[U/C] 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
picture of the piling rig, 2/10/2024
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Piling rig has finished. This hotel will be a nice addition to North Tce.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
The site is moving quick. Looking forward to see what the site will look like end of the year.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Great view those balconies on the existing hotels are going to have
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
A couple of photos from today - there are outside stairs on the adjacent building so some better shots of the foundations.
Wondering if the foundation with the 4 columns is for the crane base?
Wondering if the foundation with the 4 columns is for the crane base?
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
I'd say you're correct Prodical, that looks like a crane pad to me!
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
Is it a bit odd to be putting the crane at the back of the site like that when access to the site is from the front?
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
I don't think that's the crane pad. Looks like a pad footing with starter bars for columns. Crane pad would be near the front of the site.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
crane base (non Favco type) being installed on footpath at front of site today - see crane news.
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
A quick photo from a moving tram...
There have been lots of concrete pours lately for the slab, with a large cube of concrete on the north tec footpath with the crane base enclosed in it.
Wondering if the crane will have to start of high (ie around 16 levels off the ground) so as not to disturb residents in the apartments on either side? The heavy concrete crane base would provide stability until the crane can be anchored to the side of the building as it rises?
There have been lots of concrete pours lately for the slab, with a large cube of concrete on the north tec footpath with the crane base enclosed in it.
Wondering if the crane will have to start of high (ie around 16 levels off the ground) so as not to disturb residents in the apartments on either side? The heavy concrete crane base would provide stability until the crane can be anchored to the side of the building as it rises?