2 North-South Motorway

#5026 Post by Spotto » Wed Dec 23, 2020 9:42 pm

Bacon wrote:
Wed Dec 23, 2020 7:30 pm
Major works in early January 2021

In early January 2021, the overpass centre spans will be transported from the Polonia Reserve compound to their final location, over Regency Road, using Self Propelled Modular Transporters.

To allow for these works to occur safely and efficiently, from 5am Monday, January 4, 2021 until 5am Monday, January 11, 2021, weather permitting, there will be a partial closure of the South Road and Regency Road intersection. At completion of the overpass installation, the South Road and Regency Road intersection will reopen.

Dedicated public viewing areas will be positioned on the east and west sides of the intersection for stakeholders to view the major works. Please register your interest with the R2P Alliance via email or phone call if you wish to view the works with project personnel in attendance to explain the works and answer questions. There will be limited spaces and changes are subject to COVID-19 restrictions.

For details on the January works, including the changes to traffic, bus routes and work scope, please visit our web page: https://r2palliance.com.au/project/late ... works-2021.
I wouldn't be surprised if the intersection is reopened much sooner. The bridge moves at Darlington were scheduled to close the road for a full weekend (closed Friday evening, reopened for Monday morning) but IIRC in the cases of the two southernmost bridges works were completed around late Saturday or early Sunday. Granted, R2P is moving two bridge pieces instead of one, but the quick success of previous works bode well. The week-long closure is likely a safety net just in case anything goes wrong.

SBD
Super Size Scraper Poster!
Posts: 2723
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[U/C] Re: M2 North-South Motorway

#5027 Post by SBD » Thu Dec 24, 2020 12:52 am

Spotto wrote:
Wed Dec 23, 2020 9:42 pm
Bacon wrote:
Wed Dec 23, 2020 7:30 pm
Major works in early January 2021

In early January 2021, the overpass centre spans will be transported from the Polonia Reserve compound to their final location, over Regency Road, using Self Propelled Modular Transporters.

To allow for these works to occur safely and efficiently, from 5am Monday, January 4, 2021 until 5am Monday, January 11, 2021, weather permitting, there will be a partial closure of the South Road and Regency Road intersection. At completion of the overpass installation, the South Road and Regency Road intersection will reopen.

Dedicated public viewing areas will be positioned on the east and west sides of the intersection for stakeholders to view the major works. Please register your interest with the R2P Alliance via email or phone call if you wish to view the works with project personnel in attendance to explain the works and answer questions. There will be limited spaces and changes are subject to COVID-19 restrictions.

For details on the January works, including the changes to traffic, bus routes and work scope, please visit our web page: https://r2palliance.com.au/project/late ... works-2021.
I wouldn't be surprised if the intersection is reopened much sooner. The bridge moves at Darlington were scheduled to close the road for a full weekend (closed Friday evening, reopened for Monday morning) but IIRC in the cases of the two southernmost bridges works were completed around late Saturday or early Sunday. Granted, R2P is moving two bridge pieces instead of one, but the quick success of previous works bode well. The week-long closure is likely a safety net just in case anything goes wrong.
Were the roads under the Darlington bridges open immediately after they were moved in to place? Regency Road will need (partial) closure if there need to be cranes parked on it to do post-move finishing such as guard rails or welding into place.

Brucetiki
Legendary Member!
Posts: 995
Joined: Tue Apr 17, 2012 6:20 pm

[U/C] Re: M2 North-South Motorway

#5028 Post by Brucetiki » Wed Jan 06, 2021 9:54 am

Looks like work is progressing incredibly well on the South Rd bridge over Regency Rd.

The first span was mostly in Monday. I believe the second span goes up today

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6423
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#5029 Post by rev » Wed Jan 06, 2021 4:29 pm

Brucetiki wrote:
Wed Jan 06, 2021 9:54 am
Looks like work is progressing incredibly well on the South Rd bridge over Regency Rd.

The first span was mostly in Monday. I believe the second span goes up today
There's 6 pieces all up.
Two large ones in the middle covering the majority and four smaller ones on either end.

Columbo
Sen-Rookie-Sational
Posts: 29
Joined: Thu Oct 24, 2019 8:37 pm

[U/C] Re: M2 North-South Motorway

#5030 Post by Columbo » Wed Jan 06, 2021 11:21 pm

rev wrote:
Wed Jan 06, 2021 4:29 pm
Brucetiki wrote:
Wed Jan 06, 2021 9:54 am
Looks like work is progressing incredibly well on the South Rd bridge over Regency Rd.

The first span was mostly in Monday. I believe the second span goes up today
There's 6 pieces all up.
Two large ones in the middle covering the majority and four smaller ones on either end.
The second large span is loaded up and has been moved closer to the road and looks ready to roll in the morning.

kymbosa
High Rise Poster!
Posts: 113
Joined: Mon Aug 06, 2007 4:39 pm

[U/C] Re: M2 North-South Motorway

#5031 Post by kymbosa » Thu Jan 07, 2021 3:40 pm

Anyone aware of what the issue is at Darlington at the moment? The lower deck heading north on Monday was 80km since than it has been reduced under the flinders/Sturt road bridges to 40km.

kymbosa
High Rise Poster!
Posts: 113
Joined: Mon Aug 06, 2007 4:39 pm

[U/C] Re: M2 North-South Motorway

#5032 Post by kymbosa » Fri Jan 08, 2021 5:53 pm

Well Nine Adelaide has picked it up and have a story on the developments at Darlington tonight.
DAEC9DEE-713C-447E-9869-D98A2F7D82F6.jpeg

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6423
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#5033 Post by rev » Fri Jan 08, 2021 6:17 pm

Lmfao SA the banana republic state of Australia

User avatar
Spotto
Legendary Member!
Posts: 753
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: M2 North-South Motorway

#5034 Post by Spotto » Sat Jan 09, 2021 11:33 pm

Interesting that they updated the status map for the Northern Connector to "Operational since March 2020" but T2T is still "Currently under construction" despite having finished 2 years before they would've updated the Northern Connector field. Also, T2D is coloured blue for completed despite still being in planning.

https://www.dit.sa.gov.au/nsc/northsouthcorridor

Columbo
Sen-Rookie-Sational
Posts: 29
Joined: Thu Oct 24, 2019 8:37 pm

[U/C] Re: M2 North-South Motorway

#5035 Post by Columbo » Sat Jan 09, 2021 11:48 pm

The last of the smaller pieces of the bridge over Regency Rd looked like it was all in place about 8.30 tonight.

All the traffic light poles were back in place and some of the fences near the eastern viewing areas seemed to have been removed, looks to be all on track for the reopening on Monday morning.

User avatar
Norman
Donating Member
Donating Member
Posts: 6485
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: M2 North-South Motorway

#5036 Post by Norman » Sun Jan 10, 2021 12:54 pm

New gantries and Variable Message Displays have been installed along the southern part of the Superway, as well as South Road Northbound just before Regency Road. Most of the new road seems to be in place, so I suspect cars will be travelling on the new section and the bridge in the next 3-6 months.

mawsonguy
High Rise Poster!
Posts: 198
Joined: Fri Dec 20, 2013 8:11 am

[U/C] Re: M2 North-South Motorway

#5037 Post by mawsonguy » Tue Jan 12, 2021 3:33 pm

Bridge spans are in place (courtesy of Adelaide Now):

Image

User avatar
Spotto
Legendary Member!
Posts: 753
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: M2 North-South Motorway

#5038 Post by Spotto » Tue Jan 12, 2021 4:07 pm

mawsonguy wrote:
Tue Jan 12, 2021 3:33 pm
Bridge spans are in place (courtesy of Adelaide Now)
Time to start counting down! This section is going to be finished this year and the government will still be scratching their heads over the final Torrens to Darlington section, the only section that they've needed to design and build themselves.

kymbosa
High Rise Poster!
Posts: 113
Joined: Mon Aug 06, 2007 4:39 pm

[U/C] Re: M2 North-South Motorway

#5039 Post by kymbosa » Tue Jan 12, 2021 9:28 pm

Spotto wrote:
Tue Jan 12, 2021 4:07 pm
mawsonguy wrote:
Tue Jan 12, 2021 3:33 pm
Bridge spans are in place (courtesy of Adelaide Now)
Time to start counting down! This section is going to be finished this year and the government will still be scratching their heads over the final Torrens to Darlington section, the only section that they've needed to design and build themselves.
Which if they hold out long enough and lose the next election in March 2022, than they would have achieved nothing.

No plans, no design and no idea when it has come to this section besides, announcement of doing nothing.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2764
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#5040 Post by ChillyPhilly » Tue Jan 12, 2021 9:34 pm

We all know that Torrens to Darlington is going to be an election issue.
Our state, our city, our future.

All views expressed on this forum are my own.